CIP 1988 - 1992
I
I
I
I
I
I
I
I
.1
I
I
II
I
,I
I
]1
I
_.1
I
I
PROPOSED
1988-1992
CAPITAL IMPROVEMENT PROGRAM
CITY OF SALINA, KANSAS
July 6, 1987
RUFUS L. NYE
CITY MANAGER'
I
I
I
I
I
I
I
I
I
I
I
I.
I
Ii
I,
I,'
I,
I_~
1.-
City of Salina Board of Commissioners
Steve Ryan
Sidney Soderberg
Bob Frank
Vi Justus
Joe Warner
Mayor
Vice-Mayor
Commissioner
Commissioner
Commissioner
Salina City Planning Commission
Elizabeth Ann Duckers
Sherry Denton
Fred Gaines
Don Morrison
Paul Mott
Roy Presley
Frank Roth
Wally Storey, Jr.
Cha i rman
Vice-Chairman
CIP Administrative Committee
Roy Dudark
Director of Planning
& Community Development
Director of Finance
Assistant City Engineer
Director of Community Services
Director of General Services
Don Harrison
Don Hoff
Don Jolley
Frank Weinhold
Prepared By:
Department of Planning & Community Development
I
I
I
I
I
I
I
I
I
I
I
I
I
'I
I
I
I
I
I
Table of Contents
Page
Table of Contents
1
2
List of Tables
Abbreviations and Legend
Part I - Introduction
3
4
Part II - Policy Guidelines
Part III - Capital Improvement Program
6
8
1988 Capital Budget
1989 Capital Program
15
29
1990 Capital Program
1991 Capital Program
36
45
1992 Capital Program
Priority IV (Unfunded) Projects
52
58
Project Rating Criteria
59
I
I
Table
I 1
I 2
3
I 4
I 5
6
I 7
8
I 9
I 10
I
I
I
I
I
I
..1
.1
,~I
.1
.1
.1
List of Tables
Pãge
GO Bonded Debt, Assessed Valuation and Population
GO Debt Service and Sales Tax Capital Outlay
10
11
Projected Sales Tax Revenues and Expenditures
General Bond and Interest Fund Projections
12
13
Capital Funding:
1988-1992 CIP
14
15
1988 Capital Budget
1989 Capital Program
1990 Capital Program
1991 Capital Program
1992 Capital Program
29
36
45
52
2
I
I
I
I
I
I
I
I
/1
I
I
I
.1
I
I
.1
-I
.1
-I
ABBREVIATIONS AND SYMBOLS
Methods of Financing
GO
GOSA
GORB
ST
F
S
GF
0
Map Legend
x
... ~ ...,..
.
p
u
m
General Obligation Bonds - City at Large
General Obligation Bonds - Special Assessment District
General Obligation Bonds - Revenue Financed
Sales Tax
Federa 1 Funds
State Funds
General Fund - Annual Operating Budget
Other
Street
Briåge
Drainage
Public Building
Park
Water/ Sewer Utility
Miscellaneous
3
I
I
I
I
I
I
I
'I
I
I
I'
.1
.1
I
.1
.1
1
,I
1
Part I
Introduction
A Capital Improvement Program (CIP) is one of the major tools available to
achieve desired growth and development. The CIP is an important statement
of the City's policy regarding long-range physical development of the com-
munity. Through the types of public projects funded and their location,
private investment is induced resulting in community growth and change.
Combined with financial targets, the Capital Program represents a systematic
plan for providing needed improvements within a prioritized framework. While
there are competing demands for new improvements to urbanizing areas, exist-
ing developed areas must be attended to through the replacement of obsolete
facilities. These competing demands combined with the scarcity of current
revenues and the legal limitations and complexity of long-term debt financ-
ing, signal the necessity to formalize a method of prioritizing capital
projects and allocating future public resources.
The CIP covers a five-year period and sets the general schedule within which
pub li c improvements wi 11 be undertaken. The fi rst year is recommended for
adoption as the Capital Budget for the coming year with the remaining years
considered a Capital Improvement Program. However, it should not be con-
sidered as a final and fixed program. The CIP is' intended to be reviewed and
revised annually. An additional year is thus added each year to maintain the
full five-year period of the program.
Reasons for Programmi ng Capi ta 1 ,Investments
There are several benefits to adopting a Capital Improvement Program:
1.
Provision of valuable information to the City Commission and citizenry
for decision-making regarding community development and budgeting.
Utilization of public funds to maximum advantage through improved timing
of improvements and coordination among departments.
2.
3.
Equitable distribution of public facilities according to need and demand
for services.
4.
Coordination of city projects with those of quasi-public and private
entities.
5.
Distribution of capital costs over time in order to achieve a more
consistent tax rate and maintain a sound debt management policy.
I nc'reased pri va te deve 1 opment and orderly growth through i mproved
community knowledge of intended public activities.
6.
4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Despite the many benefits of capital programming, directing public improve-
ments to achieve development objectives is very difficult. Some of the major
reasons are:
1.
Revenue sources are difficult to predict in advance due to changing
economic conditions and shifts in public policy.
Operating budgets frequently take precedence over capi ta 1 budgets and
reduce the number and scale of public improvements because capi ta 1
projects are easier to eliminate.
2.
3.
Certain public facility needs depend largely upon the location, scale
and timing of private economic decisions which are difficult to predict.
Community objectives are difficult to not only set but may be forgotten
at budget time when priorities often are based on subjective reasons.
4.
Nevertheless, ways must be found around these. difficulties in order to
increase the long-time benefit and return on the investment of limited public
funds. The formulation of clear policy objectives requires effective and
open communications between elected officials, administrators and involved
citizens. Discussions should encompass continuing obligations, emerging
needs, alternative solutions, and project benefits and costs.
There are several factors which will have a substantial impact on both the
scope and impact of a Capital Improvement Program for the City of Salina.
Each of these factors will influence either available' resources or the
specific projects selected for fund~ng. The most important factors include:
1.
Amount and type of des ired economi c actj vi ty and resu 1 tant phys i ca 1
development.
Availability and willingness to use state and federal funds.
2.
?
"".
Statutory debt limits and maximum local mill levy deemed feasible for
debt service.
4.
5.
.
Ability to set priorities among competing public facility needs.
Willingness to establish special assessment districts and/or utilize
impact/benefit fee financing.
In order to address these factors, and in so doing, obtain a reasonable and
workable Capital Improvement Program, the Board of City Commissioners, has
formulated several policy guidelines which are presented in Part II of this
document. Only through establishing a deliberate and reasoned policy posi-
tion can a Capital Improvement Program be formulated which reflects the
wishes of the general public through the governing body and thus achieve the
results intended.
5
I
I
I
I
I
I
I
I
I
I
I
1
, I
II
I
I
.1
I
.1
Part II
Policy Guidelines
Goal
Develop and implement a capital investment plan within the financial capacity
of the community sufficient to accommodate both existing and future develop-
ment within the City of Salina.
Development Policies
1.
Conserve and maintain the resources and stability of the entire city.
Strive to make the most efficient use of existing public improvements
and encourage the expansion of public facilities in a manner which
provides the greatest city-wide benefit.
Preserve and upgrade public facilities and services in the central
business district and surrounding older areas. Create a climate of
confidence about the future of such areas to attract the private
investment needed to ma i nta in i ndi vi dua 1 properti es. Undertake
rehabilitation projects on a selective basis to upgrade deteriorated
but promising areas.
2.
3.
Maintain the integrity and. character of established neighborhoods.
Continue the present level of public services and direct new spending
to needed public facility enhancements.
Promote the efficient, orderly and economic expansion of public facili-
ties and services at the urban fringe. Avoid scattered and premature
urbanization of rural areas. Direct public investment to areas directly
contiguous to already developed areas and provide only those public
facilities essential to support new development.
4.
Public Facility Policies
1.
In eva 1 ua t; ng cap ita 1 proj ects, fi rs t pri ori ty wi 11 be given to the
rehabil ; tati on or replacement of deter;orated/obso 1 ete facil i ties
required to maintain public health and safety; second priority will be
given to additions to existing facilities or new facilities needed to
bring an area up to a standard level of service; and, third priority
will be given to expanded facilities above minimum standards.
