CIP 1990 - 1994
ADOPTED
1990-94
CAPITAL IMPROVEMENT PROGRAM
CITY OF SALINA, KANSAS
DENNIS M. KISSINGER
CITY MANAGER
DECEMBER, 1989
City of Salina 8oard of Commissioners
Joe Warner
Bob Frank
Ca ro 1 Begg s
John Divine
Steve Ryan
Mayor
Vice-Mayor
Commissioner
Commissioner
Commissioner
Salina City Planning Commission
Peter Brungardt
Kristin Seaton
Dale Anderson
Sherry Denton
Fred Gaines
Eric Hardman
Bob Haworth
Ray Kline
Don Morris
Chairman
Vice-Chairman
CIP Administrative Committee
Roy Dudark
Bill Harris
Bob Biles
Don Hoff
Frank Weinhold
Director of Planning
Assistant City Manager
Director of Finance
Acting City Engineer
Director of General Services
Prepared By:
Department of Planning & Community Development
Table of Contents
Page
Table of Contents
1
2
Resolution of Adoption
Abbreviations and Legend
Part I - Introduction
3
4
Pdrt II - Policy Guidelines
Part III - Capital Improvement Program
6
8
1990 Capital Budget
1991 Capital Program
10
24
1992 Capital Program
1993 Capital Program
37
45
1994 Capital Program
1990-1994 Capital Financing Plan
55
64
Potential Projects
65
66
Priority IV (Unfunded) Projects
Project Rating Criteria
67
RESOLUTION NUMBER 89-11132
A RESOLUTION APPROVING THE 1990 - 19911 CAPITAL IMPROVEMENT
PROGRAM FOR THE CITY OF SALINA, KANSAS.
WHEREAS, the expansion and improvement of public facilities is a
valuable means available to local government for stimulating prlivate economic
activity and directing long-term physical growth and development. .and
WHEREAS, the investment of available public resources must be
properly directed to both existing development areas and newly urbanizing areas
in order to achieve balanced community growth, and
WHEREAS, a Capital Improvement Program provides an effective and
systematic plan for selecting valuable public projects and scheduling required
expenditures in accordance with available revenues, SO NOW, THEREFORE
Kansas:
BE IT RESOLVED by the Governing Body of the City of Salina,
Section 1.
That the 1990 - 19911 Capital
Improvement Program is
hereby adopted as a policy document to guide decision-making reqarding public
facility improvements and capital expenditures.
Section 2.
That no project shall be initiated nor funds be expended
thereon
unless
said
project
is
contained
in
an
adopted capital
budget or
otherwise authorized by the Board of -Commissioners of the City of Salina.
Adopted by the Board of Commissioners and signed by the Mayor this
23rd day of October, 1989.
Joseph A. Warner, Mayor
[SEAL]
ATTEST:
Jacqueline Shiever, City Clerk
2
ABBREVIATIONS AND SYMBOLS
Methods of Financing
GO
GOSA
General Obligation Bonds
City at Large
General Obligation Bonds - Special Assessment District
GORB
General Obligation Bonds - Revenue Financed
Sales Tax
ST
F
Federal Funds
s
State Funds
GF
General Fund - Annual Operating Budget
0
Other
Map Legend
Street
X Bridge
... ..........-.: Drainage
. Public Buil ding
p Park
U Water/....Sewer Util ity
m Miscellaneous
3
Part I
Introduction
A Capital Improvement Program (CIP) is one of the major tools available to
achieve desired growth and development. The CIP is an important statement
of the City's policy regarding long-range physical development of the com-
munity. Through the types of public projects funded and their location,
~rivate investment is induced resulting in community growth and change.
Combined \tith financial targets, the Capital Program represents a systematic
plan for providing needed improvements within a prioritized framework. While
there are competing demands for new improvements to urbanizing areas, exist-
ing developed areas must be attended to through the replacement of obsolete
facil ities. These competi ng demands combi ned with the scarci t,y of current
revenues and the legal limitations and complexity of long-term debt financ-
ing, signal the necessity to formalize a method of prioritizing capital
projects and allocating future public resources.
The CIP covers a five-year period and sets the general schedule within which
public improvements will be undertaken. The first year is recommended for
adoption as the Capital Budget for the coming year with the remaining years
considered a Capital Improvement Program. However, it should not be con-
sidered as a final and fixed program. The CIP is intended to be reviewed and
revised annually. An additional year is thus added each year to maintain the
full five-year period of the program.
Reasons for Programming Capital Investments
There are several benefits to adopting a Capital Improvement Program:
1.
Provision of valuable information to the City Commission and citizenry
for decision-making regarding community development and budgeting.
Utilization of public funds to maximum advantage through improved timing
of improvements and coordination among departments.
2.
3.
Equitable distribution of public facilities according to need and demand
for services.
4.
Coordination of city projects with those of quasi-publ ic and private
entities.
5.
Distribution of capital costs over time in order to ach"ieve a more
consistent tax rate and maintain a sound debt management policy.
6.
Increased private development and orderly growth through
community knowledge of intended public activities.
improved
4
Despite the many benefits of capital programming, directing public improve-
ments to achieve development objectives is very difficult. Some of the major
reasons are:
1.
Revenue sources are difficult to predict in advance due to changing
economic conditions and shifts in public policy.
Operating budgets frequently take precedence over capita 1 budgets and
reduce the number and scale of public improvements becð.use capital
projects are easier to eliminate.
2.
3.
Certain public facility needs depend largely upon the location, scale
and timing of private economic decisions which are difficult to predict.
Community objectives are difficult to not only set but may be forgotten
at budget time when priorities often are based on subject-ive reasons.
4.
Nevertheless, ways must be found around these difficulties in order to
increase the long-time benefit and return on the investment of limited public
funds. The formulation of clear policy objectives requires effective and
open communications between elected officials, administrators and involved
citizens. Discussions should encompass continuing obligations, emerging
needs, alternative solutions, and project benefits and costs.
There are severa 1 factors whi ch wi 11 have a substanti a 1 impact on both the
scope and impact of a Capital Improvement Program for the City of Salina.
Each of these factors will influence either available resources or the
specific projects selected for funding. The most important factors include:
1.
Amount and type of desired economic activity and resultant physical
development.
Availability and willingness to use state and federal funds.
2.
3.
Statutory debt limits and maximum local mill levy deemed feasible for
debt service.
4.
5.
.
Ability to set priorities among competing public facility neE~ds.
Willingness to establish special assessment districts and/or utilize
impact/benefit fee financing.
In order to address these factors, and in so doing, obtain a reasonable and
workab 1 e Capita 1 Improvement Program, the Board of City Commi ss i oners, has
formulated several policy guidelines which are presented in Part II of this
document. Only through establishing a deliberate and reasoned policy posi-
tion can a Capital Improvement Program be formulated which reflects the
wishes of the general public through the governing body and thus achieve the
results intended.
5
Part II
Policy Guidelines
Goal
Develop and implement a capital investment plan within the financial capacity
of the community sufficient to accommodate both existing and future develop-
ment within the City of Salina.
