Loading...
4104 Imp GICO Addition 00 NOT WRITE III 'HIS SPACE ,PEtiTION NUI\BER <-flo4 FILED '95 RUG 2 AI') 11 ~~ TOI THE COVERHINC BODY City of s.llnl, Kin... CITY OF SAUl/A, KS CITY CLERK'S OffiCE (0\) We, the underalvned, beln, ownera of record of property '"ble for u.......nt for the followlnll Illprov...entll See Exhibit "A" I.. ....................,. "................. hereby propo.e thlt .uch IlIproveJlent be ....de In the ...nner provided by Article 6.0, Chlpter 12 of the Klnses Statute. Annoteted. .. emended. (B) The estimate or probable cost of such improvement Is Five Hundred Sixteen Thousand Eight Hundred Thirty Two and 00/100 Dollars. ($516,832.00 0 (0) The proposed method of usessment Is, shall be based on equal assessments for each lot of land and without regard to buildings or improvements of the land. (E) Thlllroposed epportlol1llent of costs between the Improvement district end the Clty-at-Terge Is, * percent (-----..') to be ISseued against the Improvell8nt district and percent (-') to be ...eased against the City-at-large. If) We further propose that such Improvement be made without notice and heerlng IS required by K.S.A, 12-6a04(1) IS all8nded. ~... ....... AI. O. o. 0 0 0 0 0 "'....U.. AI 0 0 0 0 0 - -.. "">AU A 0 0 0 0 0 0 0 A""" AU" 0 0.." ..0 0"""0" 0 0 A A A 0 0 0 A.", .. !ie, name may be ..Ithdrawn from this petition ilfterthe Covernlng Body c_nces consideration .. .. of the petition or latar than seven (7) days after this petition hIS bean flied ..Ith the City Clerk .. * (K.S.A. 12-6a04) .. ---- -------- ...... ....au.... 0 0" 0 o. """'0""" a.o 0 0"'", """'.0 0 o.u.o.... 0" "".0 0 0 0 "'0" ouo a >A 0 0 0 0 000 - 0 0 Re,pectfully .uball ttlld by Telephone Number ~7 ',]!1f- 825'2033 Mr. James Copas I!I8m8 ~ 8WIenca Dale & Tune ~ Property owned within the propauod Improvlment Di."..,\ ~"bcu-i I\\. C.[ ~ ~J1~ Rl(2¥ u~~ 8'-2'95 11:'15 ,AT' '1 J(ú.ö W~ J.q~., .1 C "77y.~ -:;¡, 10&, I -!ri"7 If ¿"'I, ~- :1 -c;ç $ ~¡1,;" {4f;.r¿w I * Apportionment of cost in the improvement district to be based upon project feasibility report and actual project costs due to existence of city-owned park in the benefit di5trict. Exhibit "A" The curbing, guttering, grading, and paving of Faith Drive from the south line of McAdams Road to the north line of Republic Avenue to serve Lots 1 through 4. Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, BloCk 3; Lots 1 through 8. Block 4; Lots 1 through 21, Block 5, GICO Addition; City Park, all in GICO Addition. The curbing, guttering, grading. and paving of Faith Drive from the south line of McAdams Road to the north line of Republic Avenue to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8. Block 4; Lots 1 through 21, Block 5. City Park, all in GICO Addition. The curbing, guttering, grading, and paving of Courtney Drive from the north line of Republic Avenue to the south line of Lot 1, Block 4, GIOO Addition to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; and Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading, and paving of Martin Avenue from the east line of Meyer Drive to the west line of Faith Drive to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, gutterÍl.g, grading and paving of Kaci Court from the west line of Faith Drive to the cul-de-sac to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading and paving of Republic Avenue from the west line of Courtney Drive to the west line of Lot 1, Block 3, GICO Addition to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots l.through 7. Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, block 5; City Park; all in the GICO Addition. The installation of sanitary sewer main to serve Lots 1 through 4-, Block 1; Lots 1 through 23. Block 2; Lots 1 through 7, Block 3; Lot 1, Block 4; Lots 1, 13, ans 14, Block 5;and City Park; all in GICO Addition. The installation of water main to serve Lots 1 through 4, Block 1; -Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot-I, Block 4; Lots 1, 13, and 14, Block 5; and City Park. all in GICO Addition. The installation of a stoum drainage system to serve Lots 1 through 4. Block 1, GICO Addition; Lots 1 through 23, Block 2, GICO Addition; Lots 1 through 7, Block 3, GICO Addition; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, GICO Addition. Augu" 11, 1995 Mr. Don Hoff Director of Engineering & Utllitie, City of Salina P. 0, Box 736 Salina, K,. 