Projects which: a) create or retain jobs or b) contribute to commer-
cial area revitalization will be given special consideration.
2.
3.
Projects which require little or no land acquisition, result in a
decrease in operating and maintenance costs, or increase revenue to the
city will be given special consideration.
Projects that increase productivity and efficiency in the delivery of
city services will be given greater consideration.
4.
6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-I
11
,I
,I
~I
,.
::>.
Projects that benefit a larger area, serve a greater population or will
be used on a year-round basis will be given greater consideration.
Projects which complement related facilities or are coordinated with
other improvements, at a cost savings to the city, will be given greater
consideration.
6.
7.
Projects which support neighborhood betterment, enhance the environment
or promote historic preservation will be encouraged.
Financial Policies
1.
Protect the fiscal integrity of the city and maintain a balance between
the city's operating and capital improvement budgets.
Develop a Capital Improvement Program within the debt limitations
established by State law and which can be funded with a maximum local
debt service mill levy of 7.0 mills resulting in an average annual debt
servi ce payment of approximately $825,000 over the next five years.
2.
3.
Devote a minimum of 67-75 percent of local sales tax revenue or approxi-
mately $2.0-$2.5 million each year to capital improvements.
Maximize the impact of local tax dollars by recommending projects
eligible for alternative financing in the following order of preference:
1) federa 1 and state grants; b) speci a 1 benefi t di stri cts; c) revenue
bonds; d) special purpose bonds; and e) general obligation bonds.
4.
5.
Finance capital improvements for no more than the useful life of the
project.
Encourage priority projects which are entirely or partially financed by
private contributions or other units of government.
6.
7
I
I
I
I
I
I
I
I
I
I
I
I
-I
I
I
I
I
,I
.1
Part II I
Proposed Capital Improvement Program
Recent Financial Trends
The rãtio of General Obligation (GO) debt to assessed value has been stead-
ily declining from 8.56% in 1981 to 3.69% in 1987. Currently, the amount of
GO debt per capita has been reduced from $197.36 in 1981 to $91.82 in 1987.
These two prime indicators of community debt and borrowing capacity have
improved because of steady, albeit gradual, growth in assessed value along
with little new debt having been issued (see Table 1).
The City's allocation for Capital Improvements has changed remarkably since
1983 when sales tax revenues began to be received. Prior to this, capital
spending was limited to GO Bond debt service which amounted to 8.7% of total
spending. With the addition of the sales tax, total capital spending
increased to 18.6% in 1985. This percentage has fallen slightly to 15.2%
since that time, however (see Table 2).
Projected Financial Capacity
There are two main sources of revenue available for capital improvements -
the 1 oca 1 sa 1 es tax ana general ob 1 i gati on bonds. It is projected that
approximately $1.4 million of sales tax funds will be available annually for
a total of $7.2 million over the five year program time frame of 1988-1992.
This amount excludes approximately $1.9 million each year or a total of $9.8
million anticipated to be earmarked for various municipal functions (see
Table 3).
The amount of available GO bonds is a function of growth in assessed valua-
tion, existing and committed debt, and the tax levy considered acceptabl,e.
~ecause existing debt is diminishing, due in part to bond refunding in
October of 1986, the required mill levy could be reduced from 7.01 mills in
1987 to 1.87 mills in 1992 (see Table 4). If the mill levy for the Debt and
Interest Fund were maintained at 7.0 mills over this period, it is estimated
that $4.0 million of GO bonds could be issued without a tax increase.
Together, these two major sources of local capital financing could provide a
CIP of $11.2 million over the next five years.
Proposed Capital Improvement Program
The proposed CIP includes funding for 55 projects at a total cost of $24.8
million. After excluding $16.4 million in funds represented by nonlocal
taxes (federal and state grants, Saline County funds, utility revenue bonds,
etc.) $8.4 million in local taxes is needed to accomplish the program. It
is proposed that this amount be comprised of $5.6 million of sales taxes and
$2.8 million of GO Bonds. This would maintain a sales tax ending balance of
$1.7 million (see Table 5). The required mill levy to service the bonds
would peak in 1991 at 6.9 mills, slightly below the self-imposed target
ceiling of 7.0 mills (see Table 4).
8
I
I
I
I
I
I
I
I
-I
I
-I
~I
JI
,"I
,~I
'..1
",I
~I
~I
1988 Capital Budget
Presented on Table 6 is the proposed Capital Budget for 1988. Consisting of
13 projects at an estimated cost of $3,728,000, these capital improvements
are considered to be of relatively higher priority and should receive careful
consideration. Each project is outlined on a separate page following the
1988 listing.
1989-1992 Capital Program
Each year of the 1989-1992 Capital Program is presented in succession in the
above format. These projects have been programmed for the selected year
according to rated priority, construction sequencing, and available funds.
However, considerable flexibility is inherent in the plan as determined most
appropriate to meet community needs and desires. It is intended that this
listing would provide the majority of 1989 projects as well as those for
subsequent capital budgets, although annual updating will be necessary.
Projects Not Recommended for Funding
At the conclusion of the CIP document, a recommended list of Priority IV or
unfunded projects is presented. These projects, while beneficial, are
believed to be of lesser priority, may be more appropriately considered in
the annual operating budget, or should seek alternate funding. However, it
may also be that certain projects are believed to be sufficiently desirable
that they should be reconsidered for inclusio~ within the program. Finally,
several requests were submitted for equipment. Such items are not true
capi ta 1 improvements and shou 1 d be requested in the, annual operating budget
or. the Equipment Reserve Fund. This fund is to be financed at $150,000 each
year from the sales tax (see Table 3).
To supplement this listing, the rating criteria is also provided. The rating
criteria were developed based on policy guidelines presented in Part II. For
purposes of further refinement of priorities, projects were classified into
one of the following broad categories and shown on each project sheet:
~~~ors~t¡et~: a~~ses~~~~ld be P~~~~~~~edWh:~h s~~~t~~bU:eeas;~l/u~~i~rd~e:li~
prevent harmful effects or avoid undesirable consequences.
Priority II: Important - Projects which meet clearly demonstrated
community needs or objectives.
Priority III: Desirable - Projects which benefit the community but can
be delayed somewhat without detrimental effects to basic services.
Priority IV: Deferrable - Projects which are not recommended for
inclusion in the five-year program at this time.
9
-
-
-
-
-
-
-
-
_'-
-
-
-
-
-
-
-
Table 1
Ratio of General Obi igation Bond Debt to Assessed Value and Population
Prior Year
Assessed Genera I Ratio of GO Total Bond and Interest
Budget City Va lue Ohltgatiyn Debt to GO Debt Tax Rate Fund Tax Rate
Year Population (in OOO's) Debt Assessed Value Per Capita (Mills) (Hills)
1980 41,843 $105,234 $7,841,592 7.45% $187.40 38.27 9.50
1981 42,309 97,4382 8,350,248 8.56% 197.36 39.45 10.66
1982 42,406 99,239 7,466,704 7.52% 176.07 40.84 10.36
1983 42,787 105,335 6,694,028 6.35% 156.45 36.36 8.75
..... 1984 42,933 104,1013 6,856,295 6.58% 159.69 36.36 8.41
0
1985 44,029 107,448 4,901,460 4.56% 111.3;1 36.36 6.61
1986 44,620 108,678 4,058,880 3.73% 90.96 36.36 7.74
1987 45,000 111,856 4,131,854 3.69% 91.82 36.36 7.01
~ Includes Ctty share of Special Assessment Bonds
3 Beginning tn 1981, excludes valuatton of motor vehicles
4 Beginning tn 1984, excludes valuation of farm machinery and aircraft
Limited to a maximum of 30% by state statute.
-
-
-
-
-
...
,
-
..