Development Policies
1.
Conserve and maintain the resources and stability of the entire city.
Strive to make the most efficient use of existing publ icimprovements
and encourage the expansion of public facilities in a manner which
provides the greatest city-wide benefit.
2.
Preserve and upgrade public facilities and services in the central
business district and surrounding older areas. Create a climate of
confidence about the future of such areas to attract the private
investment needed to maintain individual properties. Undertake
rehabi 1 itati on projects on a se 1 ecti ve bas i s to upgrade deteriorated
but promising areas.
3.
Maintain the integrity and character of established neighborhoods.
Continue the present level of public services and direct new spending
to needed public facility enhancements.
4.
Promote the efficient, orderly and economic expansion of public facili-
ties and services at the urban fringe. Avoid scattered arid premature
urbanization of rural areas. Direct public investment to areas directly
contiguous to already developed areas and provide only those public
facilities essential to support new development.
Public Facility Policies
1.
In evaluating capital projects, first priority will be given to the
rehabilitation or replacement of deteriorated/obsolete facilities
required to maintain public health and safety; second priority will be
given to additions to existing facilities or new facilities needed to
bring an area up to a standard level of service; and, third priority
will be given to expanded facilities above minimum standards.
Projects which: a) create or retain jobs or b) contribute to commer-
cial area revitalization will be given special consideration.
2.
~
v.
Projects which require little or no land acquisition, result in a
decrease in operating and maintenance costs, or increase revenue to the
city will be given special consideration.
Projects that increase productivity and efficiency in the delivery of
city services will be given greater consideration.
4.
6
r:;
~ .
Projects that benefit a larqer area, serve a greater population or
will be used on a year-round basis will be given greater consideration.
Projects which complement related facilities or are coordinated with
other improvements, at a cost savi ngs to the city, wi 11 be gi ven
greater consideration.
6.
7.
Projects which support neighborhood b~tterment, enhance the environment
or promote historic preservation will be encouraged.
Financial Policies
1.
Protect the fiscal integrity of the city and maintain a balance between
the city.s operating and capital improvement budgets.
2.
Develop a Capital Improvement Program within the debt limitations
established by State law and which can be funded within the financial
capacity of the City.
3.
Devote the maximum percentage of local sales tax revenue available
each year to capital improvements.
4.
Maximize the impact of local tax dollars by recommending projects
eligible for alternative financing in the following order of pre-
ference: 1) federal and state grants; b) special benefit districts; c)
revenue bonds; d) special purpose bonds; and e) general obligation
bonds.
5.
Fi nance capita 1 improvements based on the useful 1 i fe of the project.
7
Part III
Proposed Capital Improvement Program
Projected Financial Capacity
There are two main sources of local revenue available for capital
improvements - the local sales tax and general obligation bonds. Since
1983, when the one cent county-wi de sales tax was approved by the voters,
many major capita 1 improvements have been completed with thi s source of
revenue. It is projected, however, that during each succeedin9 year, more
of the sales tax revenue will be needed to finance current operations.
During recent years, two major sources of funding have been lost: federal
revenue sharing and the intangibles tax. Escalating health insurance costs,
state and federal program mandates, and general inflation all combine to
require more resources to maintain public service levels. The availability
of the second major revenue source, general obligation bonds, is a function
of growth in assessed valuation, existing and committed debt, and statutory
borrowing limits. Because existing debt is diminishing each year, the
required mill levy for the Debt and Interest Fund could be maintained at a
relatively constant level over this period and still permit additional GO
bonds to be issued. Taken together, however, these two revenue sources will
be insufficient to maintain more than a minimum level capital improvement
program duri ng comi ng years. For major infrastructure improvements to be
conti nued to support development and generate additiona 1 economic growth,
new revenues will be needed by 1992.
Proposed Capitaì Improvement Program
The proposed CIP includes funding for 74 projects at a total cost of $42.3
mi 11 ion. After exc 1 ud i ng $33.6 mi 11 ion in funds represented by non 1 oca 1
taxes (federal and state grants, Saline County funds, utility revenue bonds,
etc.) 8.7 million in local taxes is needed to accomplish the program. It is
proposed that this amount be comprised of $4.4 million of salE!s taxes and
$4.3 million of GO Bonds.
1990 Capital Budget
Presented on Table 1 is the adopted Capital Budget for 1990. Consisting of
14 projects at an estimated cost of $3,295,000, these capital "improvements
are to be funded by multiple sources. In addition, total bonding proposed
is $1,550,000, well below the $5 million limitation required for simplified
federal reporting.
1991-1994 Capital Program
Each year of the 1990-1994 Capital Program is presented in succession.
These projects have been programmed for the selected year according to
relative priority, construction sequencing, and available funds. The 1991
program is considered to be of higher priority and should recE!ive careful
consideration during the 1991 budget development process. However,
considerable flexibility is inherent in the plan if alternate projects are
8
appropri ate to meet community needs and des ires. It is i ntenclea that thi s
listing would provide sound guidance for subsequent capital budgetst
although annual adoption and updating will be necessary.
Projects Not Recommended for Funding
At the conclusion of the CIP document, two lists of projects are presented.
The first list includes projects which may warrant inclusion in a given year
depending upon securing a funding commitment or completion of a feasibility
study justifying benefits. The second list are identifiE~d potential
long-range needs but presently unfunded. These projects, while beneficial,
have no identified funding source, are believed to be of lesser prioritYt
may be more appropriately considered in later years, or should seek
alternate funding.
To supplement this listing, rating criteria are also provided. The rating
criteria were developed based on policy guidelines presented in Part II.
For purposes of further refinement of prioritiest projects were classified
into one of the following broad categories and shown on each project sheet:
Pri ority I: Essenti a 1 - Projects whi ch shoul d be completed as soon as
feasible in order to enhance health and safety or avoid undesirable
consequences.
Pri ority II: Important Projects
co~munity needs or objectives.
which
meet
clearly
identified
Priority III: Desirable - Projects which benefit the community but
can be delayed without detrimental effects to basic services.
Pri ority IV: Deferrable - Projects whi ch are not recommended for
inclusion in the five-year program at this time.
9
Project
Crawford St. Widening - 10th to 1-135
Rubberized R.R. Crossings
Sidewalk Construction
~
C)
Curb and Gutter Repair
Street Maintenance
Schilling and 1-135 Interchange
Temporary Fire Station
Bi-Center Roof
Central Garage Improvements
Museum AIC
Park Improvements
Recreation Improvements
Vehicles and Equipment
Contingency
TOTAL
1
2 Gas Tax.
Recreation levy.