67402-0736 Re. 4104 Dear Mr, Hoff. Due to a technical error in the Scope of Work in the Fea,ibllity Report (File No, 95-5) and in Exhibit "A", Petition No, 4104, reque"ing "reet and ucility improvements to eerve certain lots in GICO Addition, I hereby coneent and agree to the modification, in the two attached revieed documents, It waa my intention to improvements on Couetney Dr. from the north line to the north line of Bradahaw Dr,!Ea"gate to allow thia project to "A" Work SCOPE OF WORK The curbing, guttering, grading, and paving of Faith Drive from the south line of McAdams Road to the north line of ReDublic Avenue to serve Lots 1 through 4, Block 1; Lots 1 through 23. Bleck 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5, GlCO Addition; City Park, all in GlCO Addition. The curbing, guttering, grading, and paving of Courtney Drive from the north line of Republic Avenue to the north line of Bradshaw Dr./Eastgate Dr. to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; tots 1 through 7, Block 3; and Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GlCO Addition. The curbing, guttering, grading, and paving of Martin Avenue from the east line of Meyer Drive to the west line of Faith Drive to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GlCO Addition. The curbing, guttering, grading and paving of Kaci Court from the west line of Faith Drive to the cul-de-sac to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GlCO Addition. The curbing, guttering. grading and paving of Republic Avenue from the west line of Courtney Drive to the west line of Lot 1, Block 3, GlCO Addition to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, block 5; City Park; all in the GlCO Addition. The installation of sanitary sewer main to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot 1. Block 4; Lots 1, 13, ans 14. Block 5;and City Park; all in GlCO Addition. The installation of water main to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot 1, Block 4; Lots 1, 13, and 14. Block 5; and City Park, all in GlCO Addition. The installation of a storm drainage system to serve Lots 1 through 4. Block 1, GlCO Addition; Lots 1 through 23, Block 2, GlCO Addition; Lots 1 through 7, Block 3, GlCO Addition; Lots 1 through 8, Bl,ock 4; Lots 1 through 21. Block 5; City Park,- GICOAdditiön. Revised 8/7/95 2 Exhibit "A" The curbing, guttering, grading, and paving of Faith Drive-from the south line of McAdams Road to the north line of Republic Avenue to serve Lots 1 through 4, Block 1; Lots 1 through 23. Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5. GICO Addition; City Park. all in GICO Addition. The curbing. guttering, grading, and paving of Courtney Drive from the north line of Republic Avenue to the north line of Bradshaw Dr./Eastgate Dr. to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; and Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading, and paving of Martin Avenue from the east line of Meyer Drive to the west line of Faith Drive to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7; Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading and paving of Kaci Court from the west line of Faith Drive to the cul-de-sac to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading and paving of Republic Avenue from the west line of Courtney Drive to the west line of Lot 1, Block 3, GICO Addition to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8. Block 4; Lots 1 through 21, block 5; City Park; all in the GICO Addition. The installation of sanitary sewer main to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot 1, Block 4; Lots 1, 13, ans 14, Block 5;and City Park; all in GICO Addition. The installation of water main to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot 1, Block 4; Lots 1, 13. and 14. Block 5; and City Park, all in GICO Addition. The installation of a storm drainage system to serve Lots 1 through 4, Block 1, GICO Addition; Lots 1 through 23, Block 2, GICO Addition; Lots 1 through 7, Block 3, GICO Addition; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park. GICO Addition. Revised 8/7/95 .