-
,
-
-
-
-
-
-
-
-
-
-
-
-
-
Table 2
Ratio of GO Debt Service and Sales Tax Capital Outlay to Total City Expenditures
Ratio of Debt
Ratio of Debt Sa les Tax Service 1. Sales
Budget GO Debt Total City Serv tee to Capita I Tax to Tota I
Year Principal Interest Service Expenditures Expenditures Budget Expendi tures
---
1980 $ 732.481 $390,480 $I ,122,961 $14.472,179 7.75~ 7.75%
1981 750,950 387,266 1,138,216 14.120.963 8.06% 8.06%
1982 892.553 445.219 1,337,772 15.407.316 8.68% 8.68%
1983 839.304 383.032 1,222,336 19.103.711 6.39% $1.710.924 15.35%
1984 854.896 343, 158 1,198.054 20,763.729 5.76% 2.126.917 16.01%
.....
.....
1985 736,844 372 ,887 1,109,73 I 20,849.836 5.32% 2,775.384 18.63%
1986 842.580 332.785 I, 175,365 23.678.130 4.961 2.917.172 17 .28%
-
1987 770.134 302.403 1,072,537 24,269,830 4.42% 2.620,000 15.21%
,
-
" '
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
Table 3
Projected Sales Tax Revenues and Expenditures
Total
1986 1987 1988 1989 1990 1991 1992 1988-1992
--
Actual Expenditures $3,592,172
Budgeted Expenditures $3,320,000
Planned Expenditures
Street Maintenance S 125,000 $ 525,000 $ 410,000 $ 420,000 $ 430,000 $ 440,000 $2,225,000
Equipment Reserve fund 150,000 150,000 150,000 150,000 150,000 750,000
General fund Transfer 675,000 700,000 725,000 750,000 775,000 3,625,000
BC Center Transfer 200,000 210,000 220,000 230,000 240,000 1,100,000
Bond and Interest fund 1 410,000 396,000 432,000 416,000 447,000 2,101,000
..... 2 125,000
N Expected Savings
Total Expenditures 3,592,172 3,320,000 1,960,000 1,866,000 1,947,000 1,976,000 2,052,000 9,801,000
Estimated Receipts3 3,158,587 3,250,000 3,300,000 3,350,000 3,400,000 3,450,000 3,500,000 17,000,000
Cash Balance (Jan. 1) 1,028,624 595,039
Cash Balance (Dec. 31) 595,039 525,039
Avatlable funds 1,340,000 1,484,000 1,453,000 1,474,000 1,448,000 7,199,000
1
2 Contribution to Downtown Redevelopment Project.
34th Street Slough Project.
Growth of sa les tax rece ipts projected a t I. 52: annua lJy.
.
-
-'
"
-
-
,
-
-
-
-
-
_1",
-
-
-
-
-
-
-
-
Table 4
Genera 1 Bond and Interest fund Projections
Expenditures and Revenues
1986 1987 1988 1989 1990 1991 1992
Assessed Valuationl $ 108,678 $ 111,856 $ 114,650 $ 117,520 $ 106,410 $ 108,860 $ 111,360
Existin9 Debt-GO 1,175,365 1,072,537 874,561 178.194 650,569 519,552 426,898
Existing Debt-Other 790,635 1,159,259 784,766 743,331 679,800 612,438 550,433
Anticipated Debt-GO?' 0 0 469,500 470,050 520,600 519,650 564,700
lata I Expendi tures 1,966,000 2,231,796 2,128,827 1,991,575 1,850,969 1,651,640 1,542,031
less: Other Revenues3 1,124,831 1,447,110 1,529,766 1,474,331 1,446,800 1,363,938 1,332,433
.... Taxes Required 841,169 784,686 599,061 517 ,244 404,169 287,702 209,598
w
MiJJ levy Required 7.74 7.01 5.23 4.40 3.80 2.64 1.87
1988 to 1992 CIP - G04 ~ 0 207,000 459,000 484.000
MOl levy Increase 0 0 1.95 4.26 4.47
T ota I Ni JJ Levy 5.23 4.40 5.75 6.90 6.34
1 Prior year for budget purposes (in thousands) with 2.5S projected annual growth until 1990 and 2.3% thereafter. The 1990 decrease
2 reflects loss of business inventory valuation. These figures do not reflect property reappraisal.
Includes debt service on $3 mOHon for Downtm/ß Redevelopment, $250,000 for Fire Equipment and $100,000 annuaJ1y for City portion of
Petitioned Improvements.
: Includes special assessments, vehicle taxes, interest, departmental transfers and general fund transfet' for Downtown Redevelopment.
Debt service for $1,215,000 of GO Bonds issued in 1989, $1,480,000 in 1990 and $150,000 in 1991 at 7% interest for 10 years.
l ,
-
\
-
-
IÍII
-
-
-
-
-
-
-
-
-
-
-
Table 5
Capital funding Recommended: 1988-1992 tiP
Ca tegor.)' 1988 1989 1990 1991 1992 Iota I
Streets $ 845.000 $ 565,000 $1.745,000 $1,935,000 $ 385,000 $ 5,475',000
Bridges 145,000 75,000 85,000 100,000 0 405.000
Drainage 0 715,000 0 0 0 715,000
Public Buildings 0 30,000 155,000 0 64,000 249.000
Parks 245,000 1,110,000 1,120,000 315,000 140,000 2,930,000
Water 2,400,000 5,600,000 0 0 0 8,000,000
I-' Sewer 0 0 6,500,000 0 0 6,500,000
....
Hisce 11aneous 93.000 0 275,000 150,000 115,000 633,000
Total Expenditures 3.728,000 8,095,000 9,780,000 2,500,000 704,000 $24,807,000
less Non-local Taxes 2,640,000 5,725,000 6,762,500 1,270,000 50,000 16,447,500
Sub-Total Taxes 1,088,000 2,370,000 3,017 ,500 1,230,000 654,000 8,359,500
less Available Sales Taxes I 1,484,000 1,453,000 1,474,000 1,448,000 7,199,000
1,340,000
Revenue Surplus (Shortfall) $ 252,000 $ (886,000) $(1,564,500) $ 244,000 $ 794,000 $(1,160,500)
less GO Bonds $ 0 $ 1,215,000 $ 1,480,000 $ 150,000 $ 0 $ 2,845,000
Sales Tax Bälance $ 252,000 $ 329,000 $ (84,500) $ 394,000 $ 794,000 $ 1,684,500
1
Excludes projected 1987 year-end cash balance reserves of $525,039.
I
-
-
-
-
. .
-
L ,
-
-
..'
-
-
-
-
-
-
-
-
-
-
-
-
-"-
-
Table 6
1988 Capital Improvement Budget
Project No./Description GO Bonds Sales Tax Revenue Bonds Other Total
S1-1 Ohio & Iron Intersection $ $ 435,000 $ $125,0001 $ 560,000
S1-9 Magnolia/Schilling/I-135 Design Study 20,000 20,000
S1 -10 Rubberized Railroad Crossing 100,000 100,000
ST -II Sidewalk Reconstruction 100,0003 100,000
ST-12 Curb and Gutter Reconstruction 65,000 65,000
B-1 Oakdale St. Bridge Renovation 30,000 115,0002 145,000
..... PR-3 Golf Course Maint. Building 80,000 80,000
U1
PR-4 Memorial HaJJ Use Study 5,000 5,000
PR-6 Community Recreation Center 150,000 150,000
PR-12 N. Salina Neighborhood Park Study 10,000 IO ,000
W-2 Water Plant Renovation 2,400,000 2,400,000
H-8 8i -Center Staging Equipalent 43,000 43,000
M-9 Pave Parking lot ~ 9th & Iron 50,000 50,000
Total $ 0 $1.088,000 n-,400,OOO $240,000 $ 3,728,000
I Federal Highway Safety Funds.
2
3 Federa I Bridge Rep lacement Funds.
It is necessary to budget $100,000 in City funds for first year with $50,000 property owner match included each year thereafter.