1990 Capital Improvement Program
GO Bonds Sales Tax Revenu~ LJulids Other
$1,550,000 $ $ $
50,0001
40,000
40,0001
600,0001
40,000
20,000
75,000
50,000
10,000
150,000
120,0002
450,000
100,000 ---
$I ,550,000 I $810 ,000
$935,000 $ - ° -
Tota 1
$1,550,000
50,000
40,000
40,000
600,000
40,000
20,000
75,000
50,000
10,000
150,000
120,000
450,000
----l 00,000
$3,295,000
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAr~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL
Title and Description
Crawford Street Widening - 10th
to 1-135
Location
l
IMPROVEMENT PROGRAM
Project Cotegory
Streets
Engineering
ùepartment
Project Number
Project Priority
II
Purpose ond Justification
This oroject is the first phase of widening
Crawford to four, full-width travel lanes
(53' B-B) to Interstate 135. Each major
intersection will have a center left turn
lane.
Operating Cost Implications
Maintenance will decrease after reconstruc-
tion.
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY 1990 1991 IQQ? IQQ7, 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 1,550 1,550
EQUIPMENT
OTHER
TOTAL 1,550 1,550 G.O. Bonds
11
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title ond Description
Rubberized Railroad Crossings
Project Category
Streets
Department
Engi neeri ng
Project Number
Project Priority
II
Location
Purpose ond Justification
Locations determined annually.
This project provides rubberized crossings
where major streets cross main line
locations ln the city. Replacement of
wooden ties with rubber crossings imoroves
safety, reduces maintenance and decreases
vehicle wear and tear. Recommended fundinc
is $50,000 each year which will complete
two - three crossings annually. The City
\..¡ill purchase the materials and the rail-
road companies will complete the installa-
tion.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 1990 1991 199:> 1='" 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 50 50 50 50 50 250
OTHER
TOTAL 50 50 50 50 50 250 Gas Tax
12
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title ond Description
Sidewalk Construction
Project Category
Streets
Deportment
Engi neeri nç
Project Number
Project Priority
II
Location
Purpose and Justificotion
Locations determined annually.
A total of 24 miles exists within the City
along arterial streets where sidewalks
have not been built. This presents both a
safety hazard and a detriment to neighbor-
hood appearance. A Sidewalk Construction
Program is proposed with the City providin
50% matching funds for identified segments
on a priority basis. About 1.0 mile of
sidewalks can be built each year.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 19qn 1991 1992 1993 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 40 50 50 50 50 240
EQUIPMENT
OTHER
TOTAL 40 50 50 50 50 240 Sales Tax
13
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~"
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Curb and Gutter Reconstruction
Project Cotegory
Streets
Engineering
Deportment
Project Number
Project Priority
II
Location
Purpose ond Justification
Locations determined annually.
Along many older streets within the City
curbs and gutters have broken aoart and no
longer serve their intended ouroose. The
City should take the initiative to maintain
the public infrastructure and thus, enhance
community development objectives. A Curb
and Gutter Reconstruction Program funded at
$40,OOO/year will rebuild about 0.5 miles
of curb and gutter. ßei n9 pubii c streets,
financing is 100% City, but property owners
will be involved in the reconstruction of
deteriorated sidewalks in affected areas.
Operating Cost Implications
PROJECT COST DET AI L (Thousonós of Dollors)
CATEGORY 19C() 1991 IClCI;:> 1993 ,994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 40 40 40 40 40 200
EQUIPMENT
OTHER
TOTAL 40 40 40 40 40 200 Gas Tax
14
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1990 CAPITAL BUDGET AND 199\ -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Street Maintenance
Project Category
Streets
Department
Engineering
Project Number
Project Priority
I I
Location
Purpose ond Justification
Locations determined annually.
This project involves crack sealing.
followed by either heavy asphalt overlay
or light slurry seal. Periodic maintenance
prolongs the need for complete reconstruc-
tion.
--
Operoting Cost Implications
PROJECT COST DET AI L (ThousondS of Dollors)
CATEGORY 19C1n Iq91 Iqq;> ICIQ... Iqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 600 600 600 600 600 3,000
EQUIPMENT
OTHER
TOTAL 600 600 600 600 600 3,000 Gas Tax
15
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~w1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Schilling and 1-135 Interchange
Location
t
I
/
Project Cotegory
Streets
Engineering
Deportment
Project Number
Project Priority
II
Purpose and Justification
This project consists of the constructirn
of new interchange ramps at 1-135 and.
Schilling Road, the widening of the inter-
section of Schilling Road and 9th Street.
This is a joint project of the Salina
Airport Authority, Saline County and the
City of Salina and has been aoDroved by
KDOT for construction in 1992.
Operating Cost Implicotions
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 19qn 1991 ¡qq? IQQ7, qq4 TnTAI FUNDING SOURCES
DESIGN 40 40 I
!!
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
OTHER
TOTAL 40 40 Sales Tax
16
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAI\I1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL
T ¡tie and Description
Temporary Fire Station
Location
--
IMPROVEMENT PROGRAM
Project Cotegory Public Buildings
Department Fire
Project Number
Project Priority I I
Purpose and Justification
This project provides a temoorary fire
station for protection of North Salina
during reconstruction of the Broadway
R.R. Overpass.
Operoting Cost Implications
PROJECT COST DET AI L (ThousandS of Dollors)
CATEGORY 19qO ,q91 Iqq, ,qq, ICfCf4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 20 20
OTHER
TOTAL 20 20 Sales Tax
17
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~"
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Bicentennial Center Roof
Location
Project Category
Public Buildings
Bicentennial Center
Department
Project Number
Project Priority
I
Purpose ond Justification
This project involves the installation of a
new single membrane roof over Heritage Hall.
Water leaks need to be stopped to prevent
damage to the building.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 19C1() 'Cl91 1992 ,qq.., ,ClCl4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 75 75
EQUIPMENT
OTHER
TOTAL 75 75 Sales Tax
18
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~"
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Central Garage Improvements
Locot ion
Project Category
Public Buildings
General Services
Department
Project Number
Project Priority
I I
Purpose and Justification
This project involves: 1) Glans and
specifications for Draper storage of ga$-
oline, diesel and proDane fuel and 2)
construction of a building addition to the
Central Garage for vehicle repair and
service work and storage of valuable
equipment.
Operoting Cost Implicotions
PROJECT COST DET AI L (Thousonds of Dollars)
CATEGORY 19qO 1991 Iqq? ¡qq.., ,qQ4 TOTAL FUNDING SOURCES
DESIGN 25 25
RIGHT OF WAY
SITE
CONSTRUCTION 25 25
EQUIPMENT
OTHER
TOTAL 50 50 Sales Tax
19
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~"
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Museum Air Conditioning
Location
Project Category
Public Buildings
Arts and Humanities
Department
Project Number
Project Priori ty
II
Purpose and Justification
This project involves upgrading the temp-
erature control and air conditioning
distribution system for the Smoky Hill
Museum.
Operating Cast Implicotions
PROJECT COST DET AI L (ThousandS of Dallors)
CATEGORY 1990 1991 199::> 199~ 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY I
I
SITE
CONSTRUCTION
EQUIPMENT 10 10
OTHER
TOTAL 10 10 Sales Tax
20
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRArv1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Park Improvements
Project Category
Department
Parks and Recreation
Parks and Recreation
Project Number
Project Priority
I I I
Locat ion
Purpose ond Justification
Locations determined annually.
This oroject involves various imorovements
to the city's community and neighborhood
parks. The Parks and Recreation Advisory
Board submits an annual priority list of
orojects to the City Commission for approval
--
Operoting Cost Implications
PROJECT COST DET AI L (Thousonds of Dollars)
CATEGORY 19q() ,q91 Iqq;> QQ'I; ,qq4 T()TAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 150 75 75 100 100 500
EQUIPMENT
OTHER
TOTAL 150 75 75 100 100 500 Sales Tax
21
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRArV1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Recreation Improvements
Project Category
Parks and Recreation
Deportment
Parks and Recreation
Project Number
Project Priority
III
Location
Purpose and Justification
Locations determi~ed annually.
This project involves various imorovements
to the city's recreation facilities. The
Parks and Recreation Advisory Board submit
an annual priority list of proiects to the
City Commission for aoproval.
--
Operating Cost Implicotions
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 19C1() 1991 IClCI? 1993 Iqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 120 100 100 100 100 520
EQUIPMENT
OTHER
TOTAL 120 100 100 100 100 520 Recreati on Levy
22
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRArV1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Project Category Miscellaneous
Vehicles and Equipment Department Various
Project Number
Project Priority II
Location Purpose ond Justification
This includes various veh"icles, machinery
and equipment such as police ca rs, dump
trucks, computers, etc.
--
Operating Cost Implications
PROJECT COST DET AI L (Thousonds of Dollars)
CATEGORY 1990 1991 199:' 1993 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 450 450 450 450 450 2,250
OTHER
TOTAL 450 450 450 450 450 2,250 Sales Tax
23
1991 Capital Improvt:mt:nt Program
Project GO Bonds Sal~s Tax Revt:llue Bollds Oth~r Total
Widen Crawford - Highland to Ohio $219,000 $ $ $1,372,0001 $1,591,000
Broadway Median Modifications 40,000 40,000
Cloud and 9th St. Intersection 65,000 65,000
Street Maintenance 600,0002 600,000
Rubberized R.R. Crossings 50,0002 50,000
Sidewalk Construction 50,000 50,000
N Curb and Gutter Reconstruction 40,0002 40,000
-Þ
North St. Bridge Reconstruction 68,000 67,0003 135,000
Central Garage Fuel System 100,000 100,000
Drainage Studies 12,000 12,000
Bi-Center Operable Wall 34,000 34,000
Prescott St. Drainage Improvements 110,000 110,000
Park/Recreation Improvements 75,000 100,0004 175,000
Vehicles and Equipment 450,000 450,000
Land Use/Transportation Plan 75,000 75,000
~i~^ C+,+iM' II? ðnn".,hoc R",c 4R,000 48,000
, .". ...~u~.u" u~ ,,!'!'u. u~u~ ~~J~
Sewer Plant Improvements 7,700,000 5 10,900,000
3,200,000
Fire Pumper Truck 185,000 I 185,000
---
TOTAL $647,000 $884,000 $7,700,000 $5,429,000 $14,660,000
1 Federal Aid Urban System Funds - KDOT. 3 Saline County. 5 KDHE Grant.
2 Gas Tax. 4 Recreation Levy.
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIV1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Crawford Street Widening -
Highland to Ohio
Location
!.:.JU~~.:.:
Project Cotegory
Streets
Engineering
Deportment
Project Number
Project Priority
I I
Purpose and Justification
Widening of Crawford Street from 9th Street
to Ohio (53' B-B). This project is a .
continuation of the Phase I portion of the
Crawford reconstruction plan. It appears
that this segment will be eligible for
future KDOT funding.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollors)
CATEGORY 19C1() 1991 IClCI? IClCI'" 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 1,591 1,591
EQUIPMENT
OTHER
TOTAL 1,591 1,591 219 GO Bonds
1,372 KDOT
25
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAr~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Broadway Median Modifications
Location
Project Category
Streets
Engineering
Deportment
Project Number
Project Priority
I I
Purpose and Justification
Construction of left turn stacking lanes on
Broadway Boulevard at two (2) existing.
median breaks that currently do not have
left turn stacking lanes. This constructio
would provide safety for the existing left
turn movements.
Operoting Cost Implications
PROJECT COST DET AI L (ThousandS of Dallors)
CATEGORY 1990 1991 ¡99? 199'" 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 40 40
EQUIPMENT
OTHER
TOTAL 40 40 Sales Tax
26
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAr~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Cloud and 9th St. Intersection
Locat ion
Project Category
Streets
Engineering
Deportment
Project Number
Project Priority
I I
Purpose and Justification
It is anticipated KDOT will fund a traffic
signal imorovement oroiect at this intersec-
tion in June 1990. This proiect request is
for geometric modifications to fully utilize
the new traffic signals at this intersection
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 1990 1C¡91 1992 Iqq, 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 65 65
EQUIPMENT
OTHER
TOTAL 65 65 GO Bonds
27
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAr~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
North St. Bridge Reconstruction
Location
7\\
J
':¡r-- --
"I
,II
."
Project Category
Bridges
Department
Project Number
Project Priority
Purpose and Justification
This project involves the replacement of
the span bridge at Dry Creek with a .
reinforced concrete box structure (2-10'
X 5'). The conditi on of the present bri dge
structure is poor.
Operating Cost Implicotions
PROJECT COST DET AI L (ThousandS of DolJors)
CATEGORY 19qO ,q91 Iqq? Iqq... I ClCI4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 135 135
EQUIPMENT
OTHER
TOTAL 135 135 68 GO Bonds
67 County
28
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRArv1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Central Garage Fuel System
Location
Project Cotegory
Public Bu"ildings
Genera 1 SE~rvi ces
Deportment
Project Number
Project Priority
I I
Purpose ond Justification
Install two new EPA Approved underground
petroleum tanks. Construction should
include a constant electronic/computerized
monitoring and inventory system. New
automated fueling terminals should be
installed for gasoline, diesel and oropane.
Th~ present underground tanks at Central
Ga~age are appx. 12 yrs. old and orobably
of the uncoated steel type. Complete tank
records are not available. One fuel Dump
is 26 yrs. old, the other is 10 to 12 yrs.
old. Record keeping is by hand. There is
no leakage monitoring system or underground
Operating Cost Implicotions
containment.
PROJECT COST DET AI L (Thousonds of Dollors)
CATEGORY 199() 1991 1992 IQQ, 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 100 100
OTHER
TOTAL 100 100 Sales Tax
29
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAfv1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Drainage Studies
Location
Project Category
Drainage
Engineering/General Services
Oeportment
Project Number
Project Priority
II
Purpose and Justification
Two drainage studies are needed:
1) Old Dry Creek Channel - several storm
sewers empty into the channel and some
sections are being filled;
2) Schilling Area - the existing flood
pump is a constant maintenance problem.
Study would determine if it is still
needed.