I
I
I
I
1
I
I
I
I
1
I
,I
1.1
1
CAPITAL
IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Ohio Street and Iron Avenue
Intersection Improvements
Project Category Streets
Department Engi neeri ng
Project Number ST-l
Project Priority I
Purpose and Justification
Widen all four lanes of Ohio Street and
Iron Avenue Intersection and install a
fully activated signal system. Also
widen Ohio Street (531 B-B) from Greeley
Avenue to Elm Street.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY
1988
¡
DESIGN
JI RIGHT OF WAY 20
20
,I SITE
,I CONSTRUCTION 475
475
EQUIPMENT 65
65
11 OTHER
.1 TOTAL Federal $12 5 ,000
560 560 Sales Tax$435,OOO
16
1
I
I
1
I
I
I
I
I
I
'I
I
..1
I
"I
1
~I
~I
~I
CAPITAL
IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Oescription and Location
Schilling/Magnolia/I-135
Interchange Design Concept
Study
Project Category Streets
Deportment Planning
Project NumOer ST-9
Project Priority II
Purpose and Justification
Completion of Design Concept Plans in order
to define traffic volume, operational char-
acteristics, rights-of-way requirements and
construction cost estimate. This project,
if constructed, would serve the Central
Mall, the eastern portion of Salina via
Ohio Street and Schilling Industrial Area,
particularly Kansas Technical Institute and
Highway Patrol Headquarters. The study
would examine alternate interchange designs
for Schilling and Magnolia and recommend a
preferred concept for subs'equent detailed
design.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1988 IQAQ 1990 IQQI 1992 TQTAl FUNOING c::nURCES
DESIGN
20 20
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
OTHER
TOTAL 20 $20 , 000/
20 Sa,1 es Tax
17
I
I
I
I
I
I
I
I
I
I
I
I
;1
;1
I
I
1
I
,I
CAPITAL
IMPROV,EMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Comoonion Proiect ( 5 ) :
Project Priority
Streets
Planning
ST -10
II
Rubberized Railroad Crossings
Project Category
Oeportment
Project Number
Locations to be determined annually
Purpose and Justification
This project provides rubberized railroad
grade crossings where major streets cross
priority rail locations in the City. Re-
placement of wooden ties with rubber cross-
ings improves safety, reduces maintenance
and decreases vehicle wear and tear. Recom-
mended funding is $100,000 each year for
four-five crossings annually.
-
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 1988 1989 1990 19~n 1992 TOTAL FUNOING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
100 100 100 100 100 500
OTHER
TOTAL Sales Tax $500,000
100 100 100 100 100 500
18
I
I
I
1
I
I
I
I
"I
1
I
-I
I
.1
-I
I
I
,I
.1
CAPITAL
IMPROV,EMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Location
Como anion Proiect< s):
Project Priority
Streets
Engi neeri ng
ST-11
II
Sidewalk Reconstruction Program
Project Category
Department
Project Number
-
Purpose and Justification
Numerous locations exist within the City
where the sidewalks are cracked and de-
teri.orated. This presents both a safety
hazard and a detriment to neighborhood
appearance and stability. A Sidewalk
Reconstruction Program is proposed with
the City providing 50% matching funds for
petitioned segments on a first-come, first-
serve basis. $100,000 must be budgeted the
first year to initiate the program. About
1.2 miles of sidewalks could be rebuilt each
year. '
Locations to be determined annually
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 1988 1989 1990 1991 1992 TnTAL FUNOINr. snIIRC¡;:S
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 100 100 100 100 100 500
EQUIPMENT
OTHER ales Tax $300,000
100 100 100 100 100 500 rivate $200,000
TOTAL
19
I
I
I
I
I
I
I
I
I
I
-I
I
I
I
CAPITAL
IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Location
Curb and Gutter Reconstructi on Program Project Category
Department
Comoonion Proiectl s):
Project Priority
Streets
Engi neeri ng
ST-12
II
Project Number
Locations to be determined annually
Purpose and Justification
Along many older streets within the City
curbs and gutters have broken apart and no
longer serve their intended purpose. The
City should take the initiative to maintain
the public infrastructure and thus enhance
community development objectives. A Curb
and 'Gutter Reconstruction Program funded at
$65,000/year will rebuild about 0.8 miles
of curb and gutter. Being public streets,
financing is 100% City, but property owner.
suggestions will be encouraged.
-
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY
DESIGN
1988
1989
1990
1991
1992
T A
FUNDING SO RCES
-I RlJ3HT OF WAY
SITE
HI
CONSTRUCTION 65 65 65 65 65 325
,I EQUIPMENT
~I OTHER
TOTAL Sales Tax $325,00C
~I 65 65 65 65 65 325
20
I
I
I
I
I
I
I
I
I
I
-I
i,l
,I
I
CAPITAL
IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Oakdale Street Bridge at
Old River Channel
PrOject Cotegory Bridges
Deportment Engi neeri ng
Project Number B-1
Project Priority II
Purpose and Justification
Remove and replace the concrete deck on
this bridge. Serious structural deteriora-
tion has occurred.
Operating Cost Implications
Existing maintenance costs reduced and
future costs minor as bridge will be re-
bu i1 t.
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY
988
DESIGN
I RIGHT OF WAY
I SITE
CONSTRUCTION 115 115
-I EQUIPMENT
~I OTHER
30 30 Demolition
~I TOTAl. Federa 1 $115,000
145 145 Sales Tax 30,000
21
-
I
I
I
I
I
I
I
,I
.,1
I
I
.1
,I
,.1
~I
,I
"I
,:1
~I
-. ---q."---"----- -
CAPITAL
IMPROV,EMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Golf Course Maintenance Building
Project Category Parks and Recreation
Department Community Services
Project Number PR-3
Project Priority III
Purpose and Justification
This project will complete construction of
the Golf Course maintenance building which
began in 1987. The existing maintenance
building must be converted to storage both
for private carts and our cart fleet plus
storage of necessary irrigation equipment.
The new maintenance building will provide fo
expanded equipment storage, storage of
supplies and a mechanical workshop. The old
metal fabricated building will eventually be
razed. The new building would be located
near the middle of the golf course; thus,
reducing operating costs.
Operating Cost Implications
rd
Operating costs funded from Golf Course
revenues.
PROJECT COST DET AI L (ThousandS of Dol I ars)
CATEGORY 1988 19A9 '99(1 199' '99? rnTAI FUNOING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 80 80
EQUIPMENT
OTHER
TOTAL 80 80 Sales Tax $80,000
22
-.- -------""------'- -- q- --..-
- -.,- -"-
I
I
1
I
I
I
I
1
--I
I
'I
I
I
:1
,I
CAPITAL
IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and l.ocation
Memorial Hall Condition and Future
Utilization Study
Project Cotegory Pa rks and Recreation
Deportment Community Services
Project Number PR-4
Project Priority II
Purpose ond Justification
Memorial Hall has begun to show serious signs
of physical stress and obsolescence. For
example, hot water heating supply lines are
leaking, thus causing damage to the building.
This project would provide for an architec-
tural/engineering evaluation of its physical
condition as well as provide some professional
guidance regarding the feasibility of rehab-
ilitation and alternative future use.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS af Dollors)
CATEGORY
DESIGN
1988
RIGHT OF WAY
I SITE
CONSTRUCTION
I
EQUIPMENT
I OTHER Study
L 5 5
I TOTAL
5 5 Sales Tax $5,000
L' 23
I
I
1
I
I
I
I
I
'.1
I
.1
.1
I
I
CAPITAL
IMPROV,EMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-/992 CAPITAL IMPROVEMENT PROGRAM
Description and L.ocatian
Community Recreation Center
Project Category
Deportment
Parks and
Community
PR-6
II
Recreati on
Servi ces
Project Number
Companion Project{ s):
PrOject Priority
Location to be determined.
Purpose and Justification
The construction of an indoor public recrea-
tion center will complement outdoor facilities
and programs currently being provided. At-
tendance and participation records show that
100,000 people would be served annually. In
1987, the Recreation Commission will conduct
a study of needed facilities, estimated cost
and alternative locations. In 1988, design
plans and specifications would be prepared
for the selected site. This would be followec
- by constructi on i n 1989 and 1990.
Operating Cost Implications
PROJECT COST DETAIL(Thousands of Dollars)
CATEGORY
1988
1989
1990
FUNDING SO RC
., DESIGN
150 150
,I RIGHT OF WAY
1 SITE
CONSTRUCTION 1,000 1,000 2,000
.1
EQUIPMENT
..1 OTHER
.1 TOTAL GO Bonds$1,000,000
150 1,000 1,000 2,150 Sales Tax$1,150,00D
24
I
1
I
I
I
I
I
I
,.1
I
I
I
:1
~
~I
CAPITAL
IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
North Salina Park Improvements
ComDanion Proiect(s):
Project Priority
Parks and Recreation
Community Services
PR-12
I I
Project Category
Department
Project Number
Location to be determined.