Operoting Cost Implications
PROJECT COST DET AI L (Thousonds of Doliors)
CATEGORY 1990 1991 199:> 199.., 1994 TnTAL FUNDING SOURCES
DESIGN 12 12
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
OTHER
TOTAL 12 12 Sales Tax
3D
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRArV1
1990 CAPITAL BUDGET AND 1991-1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Bicentennial Center Operable Wall
Project Cotegory
Deportment
Public Buildings
Bicentennial Center
Project Number
Project Priority
II
Location
Purpose and Justification
Provide 60 additional feet of moveable wall
for Heritage Hall. This would permit
completely enclosing the two quarters of thE
ha 11 adjacent to the lobby. At present, we
have adequate wall to divide the hall in
half or wall off one quarter. Frequently,
we have need for two quarters. For examole
to have a meal function in one quarter and
a meeting in the adjacent quarter.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 1990 1991 199? 1993 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 34 34
OTHER
TOTAL 34 34 Sales Tax
31
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~"
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Prescott St. Drainage Improvements
Location
Project Category
Drainage
Engi neeri ng
Deportment
Project Number
Project Priority
II
Purpose ond Justification
Replace storm sewer on Prescott from Santa
Fe to 4th Street railroad tracks. As a
result of a storm cave-in, the Prescott
Street storm sewer was inspected. As far
in each direction a person can see from the
sewer line break and manholes, each section
of the vitrified clay pipe is cracked or
broke near the springline of the pipe.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY 19qn ¡q91 ,qq:;> IQQ7, qq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 110 110
EQUIPMENT
OTHER
TOTAL 110 110 GO Bonds
32
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAI~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Department
Miscellaneous
Planning
Land Use/Transportation Plan
Project Category
Project Number
Project Priority
II
Location
Purpose and Justification
City-wide
The existing Future Land Use Plan and
Transportation Plan were preoared in 1980
and 1982, respectively. Numerous changes
have occurred ln the community during the
intervening years such as Central Mall,
Downtown revitalization, and more recently
Wal-Mart. In addition, major street
projects have been comoleted or approved
for construction including Ohio, Crawford
and the Schilling Interchange. Federal
fTood hazard area regulations and a
proposed major sewer interceptor will also
have a major influence on future developmer
t
Operating Cost Implications
oatterns. A major uodate of these two play
~lements should be c~mpleted to guide the
community to the year 2000.
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 19qn 1991 Iqq? 1993 ,qq4 TOTAL FUNDING SOURCES
DESIGN 75 75
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT
OTHER
TOTAL 75 75 Sales Tax
3.3
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIV1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title ond Description
Fire Station #2 Apparatus Bays
Location
Project Category Public Buil di ngs
Deportment Fire
Project Number
Project Priority I I
Purpose and Justificotion
Create drive through apparatus bays to
alleviate the dangerous practice of backing
equipment across a busy four lane street.
This has been a problem for many years and
may result in employees being injured if no
corrected.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY 19qn 1991 1992 1993 Iqq4 TOTAl FUNOING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 48 48
EQUIPMENT
OTHER
TOTAL 48 48 Sales Tax
34
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Sewer Plant Improvements
Department
Sewer
Engineering and Utilities
Project Category
Project Number
Project Priority
I
Location
Purpose ond Justification
This project provides major modifications
to the existing plant plus upgrades teatmen
to advanced water quality levels.
.. r~
. ¡j Hi
!).)?( h!.i
//..'/ I '; I
/ r-:r~ " I
/ /; c. >..ç->.----,...",..,:;:-'~n
Operating Cost Implications
PROJECT COST DET AI L (Thousonds of Dollars)
CATEGORY 1990 1991 199/ 1993 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 10,900 10 ,900
EQUIPMENT
OTHER
TOTAL 10,900 10,900 7,700 Rev. Bonds
i ?nn KnHF
35
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRArVi
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Fire Pumper Truck
Project Category
Department
Miscellaneous
Fi re
Project Number
Project Priority
II
Location
Purpose and Justification
Replace a 1963 1000 with a 1500 four door
cab custom pumoer.
--
Operoting Cost Implications
PROJECT COST DET AI L (ThousondS of Dollars)
CATEGORY 1990 1991 199? 199~ 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 185 185
OTHER
TOTAL 185 185 GO Bonds
36
Project
GO Bonds
9th St. Drainage Improvements
185,000
150,000
Broadway and 9th St. Intersection
Schilling & 1-135 Interchange
242,000
Street Maintenance
úù
~
Rubberized R.R. Crossings
Sidewalk Construction
Curb and Gutter Reconstruction
Vehicles and Equipment
Central Garage Roof Replacement
Museum Steps/Wall Joints
Schilling Force Sewer Main
Park/Recreation Improvements
Emergency Si rell
TOTAL
--
$577,000
~ S,iline County, Salina Airport Authority and KDOT.
3 Gas Tax.
4 Saline County.
5 Recreation Levy.
Grant.
1992 Capital Improvement Prograßl
Sales Tax
Revenue Bollds
$
$
50,000
450,000
75,000
5,000
6,500,000
75,000
9,000
$664,000
$6,500,000
Other Total
185,000
]50,000
1 2,210,000
1,968,000
600,0002 600,000
50,0002 50,000
50,000
40,0002 40,000
450,000
75,000
5,0003 10,000
6,500,000
100,0004 175,000
8 ,0005 ]7,000
$2,771,000 $]0,5]2,000
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
9th St. Drainage Improvements
Location
Project Category
Drainage
Engineering
Department
Project Number
Project Priority
I I
Purpose ond Justification
Ninth Street is a major arterial street.
which becomes adversely effected by poor
drainage due to heavy rains. This area is
largely an older residential area. When-
ever there are heavy rains, the intersec-
tions from Republic to Cloud on 9th become
mostly impassible.
Operating Cost Implications
PROJECT COST DET AI L (ThousondS of Dollors)
CATEGORY 19C1() IC¡C¡ I ,CleI? ,C¡C¡:>, I C¡C¡4 TnTAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 185 185
EQUIPMENT
OTHER
TOTAL 185 185 GO Bonds
38
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAr~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL
Title and Description
Broadway and 9th St. Intersection
Location
IMPROVEMENT PROGRAM
Project Cotegory
Streets
Engineering
Deportment
Project Number
Project Priority
II
Purpose ond Justificotion
Construction of additional traffic lanes,
installation of traffic signals, etc to
minimize the traffic congestion oroblems
at or near the "Wye".
Operoting Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1990 1991 1992 1993 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 150 150
EQUIPMENT
OTHER
TOTAL 150 150 GO Bonds
39
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1990 CAPITAL BUDGET AND 1991-1994 CAPITAL
Title and Description
Schilling and 1-135 Interchange
Locat ion
------
IMPROVEMENT PROGRAM
Project Category
Streets
Engineerinq
Deportment
Project Number
Project Priority
I I
Purpose and Justification
This project consists of the construction
of new interchange ramps at I-135 and g
th Street and the improvement of the inter-
section of Schilling Road and 9th Street.
This is a joint oroiect of the Salina
Airport Authority, Saline County and the
City of Salina and has been approved by
KDOT for construction in 1992.
Operating Cost Implicotions
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 1990 199/ 19q2 1993 Iqq4 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 2,210 2,210
EQUIPMENT
OTHER
TOTAL 2,210 2,210 242 GO Bonds
1,968 County
M I rUUf"[, MU
h.
40
KDOT
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Central Garage Roof
Locat ion
Project Category
Public Buildings
Department
Genera 1 Servi ces
Project Number
Project Priority
I I
Purpose ond Justification
The galvanized roof on the utility building
has deteriorated. There are rust holes
clear through the roof. A new galvanized
tin roof and new insulation should be
installed on the existing building. In
addition, the existing roof on the street
Machinery Barn has bubbles and too many
layers of roofing for structural integrity
of the roof. It is a 1 so expected when the
roofing is removed that many of the roof
boards will ',need to be ret)laced. It is
expected that rigid insulation will be
Operoting Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 19CJ() ICJ91 ¡9CJ? l<:¡q'l 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 75 75
EQUIPMENT
OTHER
TOTAL 75 75 Sales Tax
41
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Museum Steps and Wall Joints
Locat ion
Project Category
Pub 1 i c Buil di ngs
Arts and Humanities
Deportment
Project Number
Project Priority
I I
Purpose and Justification
The front steps of the Museum are pulling
away from the building foundation at a
slight angle. This situation allows water
to pool and freeze constituting a mainten-
ance problem and pedestrian hazard. In
addition, mortar has fallen away between
the limestone block wall joints in some
areas. These joints need to be tuckpointed
Operating Cost Implications
PROJECT COST DET AI L (Thousonds of Dollors)
CATEGORY 19qO Iq91 Iqq? IQQ, Iqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 10 10
EQUIPMENT
OTHER
TOTAL 10 10 5 Sales Tax
¡:; rf""\lIn+\I
42
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Schilling Force Sewer Main
Locat ion
Project Category
Sewer
Engineering and Utilities
Department
Project Number
Project Priority
Purpose and Justification
This project involves installation of a
force sewer main from the Schilling.
Industrial Area to the main sewer treatment
plant. The Schilling Treatment Plant will
be removed from service.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY r9q() rq91 ,qq? rqq, rqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 6,500 6,500
EQUIPMENT
OTHER
TOTAL 6,500 6,500 Rev. Bonds
43
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAIM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Emergency Si ren
Project Category
Miscellaneous
Emergency Preoaredness
Department
Project Number
Project Priority
II
Location
Purpose and Justification
'~, I - -..:., - . :"'-';~i'. r--:- -I :
'. I -- ,,~, - ~.,!..I :
~ '~c--- -, ',r4
--- :: u...~d~ I~
, - ==:=dI:'-- -rilr.~-
, ~\ I'~ II 11=,1 II vel -~
- IJ lQWJ]]t[Gr~IL_-
~ ~~~1@ r ..~~"
~. ì.~.1 - :
~ ,~~~ ~ 8- ¡
~~ ' _I
\ \ ': :
\~~ ìfTI'I-¡
4) ) f~ I
The municipal golf course is an area that
is growing and the closest system is
located at Meadowlark School. We need more
coverage. This would be a Thunderbolt
siren, 3 phase 240 volt.
Operoting Cast Implicotions
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 19qn ,q91 ¡qq? Iqq, Iqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION
EQUIPMENT 17 17
OTHER
TOTAL 17 17 9 Sales Tax
8 Grant
44
Project
Street Maintenance
Rubberized R.R. Crossings
Sidewalk Construction
Curb and Gutter Repair
oakdale St. Bridge
Channel Road - Iron to Glen
~
un
State Street Bridge
Museum Handicapped Ramp
Broadway Drainóge Improvements
Cutoff Channel Stabilization
Mausoleum Renovation
Vehicles and Equipment
River Redevelopment
Water Plant Improvements
Park/Rprrp~tinn Tmn~ovømøn~c
.--- ---.-.. ""r' -'-"'-"-~
TOTAL
1
2 Gas Tax.
KOOT.
: Saline County.
Recreation Levy.
GO Bonds
1993 Capita] Improvement Program
Sales Tax Revenue Bonds Other Tota]
$ $ $600,0001 $ 600,000
50,0001 50,000
50,000 50,000
40,0001 40,000
26,000 296,0002 322,000
200,000
8,000 97,0002 105,000
9,000 9,0003 18,000
190,000 190,000
62,000 62,000
14,000 14,000
450,000 450,000
650,000
5,000,000 5,000,000
1nn noo .nn nnn4 -~ûû,ûûû
.uu,uuu LUU,UUU
$909,000 $5,000,000 $1,192,000 $7,951,000
$
200,000
650,000
$850,000
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1990 CAPITAL BUDGET AND 1991-1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Project Category
Oakda 1 e St. Sri dge @ 01 d Ri ver Channel Department
Location
Bridges
Engineering
Project Number
Project Priority
I I
Purpose ond Justification
Remove and replace the concrete deck on
this bridge. Serious structural deterior-
ation has occurred.
Operating Cost Implications
PROJECT COST DET AI L (Thousonds of Dollors)
CATEGORY 19C1n 1991 ,ClCI? Iqq... 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 322 322
EQUIPMENT
OTHER
TOTAL 322 322 26 Sales Tax
296 KDOT
46
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~"
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Channel Road Reconstruction
Project Category Streets
Deportment General Services
Project Number
Project Priority II
Locat ion
Purpose and Justification
r
Channel Road between Iron a nd Glen undulate
so bad that the street is becoming a traffi
hazard. The marks and gouges in the pave-
ment is evidence of vehicles bottoming and
dragging due to the uneven road surface.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY 1990 1991 1992 1993 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 200 200
EQUIPMENT
OTHER
TOTAL 200 200 GO Bonds
47
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAMI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL
IMPROVEMENT PROGRAM
Title and Description
State Street Bridge @ Dry Creek
Deportment
Bridges
Engineering
Project Category
Project Number
Project Priority
I I
Location
Purpose and Justification
.11
.n
-~ \ l'[ ¡,
::::::!:_~:::::
Remove the existing span bridge at this
location and construct a reinforced
concrete box structure as a replacement.
Concrete deterioration is apparent on
piers and deck.
Operating Cost Implications
I
I
I
I
I
~
!~
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 19CJO ICJ91 ,CJCJ? IQQ, 1994 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRuCTION 105 105
EQUIPMENT
OTHER
TOTAL 105 105 8 Sales Tax
97 KDOT
48
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL
IMPROVEMENT PROGRAM
Title and Description
Museum Handicapped Ramp
Project Category
Deportment
Public Buildings
Arts and Humanities
Project Number
Project Priority
I I
Location
Purpose and Jus titicotion
"
-T
An access ramp would be located at the west
entrance (8th Street) of the Smoky Hill
Museum. Currently, the only handicap access
to any floor of the museum is through the
front door, therefore, a staff person must
be on duty to unlock the museum, disarm the
security system, unlock a second door, and
direct people to the passenger elevator
adjacent to the west entrance. -As the
building (the community rooms on the second
floor) is being increasinç¡ly used during off
hours, staff is not always available to
lmlor:k the only ar:cessible entrance to those
Operating Cost Implications
-,
areas.