Purpose and Justification
This project involves the acquisition and
development of a neighborhood park to serve
North Salina. A study is needed to determine
an appropriate location and design. Creation
of a park will necessitate acquisition of de-
veloped property. Following completion of
site acquisition, development is scheduled.
This project is intended to provide area
residents with much needed recreation
facilities, including replacement of the
- Carver Pool.
Operating Cost Implications
PROJECT COST DETAIL(Thousands of Dollars)
CATEGORY
1988
1991
1992
T TA
DESIGN Study
10
10
-I RIGHT OF WAY
I SITE 100 100
CONSTRUCTION 100 100
01
EQUIPMENT
",I OTHER
-- TOTAL
~I 10 100 100 210 Sales Tax $210,000
25
I
I
I
I
I
I
I
I
-I
1
I
..1
1
1
CAPITAL
IMPROV,EMENT
PROGRAM
1988 CAPITAL BUDGET AND /988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Water Treatment Plant Renovation
and Expansion - Fourth and South St.
Project Category
Oepartment
Water
Water and Sewerage
W-2
I
Project Number
Project Priority
Purpose and Justification
This project involves renovation and expansion
of the Water Treatment Plant which has ap-
proached capacity on peak days, These improve
ents will increase plant capacity to 20 MGD.
The total cost of planned improvements is $10.
illion. It is contemplated that $4.0 million
of bonds will be issued in 1987 with $6.2
illion issued in 1988. Current plans are to
upgrade the filter system in 1987. In 1988, a
new river intake, which needs to be coordinate
- ith Old Smoky Hill River enhancements, and th
presedimentation basin will be completed.
Treatment, pumping and lab facilities are sche
duled for 1989.
Operating Cost Implications
PROJECT COST DETAIL(ThousondS of Dollars)
CATEGORY
DESIGN
"I RIGHT OF WAY
, SITE
..-1
CONSTRUCTION
I 2.400 5.600 8.000
EQUIPMENT
.,1 OTHER
TOTAL Revenue Bonds
41 2,400 5,600 8,000 $8,000,000
26
--- .- ----"'-.--.-""'-" - u_---., - _... . -- ---. .. ..- - -------..-.-- --- .-.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Staging Equipment - Bicentennial
Center
Project Category
Deportment
Miscellaneous
Bicentennial Center
M-8
III
Project Number
Project Priority
$1,080 annual maintenance cost
$100,000 annual revenue
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1988 Iq~q ,qq" ,qQ, 199' T"TAL FUNOING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 43 43
OTHER
TOTAL
43 43 Sales Tax$43,000
27
I
I
I
I
I
I
I
I
I
I
'I'
I
I.
I,
I
CAPITAL IMPROVEMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Pave City Parking Lot at 9th and
Iron Streets
Project Category
Deportment
Miscellaneous
Planning
M-9
II
Project Number
Project Priority
Purpose and Justification
This City parking lot is presently gravel and
presents an unsightly appearance (weeds, pot-
holes, dust, etc.) when entering Downtown.
This project would provide new asphalt paving
and space marking. The major uses would be
patrons of the Smoky Hill Museum and nearby
businesses and institutions.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY
DESIGN
RIGHT OF WAY
^'
I, SITE
CONSTRUCTION 50
I 50
EQUIPMENT
I OTHER
I, TOTAL 50 50
Sales Tax $50,000
28
...
-
N
lO
-
-
-
-
Project No./Descf1~tlon
ST-4
Crawford & 9th St. Intersection
ST-I0 Rubberized Railroad Crossings
ST-l1 Sidewalk Reconstructton
ST-12 Curb and Gutter Reconstructton
B-3
0-2
Walnut St. Brtdge RenovaUon
Slough Drainage Extenston
PB-4
PR-5
Museum Steps and Wa1J Joints
Kenwood Park Pool
PR-6
PR-8
Conmuntty Recreation Center (I)
Centennial Park
W-2
Water Plant Renovation
Total
-
-
-
-
---
-
-
-
Table 7
1989 Capita I Improvement Program
GO Bonds
Sa les Tax
Revenue Bonds
Other
$
$ 300.000
100,000
$
$
50,000
65.000
50,0004
15,000
60,0001
715,000
15,000
80,000
15,0002
500,0003
500,000
30,000
5,600,000
$5,600,000
$125,000
$I ,215,000
$I, 155,000
~ federal Bridge Replacement funds.
3 Saline County share as per joint agreement.
4 Park Improvement bonds lIay be Issued for $500,000 annual1y, by amendment to Charter Ordinance No. 13 (KSA 13-1024a).
Property owners share as per 50/50 ßlatching program.
-
-
-
-
Total
$ 300,000
100,000
100,000
65,000
75,000
715,000
30,000
80,000
1,000,000
30,000
5,600,000
$8.095,000
I
I'
I
I
I
I
I
I
,I
'I
I
I
I
I
I
I
I
I
II
I ..~
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Location
Streets
Engi neeri ng
ST-4
I
Reconstruct/widen Crawford and
9th Street Intersection
Project Category
Deportment
Project Number
Project Priority
Purpose and Justification
Widen all four legs of the intersection
of Crawford Street and 9th Street and
install fully actuated signal system.
Operating Cost Implications
$1,000 annual maintenance
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY I~~~ 1989 100('1 IQQI lOa? rOTA I FUNOING SOURCE'S
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 220
220
EQUIPMENT 80 80
OTHER
TOTAL
300 300 Sa 1 es Tax$300 .OO(
30
I
1
I
I
I
I
I
1
I
1
I
,I
I
I
I
"I
,I
,.1
"I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Renovate Walnut Street Bridge at Old
River Channel
Project Category
Department
Bridges
Engi neeri ng
B-3
II
Project Number
Project Priority
Purpose and Justification
Remove and replace the concrete deck on thi
bridge. Serious structural deterioration
has occurred.
Operating Cost Implications
Maintenance cost will decrease with renova-
tion.
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 19AA 1989 qq(' ,qc:¡. qq~ TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 60 60
EQUIPMENT
OTHER 15 15 Demo 1 iti on
TOTAL Federal $60,000
75 75 pales Tax$15,000
31
1
I
I
I
I
I
I
I
I
I
I-
I
I
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Extend Slough Drainage at Crawford
and Second Street
!::::!::JL.-..l-..;. ,
¡:::;;:;W~~C]:-ï
==r~ ' - -
=Ç;;L....:~c:J: - -
~=Z:¡LQr;~R.::' -
-:;:::7LJL..l .,
-~ ;;:;æ==c::::=:]'~
Project Category
Drainage
Engineering
D-2
II
Department
Project Number
Project Priority
Purpose and Justification
Underground drainage structure to expand
capacity of slough drainage along Second
Street into old river channel at Prescott
Street. This project is to be coordinated
with Crawford Street reconstruction.
Operating Cast Implications
$1,000 Maintenance Annually
PROJECT COST DETAIL(Thousands of Dollars)
CATEGORY
DESIGN
FUNDING SOURC 5
15
I CONSTRUCTION 700
700
EQUIPMENT
I
OTHER
I TOTAL
715 715 GO Bonds $715 .OOC
I 32
15
RIGHT OF WAY
SITE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CAPITAL
IMPROV,EMENT
PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Reset Front Steps and Restore Exterior
Wall Joints at Smoky Hill Museum
Project Category
Oepartment
Public
Arts &
PB-4
II
Buildings
Humanities Commission
Project Number
Project Priority
Purpose Qnd Justification
he building which houses the Smoky Hill Museum
as built in 1937. There has been an upheaval
f the limestone used to connect the steps to
he front door of the museum causing the stairs
0 pull away from the building. When it rains,
puddle collects at the low spots; in winter
.t turns to slippery ice. The slant of the
teps could cause a fall or injury to the pub-
ic, leaving the museum open to a liability
uit. Wear on the surface of the building has
lso caused the mortar between the limestone
locks to crumble and fall away.
Operating Cost Implications
Negligible following repair work.
PROJECT COST DET AI L (ThousandS of Oottars)
CATEGORY
DESIGN
1989
°
EQUIPMENT
I OTHER
TOTAL ~aline Co.$15,000
1 3 0 3 0 Sales Tax $15,000
33
..
RIGHT OF WAY
SITE
CONSTRUCTION
3 0
I
I
I
I
"
I
I
I
I
I
,.,
I
I
I
I
I
I
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Install New Floor and Recirculating
System at Kenwood Park Swimming Pool
Project Category
Deportment
Parks & Recreation
Community Services
PR-5
III
Project Number
Project Priority
PROJECT COST DETAIL(Thousonds of Dollars)
CATEGORY
DESIGN
1989
FUNDING SO RC S
RIGHT OF WAY
SITE
CONSTRUCTION
80
80
EQUIPMENT
OTHER
I TOTAL
80 80 ales Tax $80,000
I 34
I
I
I
I
I
I
I
I
I
I
I
I
II
I
I
I
I.
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-/992 CAPITAL IMPROVEMENT PROGRAM
Description and Locotion
Centennial Park Improvements
ê. ~1111
~~1tJ]
lill[iŒIT
~.T!T'C:
.I~
-==
"T
H
Project Category
Department
Parks & Recreation
Community Services
PR-8
III
Project Number
Project Priority
Purpose and Justification
Centennial Park, acquired in 1958 as a
neighborhood park, has never been develope
It is one of three neighborhood parks for
which site plan have been prepared. Im-
provements would include construction of
sidewalks, hard-surfaced play areas, land-
scaping, picnic facilities, a children's
playground area, an intermediate swimming
facility and a project to correct the
drainage problem surrounding Friendship
Center. Also, there would be some utility
relocations and the conversion of a lighte
softball park into a neighborhood practice
Operating Cost Implications
PROJECT COST D ET AI L (ThousandS of Dollors)
CATEGORY 1988 1989 ClCln 1991 1992 TnTAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 30 30
EQUIPMENT
OTHER
TOTAL
30 30 Salês Tax$30,000
35
-
...
~
-
-
...
-
-
,-
-
-
--,- '. -, _.-
Table JL
1990 Capital Improvement Program
Project No./Description GO Bonds Sales Tax
ST-5 Crawford St. Reconstruction (I) $980,0005 $ 500,000
ST-lO Rubberized Ri!tlroad Crossings 100,000
ST-l1 Sidewalk Reconstruction 50;000
ST-12 Curb and Gutter Reconstruction 65,000
B-2 Mulberry St. Bridge Renovation 20,000
PB-l1 Machinery Barn Roof 21,000
w
0\ PB-13 Cemetery Mausoleum Renovation 14,000
PB-14 Clean and Seal Museum Walls 10,000
PR-6 Community Recreation Center (II) 500,0002 500,000
PR-7 Neighborhood Park Improvements 120,000
S-2 Reconstruct Wastewater Plant 12
M-4 Police/Sheriff Secured Parking 137.500
Total $1.480.000 $1.537.500
Revenue Honds
$
6.500,000
$6,500,000
1
2 Federal Bridge Replacement Funds.
3 Park Improvement bonds Alay be issued for $500.000 annua l1y by amendment to Charter Ordinance No.
4 Saline County share as per joint agreement.
5 Saline County share pending joint agreement.
Bonds may be issued for reconstruction of major trafficways under KSA 12-685.
Other
$
50.000
65.0001
10.0003
137.5004
$262.500
13 (KSAI3-1024a).
-
Total
$1.480.000
100.000
100.000
65,000
85.000
21.000
14.000
20.000
1.000.000
120,000
6.500,000
275.000
$9.780.000
--
-
1
1
I
I
I
1
I
I
I,.
I
1
I
I
I
1
I"
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and l.ocotion
Reconstruct and Widen Crawford Street
- Phase I
Project Category
Deportment
Streets
Engineering
ST-5
II
Project Number
Project Priority
Purpose and Justification
Widening of Crawford Street from 9th Street
to 1-135 (531 8-8). KDOT has indicated that
funding for Crawford will not likely be feasi-
ble until 1991. Thus, it is proposed that
Phase I be initiated with local funds and
Phase II completed largely with federal
funds.
Operating Cast Implications
Maintenance will decrease following recon-
struction.
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY
DESIGN
1990
1,480
I OTHER
TOTAL GO Bonds $980,000
I" 1,480 1,480 Sales Tax$500,000
37
RIGHT OF WAY
SITE
CONSTRUCTION
1,480
EQUIPMENT
I
I
I
I
I
I
I-
I,
I..
I
I
1-
,I"
I,
I"
11..
1'-
I-
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Renovate Mulberry Street Bridge at
Old River Channel
Project Category
Deportment
Bridges
Engi neeri ng
B-2
II
Project Number
Project Priority
Purpose and Justification
Remove and replace the concrete deck on
this bridge. Serious structural deteriora
tion has occurred.
Operating Cost Implications
Maintenance cost will decrease following
renovation.
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1988 1989 1990 ,qql ,qq~ TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 65 65
EQUIPMENT
OTHER 20
20 Demo 1 iti on
TOTAL Federa 1 $65,000
85 85 S~lpc: T-.v(!'.,nnnn
38
I
I
I
I
I
I
I
I
I
1
I-
I'
I
1
I
: I'
I
1
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Install New Roof on Street
Machinery Barn on East Ash
Project Category
Deportment
Public Buildings
General Services
PB-ll
II
Project Number
Project Priority.
Purpose and Justification
The existing roof on the Street Machinery
Barn has been inspected. One roofer feels
work should be done. The second roofer sa
wait until the roof leaks. The roof has
bubbles and too many layers of roofing for
structural integrity of the roof. It is
also expected when the roofing is removed
that many of the roof boards will need to
be replaced. It is expected that the new
roof will be required in 1990.
Operating Cost Implications
Mi,nor
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY ,<:11::11:\ ,gAg 1qQI1 ¡qq, IQQ? TnTAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 21 21
EQUIPMENT
OTHER
TOTAL
?1 21 1~;:\1øc:- T;lV (?11111(
39
I
I'
I
I
I
I
I
I
I
I
I
1-
I~
I
I
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Location
Renovate Mausoleum at Gypsum Hill
Cemetery
-
Project Category
Deportment
Public Buildings
General Services
PB-13
II
Project Number
Project Priority
Purpose and Justification
The mortar in the Gypsum Hill Mausoleum is
beginning to fallout in the masonry. The
roof should be inspected and leaks correc-
ted by professionals. This is a main-
tenance project aimed at preserving the
1920's building which the City owns.
Operating Cost Implications
~1i nor
-
PROJECT COST DETAIL(ThousandS of Dollars)
FUNDING S URC S
CATEGORY
DESIGN
1990
4
10
I TOTAL
14 14 Sales Tax $14,00(
40
I
.
-
4
RIGHT OF WAY
SITE
CONSTRUCTION
10
EQUIPMENT
OTHER
I
1
1
I
I
I
I
I
I'
I
I
I
I
I
I
I
1
I
1'-
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND /988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Location
Clean and Reseal Exterior Walls
Smoky Hill Museum
Project Category
Deportment
Public Buildings
Arts and Humanities
PB-14
II
Commissi n
Project Number
Project Priority
Purpose and Justification
The Smoky Hill Museum is built of limestone.
Over the years, stains and dirt have spotted
the surface of the building, especially
around the statues on the front. To main-
tain the looks of this structure, a chemical
cleaning of the building is needed. Accord-
ing to the architect who helped with the
rehabilitation of the building, the surface
should then be sealed to keep from staining
again.
Operating Cost Implications
Minor following treatment.