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 1990 1991 199? 199" ,994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
I
CONSTRUCTION 18 18
EQUIPMENT
OTHER
TOTAL 18 18 9 Sales Tax
9 County
49
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRANI
1990 CAPITAL BUDGET AND 1991-1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Broadway Drainage Improvements
Project Category
Department
Drainage
Genera 1 Senti ces
Project Number
Project Priority
I I
Locat ion
Purpose ond Justificotion
During heavy rains, Broadway west of Sunset
Park becomes flooded for a short oeriod'of
time. As a major arterial street carrying
a large volume of traffic, ponding of water
makes this street hazardous. Secondly, all
of the inlets along Broadway are in need of
repair. The deterioration and repair needs
are largely due to age and movement of the
pavement. Finally, a storm sewer that once
drained Broadway near North Street and the
Railroad tracks has been plugged by develop
ment. This project should include new
inlets and storm sewer to rid this section
Operating Cost Implications
of Broadway of storm run-off.
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY Iqcln 1991 IQQ? 1993 ,qq4 TnTAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 190 190
EQUIPMENT
OTHER
TOTAL 190 190 Sales Tax
50
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~'
1990 CAPITAL BUDGET AND 1991 -/994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Department
Drainage
General Services
Cutoff Channel Stablization
Project Category
Project Number
Project Priority
I I
Location
Purpose ond Justification
There are four ditch checks in a drainage
creek emptying into the Dry Creek cutoH
channel. The purpose of the ditch checks
is to keep the floor of the creek from
eroding. The problem was first recorded
by the Army CorD of Engineers in 1981.
When the cutoff channel was built, large
rubble was placed in the plunge pool area
to dissipate the energy of the ~ater drop-
ping to a lower elevation (about 12 ft.).
There must be more energy than anticipated
because the rubble has been moved and many
have been broken. The plunge 0001 is now
Operating Cost Implications
cutting or scouring back under the concrete
check. If the cut becomes large enough,
the concrete ditch check will fail. The
Army Corps Inspector has suggested placing
concrete in the plunge pool to stop the
cutting action of the water.
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY ,qq() 1991 ,qq? ¡qq.., 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE 62 62
CONSTRUCTION
EQUIPMENT
OTHER
TOTAL 62 62 Sales Tax
51
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRANI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title ond Description
Mausoleum Renovation
Project Category
Deportment
Public Buildings
General Services
Project Number
Project Priority
II
Location
Purpose ond Justificotion
The mortar in the Gypsum Hill Mausoleum
is beginning to fallout in the masonry~
The mortar should be re-pointed. The roof
should be inspected and leaks corrected by
professionals. There is copper flashing
coming loose and should be repaired. This
is a maintenance project aimed at preserv-
ing the 1920's building which the City owns
--
Operating Cost Implications
PROJECT COST DET AI L (ThousondS of Dollars)
CATEGORY I CC() 1991 19°2 1Cj93 I CC4 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 14 14
EQUIPMENT
OTHER
TOTAL 14 14 Sales Tax
52
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~~
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
River Redevelopment
Locat ion
Project Category
parks and Recreation
Deportment
Project Number
Project Priority
III
PurPOSe ond Justification
This project involves the dredging of the
old river channel adjacent to Oakdale .
Park from approximately 1,200 ft. south of
the Oakdale Bridge downstream to a point
approximately 300 ft. north of the Mulberry
Bridge. A desilting basin is also required
prior to any additional channel dredging.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollars)
CATEGORY 19C1n 1991 ClCI? qq7, 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 650 650
EQUIPMENT
OTHER
TOTAL 650 650 GO Bonds
53
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAWI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Water Plant Improvements
Location
Project Category
Water
Engineering and Utilities
Deportment
Project Number
Project Priority
I I
Purpose ond Justification
This project will complete the upgrading
of the city's water plant by expanding
treatment capacity.
Operoting Cost Implications
PROJECT COST DET AI L (Thousonds of Dollars)
CATEGORY Iq",n """'I IClCI;> IQQ7, 1"""4 TnTAI FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 5,000 5,000
EQUIPMENT
OTHER
TOTAL 5,000 5,000 Rev. Bonds
54
Project
Ohio - Johnstown to Elm
Magnolia & 1-135
Street Maintenance
Rubberized R.R. Crossings
Sidewalk Construction
un
un
Curb and Gutter Repair
Downtown Drainage Inlets
Walnut St. Bridge Renovation
Mulberry St. Bridge Renovation
Police/Sheriff Secured Parking
Interceptor Sewer Repairs
Vehicles and Equipment
Water Tower - E. Salina
Park/Recreation Improvements
1994 Capital Improvement Program
GO Bonds
Sales Täx
R"ve,ut: Bonds
$ 481,000
$
$
50,000
270,000
80,000
105,000
144,000
585,000
450,000
600,000
100,000
$666,000 $1,014,000 $1,185,000
TOTAL
1
2 KDOT and Special Assessment Bonds.
Gas Tax.
3 Saline County.
: Special Assessment Bonds.
Recreation levy.
Other
Total
$
$ 481,000
1,750,000
1
1,750,000
600,0002
50,0002
600,000
50,000
40,0002
50,000
40,000
270,000
80,000
144,0003
105,000
288,000
585,000
450,000
400,0004
100,0004
$3,084,000
1,000,000
200,0003
$5,949,000
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAM
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Ohio - Johnstown to Elm
Location
"
Project Category
Streets
Engi neeri ng
Department
Project Number
Project Priority
III
Purpose and Justification
This project consists of widening Ohio from
4 narrow lanes to a 5 lane section
(4 standard thru lanes with a center turn
lane) from Johnstown to Elm Street.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollars)
CATEGORY 19qn 1991 ,qq., Iqq~ Iqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 481 481
EQUIPMENT
OTHER
TOTAL 481 418 GO Bonds
56
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~1
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Magnolia/I-135 Interchange
Location
I
I '
~ , ,I-
r"
Project Cote gory Streets
Department Planning
Project Number
Project Priority I I
Purpose and Justification
This project consists of new interchange at
Magnolia and Interstate 135. This improve-
ment would provide interstate access for
traffic destined for the Schilling Indust-
rial Area, Kansas College of Technology,
and the 9th Street shooping centers
(Central and Mid-State Malls). Potential
funding may be available from the Kansas
Department of Transportation under the new
System Enhancement Program.
Operating Cost Implicotions
PROJECT COST DET AI L (Thousonds of Dollars)
CATEGORY 199() 1991 199::> Iqq~ IGG4 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 1, 750 1, 750
EQUIPMENT
OTHER
TOTAL 1, 750 1, 750 KDOT
Special Assessmen
ts
57
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~'
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title ond Description
Downtown Drainage Inlets
Project Cotegory
Deportment
Drainage
General Services
Project Number
Project Priority
II
Location
Purpose and Justification
Age and deterioration has left most all. of
the downtown inlets in poor condition.