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY ClI=!I=! IQRQ 1990 IClQI IClCI~ TnTAI FUNDING snIIRC¡:S
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 20 20
EQUIPMENT
OTHER
TOTAL Saline Co.$10,000
20 20 Sales Tax$10,000
41
-- -- ._-. - uu-
I
I'
I
1
1
I
I
I
I,
I
I
I
I
I
I
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Improvements at Phillips and South
Neighborhood Parks
Project Category
Deportment
Parks and
Community
PR-7
III
Recreation
Services
Project Number
Project Priority
Purpose and Justification
This project is similar to the Centennial
neighborhood park development project. It
provides for development at Phillips and
South Parks. Improvements to those sites.
which are illustrated in Recreation Com-
mission site plans, include sidewalks and
hard-surfaced multiple use areas, landscap-
ing, playground and picnic facilities and
some swimming and/or wading facilities.
Operating Cast Implications
PROJECT COST DETAIL(Thausands of Dollars)
FUNDING SOURC S
CATEGORY
DESIGN
990
10
10
110
OTHER
I TOTAL
120 120 pales Tax $120,00:
42
I- ._"" ,,-- -'-'- --.---------_.-_-- ----" --- "".'--'------"---",,-
RIGHT OF WAY
SITE
CONSTRUCTION
110
EQUIPMENT
I
1
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I'
I~
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Locotion
Reconstruct Waste Water Treatment
Plant No.2 .at Schilling
-.--- --
Project Category
Deportment
Sewer
Water and
S-2
II
Sewerage
Project Number
Project Priority
Purpose and Justification
The present treatment plant at Schilling i
not capable of treating the waste to stan-
dards set by the Kansas Department of
Health and Environment and the United
States Environmental Protection Agency.
Industrial waste processing fees will
likely require adjustment.
Operoting Cost Implications
Maintenance funded by utility revenues.
/
PROJECT COST DET AI L (Thousonds of DoHars)
CATEGORY aAA IQAQ 1990 ,QQ, lac? TOTAl FUNDING SOURCE:S
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 6,500 6,500
EQUIPMENT
OTHER
TOTAL Revenue Bonds
6.500 6.500 $ñ ~()() ()()()
43
I
I
I
I
I
I
I
I
I,
I
I
I,
I
1
1
I'
I
I'
I'"
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Locotion
Secured Parking Area West of
Police Building
Project Category
Department
Mi s ce 11 aneous
Police Department
M-4
III
Project Number
Project Priority
Purpose and Justification
To provide a secured and protected area for
prisoner transfer, security of police vehi-
cles, vehicles of persons in custody, etc.
Project consists of purchasing property on
east half of city block located directly
west of the Police and Sheriff buildings,
raze building and prepare site for re-
surfacing, fencing and lighting. Also in-
cludes closing 11th Street between Elm and
Park Streets.
Operating Cost Implications
Minor
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY I qFlFl 1989 1990- ,qq, ,qq:;l TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE 175
175
CONSTRUCTION 100 100
EQUIPMENT
OTHER
TOTAL Sales Tax$137,50C
275 275 Saline Co.$137,5C
0
44
-
-
-
-
-
-
-
-
-
-
-
Table 9
-
-
1991 CapItal Improvement Program
Project No./Descrlptlon GO Bonds Sales Tax
ST-6 Crawford St. ReconstructIon (II) $ $380,000
ST-8 MagnolIa and 9th St. IntersectIon 150,000
ST-IO Rubberized Railroad Crossings 100.000
ST-Il Sidewalk Reconstruction 50,000
ST-12 Curb and Gutter ReconstructIon 65.000
B-4 State Street Bridge Renovation 20,000
....
U1 PR-IO Forrestry Aerial Bucket 65,000
PH-II East Crawford Softball Diamonds 150,000
PR-12 N. SalIna Neighborhood Park 100,000
M-19 FIre Pumper Truck 150,000]
Total $150,000 $1,080,000
I Federal Urban System Funds - KDOT.
2
3 Federal Bridge Replacement funds.
Bonds authorized for purchase of fire fIghtIng equi~nent under KSA 12-IIOc.
Revenue Bonds
$
f
-
-
Other
$1,140,0001
50,000
80,0002
$1,270,000
-
-
Total
$1.520.000
150,000
100,000
100,000
65,000
100,000
65,000
150,000
100,000
150,000
$2,500,000
-
-
I
I
I
I
I
I
I-
I
I,.
II.,
I
I,
I
I,
I-
I.
I,
I
I"
CITY OF' SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and l.ocotion
Reconstruct and Widen Crawford
Street - Phase II
Project Category
Deportment
Streets
Engineering
ST-6
II
Project Number
Project Priority
Purpose and Justification
Widening of Crawford Street from 9th Street
to Ohio (531 B-B). This project is a con-
tinuation of the Phase I portion of the
Crawford reconstruction plan. It appears
that this segment will be eligible for future
KDOT fundi ng.
Operating Cost Imølications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY lOgO loon 1001 IOO~ rnTAI FUNnING snURC:'C::
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 1,520 1,520
EQUIPMENT
OTHER
TOTAL Federal $1,140,000
1,520 1,520 Sales Tax 380,000
46
I
I
I
I'
I'
I
I
I
I
I
I
I-
I.
I"
I,
I
I
I-
I-
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND /988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Reconstruct 9th Street and Magnolia
Road Intersection
Project Category
Deportment
Streets
General
ST-8
II
Services
Project Number
Project Priority.
Purpose and Justification
~oad and base continually moves such that
it requires constant road repair and the
road movement causes the traffic activated
loop which controls the traffic light to
break. This is a high maintenance corner
for both the traffic and street departments.
Operating Cost Implications
Maintenance will decrease following re-
constructi on.
ij
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY ,QAA 1989 ICI~ 19.91 rClCl::) TOTAL FUNDING SOURCES
DESIGN
15 15
RIGHT OF WAY
SITE
CONSTRUCTION 135 135
EQUIPMENT
OTHER
TOTAL
150 150 Sales Tax$150.00C
47
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Locotion
Replace State Street Bridge
at Old Dry Creek
Project Category
Deportment
Bridges
Engineering
B-4
II
Project Number
Project Priority
Purpose and Justification
Remove the existing span bridge at this
location and construct a reinforced
concrete box structure as a replacement.
Concrete deterioration is apparent on
piers and deck.
Operating Cost Implications
Replacement will avoid expensive mainten-
ance.
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY Iq¡:u:¡ ,QFlq 1990 199.1 ,gq? TOTA' FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 75 75
EQUIPMENT
OTHER 25 25 Demolition
TOTAL Federa 1 $80,000
100 100 ales Tax$20.000
48
I
I
I
I
I
I
I
I
I
I
I
I-
I-
I.
I,
I-
I
I-
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Locotion
Purchase Aerial Bucket for
Forestry Division
Project Category
Department
Parks and
Community
PR-10
III
Recreation
Services
Project Number
Comoanion FlroiecHs):
Project Priority
No Permanent Location
Purpose and Justification
To provide funding to purchase a sky-
worker or aerial bucket vehicle to be
used in the Forestry Program for main-
tenance of trees in the parks and on
other public grounds.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY q:\:\ q:\q Iqql1 1991 IQQ? TOTAL FUNDING snURCl='1:;
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 65 65
OTHER
TOTAL Sales Tax $65,OOC
65 65
49
I
I
I
I
I
I
I
I
I,
I
I
I
I
I
I
I-
I
I
1-
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Install Softball Diamonds at East
Crawford Recreation Area
Project Category
Deportment
Parks and
Community
PR-ll
III
Recreation
Services
Project Number
Project Priority
Purpose and Justification
This project will complete the construction
of softball diamonds at the East Crawford
Recreation Area.
I"q
.
Pi
,-
- :
.
..
,
, -
- ,
.
.
.
,..~
.
.
.
.
.
.
.
I
I
.
.
.
I
L
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY !9AA 1989 ¡qQn 1991 1992 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
150 150
EQUIPMENT
OTHER
TOTAL
150 150 ~ales Tax$150,OOO
50
I
I'
I'
I
I
I.
I
I
1<:
Ii
I,
I,.
I
I,
I,.
I,
I'
I'
I-
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Locotion
Purchase of 1500 GPM Fire Pumper
Truck
Project Category
Deportment
Miscellaneous
Fire Department
M-19
II
Project Number
Project Priority
Purpose and Justification
Purchase a 1500 GPM pumping engine for
Station #1. Will replace a 1963 Ford
1000 GPM pumper which will be sold or
scrapped.