Several of the inlet fronts are in need of
repair. However, the handicao criteria
make it necessary to have engineering draw-~
ings and a Dlan before proceeding. Also,
due to the sloDe criteria, extensive
sidewalk replacement may be nec~ssary.
Operating Cost Implications
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY 19qn ,c¡c¡ Iqc¡? qq", qq4 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 270 270
EQUIPMENT
OTHER
TOTAL 270 270 Sales Tax
58
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAMI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title ond Description
Walnut Street Bridge at Old River
Channel
Locat ion
Project Category
Deportment
Bridges
Engineering
Project Number
Project Priority
I I
Purpose ond Justification
Remove and replace the concrete deck on
this bridge. Serious structural deterior-
ation has occurred.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of DolIor5)
CATEGORY 19qn 1991 Iqq? ,qq, Iqq4 TOTAL FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 80 80
EQUIPMENT
OTHER
TOTAL 80 80 GO Bonds
59
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAWI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Mulberry Street Brige @ Old River
Channel
Location
Project Cotegory
Bridges
Engineering
Department
Project Number
Project Priority
II
Purpose ond Justification
Remove and replace the concrete deck on
this bridge. Serious structural deteriora-
tion has occurred.
Operating Cost Implicotions
PROJECT COST DET AI L (Thousands of Dollors)
CATEGORY 19qn 1991 ,qq? Iqq~ 1994 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 105 105
EQUIPMENT
OTHER
TOTAL 105 105 GO Bonds
60
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRAMI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Police/Sheriff Secured Parking
Project Category Public Buil di ngs
Deportment Police
Project Number
Project Priority I I
Location
Purpose and Justificotian
To provide a secured and orotected area
for prisoner transfer, security of ooli'ce
vehicles, vehicles of persons in custody,
etc. Project consists of purchasing
property on east half of city block locate
directly west of the Police and Sheriff
buildings, raze building and orepare site
for resurfacing, fencing and lighting.
Also includes closing llU Str~t between
Elm and Park Streets.
Operating Cost Implications
PROJECT COST DET AI L (ThousandS of Dollors)
CATEGORY 19<:\1"\ 1<:\91 ,GG;> 1 c\c\... 10<:\4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 288 288
EQUIPMENT
OTHER
TOTAL 288 288 144 Sales Tax
1/1/1 rf'llln+1I
61
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRANI
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Deportment
Sewer
Engineering and Utilities
Interceptor Sewer Repairs
Project Category
Project Number
Project Priority
I I
Location
Purpose ond Justification
This project involves rehabilitation of
various sewer lines and pump stations.
--
Operating Cost Implications
PROJECT COST DET AI L (ThousondS of Dollars)
CATEGORY 199() 1991 IClCI? Iqq~ Iqq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 585 585
EQUIPMENT
OTHER
TOTAL 585 585 Rev. Bonds
62
CITY OF SALINA
CAPITAL IMPROVEMENT PROGRA~I
1990 CAPITAL BUDGET AND 1991 -1994 CAPITAL IMPROVEMENT PROGRAM
Title and Description
Water Tower - East Salina
Project Category
Water
Deportment
Engineering and Utilities
Project Number
Project Priority
II
Location
Purpose ond Justification
This project would provide a new water.
tower to improve water pressure to
developing areas east of the Smoky Hill
River.
Operating Cost Implicotions
PROJECT COST DET AI L (ThousondS of Dollors)
CATEGORY 19Qn ,q91 ,qq? Iqq.., ,qq4 TOTAl FUNDING SOURCES
DESIGN
RIGHT OF WAY
SITE
CONSTRUCTION 1,000 1,000
EQUIPMENT
OTHER
TOTAL 1,000 1,000 600 Rev. Bonds
/Inn <::nor';;'Il AC"C"ðC
sment
63
1990-1994 Capital Financing Plan
Year GO Bonds Sales Tax Revenue Bonds Ga~_.!ax Other Total
1990 $1,550,000 $ 935,000 $ - 0 - $ 690,000 $ 120,0001 $ 3,295,000
1991 647,000 884,000 7,700,000 690,000 4,739,0002 14,660,000
1992 577,000 664,000 6,500,000 690,000 2,081,0003 10,512,000
1993 850,000 909,000 5,000,000 690,000 502,0004 7,951,000
0) 1994 666,000 1,014,000 1,185,000 690,000 2.394,0005 ~49,OOO
-Þ
TOTAL $4,290,000 $4,406,000 $20,385,000 $3,450,000 $9,836,000 $42,367,000
~ Recreation levy.
KOOT. KDHE, Saline County, Recreation levy.
¡ KDOT. Saline County, Salina Airport Authority, Recreation levy.
KOOT. Saline County, Recreation levy.
5 KOOT, Saline County, Special Assessments, Recreation levy.
Projects with Potential for Inclusion in
1990-1994 crp but Awaiting Funding
Commitments and/or Feasibility Analysis
Project
Schiiling Road Bridge @ Dry Creek
Cost Estimate
ClOUd Street Bridge @ Dry Creek
$360,000
85,000
Crawford and Centennial Traffic Signals
Fox Theatre Renovation
80,000
850,000
Memorial Hall Renovation
Bi-Center Lobby/Office Expansion
160,000
191,000
Par 3 Golf Course
350,000
Water Main Replacement - Water Well Road
65
Projects Identified but Unfunded
in 1990-1994 CIP
Project
Belmont and Magnolia Intersection
Schilling Pedestrian Bridge
Recreation Center
Police Parking Lot
General Service Parking
State Street Reconstruction
Ohio Street R.R. Overpass
Schilling Road Improvements
Centennial Road Improvements
South Salina Drainage
66
Cost Estimate
$ 300,000
200,000
2,500,000
121,000
80,000
3,000,000
9,000,000
1,300,000
7,000,000
7,000,000
CIP PRIORITY RATING CRITERIA
Project
Tota 1 Score
1. Need for Facility 6. Supports Related Fac:i 1 ity
Critical 10 Major Assist 10
Important 6 Minor Assist 5
Desirable 2 None 0
Questionable 0
2. People Benefitting 7. Economic Impact - Jobs, Income, etc.
Total City 10 Major Stimulus 10
Several Neigh. 6 Minor Stimulus 5
One Neigh. 2 None 0
Fewer 0
3. Useful Li fe (yea rs) 8. Funding Source
21 + 10 Grant 51-100% 10
11-20 6 Grant LT 50% 6
6-10 2 Rev. Bonds 2
1-5 0 Local Taxes 0
4. Improves Pu.b 1 i c Service 9. Revenue Impact - Taxes, Fees, etc.
Major Advance 10 Major Increase 10
Minor Advance 5 Minor Increase 5
No Charge 0 None 0
5. Requires Land/Personnel/Equipment 10. Public Support
Major Need 0 High 10
Minor Need 2 Moderate 5
None 6 Low 0
Net Savings 10
Note:
Circle score for each item and total.
Maximum Score-l00 points.
67