Operating Cost Implications
Maintenance cost will decrease with new
truck.
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY I~RR IQRQ IQQI1 1991 IQQ? TnTAI FUNDING SOURC¡:S
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
150 150
OTHER
TOTAL
150 150 GO Bonds$150.QOO
51
-
-
-
-
-
-
Project No./Oescrjption
SI-2 Cemetery Road Paving
SI-IO Rubberized Railroad Crossings
SI-ll Sidewalk Reconstruction
SI-12 Curb and Gutter Reconstruction
PB-2 Fire Statton 11 Apron Drive
PB-16 Bi-Center Operable Wall
111
N
PR-9 Crawford Recreation Area landscaping
PR-12 N. Salina Neighborhood Park
M-16 Police Public Parking lot
Total
-
-
GO Bonds
$
-
-
-
Table 10
-
-
1992 Capital ImprovE~~ßIent Program
Sales lax
$120,000
100.000
50.000
65,000
30.000
34,000
40.000
100.000
115.000
$654,000
Revenue Bonds
$
f
-
-
Other
$
50.000
rnr;lIUlI
-
-
Iota I
$120.000
100.000
100,000
65.000
30,000
34,000
40,000
100.000
115.000
$704,000
-
-
I
I'
I
I
I'
I
I
I
I,
I
I
I'
I,
I
I
I'
I'
I'
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Reseal and Pave Gypsum Hill
Cemetery Roads
-
Project Category Streets
Deportment General Services
Project Number ST-2
Project Priority III
Purpose and Justification
Renovate existing cement stabilized roads
in the cemetery and seal with asphalt.
Existing seal has deteriorated to the
extent that the sub base will probably
need restabilization. At present, the
roads are unsightly and rough to travel
on. Pave the main roads. Some repairs
will be completed in 1987.
Operating Cost Implicotions
PROJECT COST DETAIL(Thousands of Dollars)
CATEGORY
DESIGN
1992
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
OTHER
TOTAL
120
120
120 120 Sales Tax$120,00C
53 I
I- -
I
-
I
I
I
I
I
I
I
I
I.
~'-'.
I
I
I
I
I
I
I-
I
I
I
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Locotion
Replace Concrete Apron Drive at
Fi re Stati on #1.
Project Cotegory
Public Buildings
Fi re Department
PB-2
II
Deportment
Project Number
Project Priority
Purpose ond Justification
Remove deteriorated concrete apron at Fire
Station #1 and replace with new concrete
(9,000 sq. ft. of drive to be involved).
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY ICI¡:¡¡:¡ 1989 IQQ~ 1991 1992 TOTAL FUNDING SOURCE:S
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 30 30
EQUIPMENT
OTHER
TOTAL
30 30 Sales- Tax$30,000
54
I
I
I
I
I
I
I
I
I"
I
I
I
I
I
I
I
I
I
1-
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND /988-1992 CAPITAL IMPROVEMENT PROGRAM
Description ond Location
Install Operable Wall in Heritage
Hall at Bicentennial Center
Project Category
Public Buildings
Bicentennial Center
PB-16
III
Department
Project Number
Project Priority
Purpose and Justification
At present we have enough operable wall to
divide Heritage Hall in half or to close
off one quarter. We frequently have need
for two quarters. It is not uncommon for
an event to use one quarter for a conferenc
and/or exhibits and another quarter for
lunch. One quarter has to be screened by
use of a 81 high divider curtain. So ac-
tually three-fourths of the Hall is used to
satisfy'a need for one-fourth. This re-
sults in the entire 18,000 sq. ft. being
headed or cooled. Both HVAC systems have t
be operated, as opposed to one.
Operating Cost Implications
Minimal
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1 qF!F! 1989 IQ~ 1991 1992 TnTAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 34 34
OTHER
TOTAL Sales Tax$34,000
34 34
55
I
I
I
I'
I
I
I
I
I
I
I
I
I
I-
I
I
I
I
I~
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Streets cape/Landscape Improvements
at East Crawford Recreation Area
,.
~~:\:.'-...
I '. \
=- , \\
. = \~
)1
. ,ï
I
I
I
I
I'
I
I
I
.
I
I
- I
, I
I
I
h'~
I
I
I
I
I
I
I
I
I
I
I
I
I
,
Project Category
Department
Parks and
Community
PR-9
III
Recreation
Serv; ces
\
i
I
)
Project Number
Project Priority
Purpose and Justification
A streets cape or landscaping, sidewalks,
etc., is to be constructed along the
length of Crawford Street on City property
adjacent to the Golf Course driving range
and the East Crawford Recreation Area.
This allocation would fund the completion
of that portion of the Recreation Area pro
ject.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1988 1989 ¡CICIO ,qq, 1992 TnTAI FUNDING SOURCES
DESIGN
2.5 2.5
RIGHT OF WAY
SITE
CONSTRUCTION 37.5 37.5
EQUIPMENT
OTHER
TOTAL
40 40 Sales Tax$40,000
56
I
I
I
I
I
I
I
I
I.
I
I
I
I
I,
I
I
I'
I
I-
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1988 CAPITAL BUDGET AND 1988-1992 CAPITAL IMPROVEMENT PROGRAM
Description and Location
Develop Public Parking Lot North
of Police Department
Project Category
Deportment
Miscellaneous
Police Department
M-16
III
Project Number
Project Priority
Purpose and Justification
Purchase and clearing site of 4 residen-
tial lots in the Bishop Addition for an
off-street, 70 stall, public parking lot.
- .-:;;
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY ¡qFU:¡ IQ~q ¡qQ(1 IQQI 1992 TOTAL FUNDING ~OURCF~
DESIGN
RIGHT OF WAY
SITE 65 65
CONSTRUCTION 40 40
EQUIPMENT
OTHER 10 10 Demolition
TOTAL ~ales Tax$115,000
115 115
57
I
I
, I'
I
1
I,
1
1
I:
1
I
I
I-
I
I.
I
I
I,
I-
Priority IV Projects (Unfunded)
Project No./Oescription
ST-3
0-3
0-4
0-5
PB-1
PB-3
PB-5
PB-6
PB-7
PB-9
W-3
M-1 .
M-5
M-6
r~-l1
M-12
M-14
M-15
M-20
Amount
CBD Solid State Traffic Signals
South Salina Drainage System (I)
South Salina Drainage System (II)
South Salina Drainage System (III)
$ 124,000
3,000,000
3,000,000
1,800,000
Fire Station #1 Bay Doors/EMS Office
Fire Station #2 Bay Doors
12,500
48,000
Museum Dock Alteration
2,500
15,000
Museum Interior Painting
Bi -Center Lobby and Box Office'
Fire Station #3 Office Completion
117,000
200,000
Gypsum Hill Cemetery Water Line
Police Video Securi~y Monitor
40,000
14,000
Museum Platform Lift
2,700
Museum Transport Van
12,000
Fire Station #2 Generator
16,000
13,000
Fire Station #4 Generator
Bi-Center Storage Equipment
Bi-Center Forklift
29,000
20,000
Bi-Center Parking Lot
327,000
$8,792,700
Total
58
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIP PRIORITY RATING CRITERIA
Project No./Name
Tota 1 Score
1. Need for Facility 6. Supports Related Facility
Critical 10 Major 10
Important 6 Minor 5
Desirable 2 None 0
2. People Benefitting 7. Economic Impact
Total City 10 Major 10
Several Neigh. 6 Minor 5
One Neigh. 2 None 0
3. Useful Life (years) 8. Funding Source
21 + 10 Grant 100% 10
11-20 6 Grant 50% 6
6-10 2 Rev./S.A. 2
1-5 0 Local Taxes 0
4. Improves Public Service 9. Revenue Impact
Major 10 Major 10
Minor 5 Minor 5
None 0 None 0
5. Requires Land/Personnel 10. Public Support
Major 0 High 10
Mi nor 5 Moderate 5
None 10 Low 0
Note:
Circle appropriate score for each item and total.
points.
Maximum Score-100
59