Annual Report - 1977 '«-« d___<_<"-<-----<---"~<--<-«-«--_..<--,_.~ CITY OF SALINA WATER AND SEWERAGE DEPARTMENT ANNUAL REPORT 1977 - RON WEBSTER, DIRECTOR OF UTILITIES CUSTOMER SERVICE AND ACCOUNTING LaVerne Pauls, Office Manager WATER TREATMENT AND DISTRIBUTION Wesley Morris, Superintendent SEWERAGE COLLECTION AND TREATMENT George Pauls, Superintendent _L._<.__.,-_.~-<--_.._<--_. < .---.-.--...-- . .. <-«--< ._-. <m < WATER PRODUCTION YEARLY TOTAL 1977. MONTHLY AVERAGE Total Gallons Pumped Ga 11 ons Wells 2,113,786,000 897,925,000 176,149,000 74,827,000 Gallons River 1,215,861,000 NONE 101,322,000 NONE Gallons Plant No.2 DEPTH OF WATER IN OBSERVATION WELLS Well Number March June September 1 40.05 39.50 41.20 2 33.28 33.65 35.23 3 60.30 62.00 63. 15 December 39.40 35.90 63.00 57.5% of the water pumped was from the Smoky Hill River. 42.5% from-15 wells. The most water pumped in one month was July - 312,085,000 gallons. The. lease amount was in February 135,384,000 gallons. Average pumping was 5.8 million gallons per day. Largest day was 13,308,000 gallons on 19 July. Smallest day was 4,570,000 on:January 2,1977. 23,040,000 gallons of water was used to backwash filters. This is 1.08% of the total water pumped. CHEMICALS USED IN 1977 CHEMICALS TONS COST lime-Ca 1 ci ned 3,262.91 $ 64,896.06 Soda Ash 1,134.94 77,403.57 Chlorine 84.00 17,791.20 Alum 221.58 32,382.18 Calgon 12.00 7,536.00 Fluoride 12.00 4,596.00 Nalcolite "607" 2.04 2,384.72 $ 206,989.73 We distilled 530 gallons of water for: Sewage Plant 275 Sewerage Crew 5 Central Garage 75 Golf Course 5 Water Plant 170 - _..-..~~_._--<--- .... -..-.--.. January 03 January 12 January 18 January 18 January 19 .' January 20 January 26 January 27 February 10 February 14 February 15 February 15 March 2 March 7 Ma rch 11 March 14 March 22 March 23 "'.- .... ---.-.--.-.---.-.-- . 1977 WATER PLANT REPAIRS ACCOMPLISHED IN 1977 Ordered circuit breaker for calcine plant, received . r4arch 17, 1977 and installed it. Cleaned north lime slaker and painted it. Replaced broken ring gasket on valve in air compressor in filter building. Changed oil and installed new fi 1 ters. Had babbit ~earing built up on number one high service pump. New bearings and pillow blocks for dust' collector. new No. 862 belts. Th ree Cleaned roto-clone and scrubber line. Installed diaphragm on south lime machine. scale and rebalanced it. Clean~d Had welder weld two scrappers on No.3 basin. They had come loose and stopped the arms. Washed roto-clone and cleaned scrubber and scrubber line. Installed new front plate on west carballo that fit on plate machined down. Had all parts Put new three inch union on roto-clone line above scrubber tank. Two new bearings on south lime slaker motor. Repaired well number sixteen motor. March 14. Rei ns talled it Started filling river basin at 8:30 AM. at 12:00 PM. Finished filling Greased calcine plant. Replaced the bearings in river pump. sleeve and put on a new U joint. Rebuilt the packing Washed out secondary basin and cleaned diffusers- Built up No. three and four furnace screws and put on new bearings. Put two new bearings on No. sjx and seven screws. «_.-. '.' <.----,..--..------- --<- ... Apri 1 4 Apri15 April 19 April 20 May 5 May 17 July 14 August 24 August 31 . September 6 September 7' «<-«-"---..-"., --.. ,--.---<-. ---. 1977 WATER PLANT REPAIRS ACCOMPLISHED IN 1977 Continued Washed out roto-clone and scrubber. Cleaned out cage mill Tine and furnace draft lines. Installed drive belt on No. three basin. drive chain. Tightened Cleaned all gas cocks on calcine plant and cleaned out scrubber line and water intake line for roto-clone. Rebuilt piston for sludge pump with ceramic coating. Received June 13,1977. Repaired No. one pump. Installed new seals in bear- ing housing and new bearings on shaft. Built up the packing sleeves and made new seal slots in bearing housing. Started puuting it in May 24. Repaired electric motor on Key Acres valve. Washed out river basin. Cleaned out south lime slaker. Installed two new bearings and new packing sleeves on No. six pump. Put two new bearings on No. five pump. September 13 Pulled out lightning mixer and disassembled. Had a ceramic coating put on the shaft. Cost: $175.00, new shaft would cost about $600.00. September 15 Washed outside sludge tank. September 19 Installed new bearings and seals in Sutorbilt blower. September 20 Put new bearings in east outside lightning mixer. September 24 Started to work on new sludge treatment tank in north, yard. Started cutting down trees on N.E. corner of plant. September " 7 Put in two new butterfly val ves and hooked up a new recirculating line for sludge to No. one basin. Had a ceramic coating put on the sludge pump piston. Installed sludge pump piston September 28. .. September 27 Started up softenin~ basin #1. After completion and replacement of all new steel, cement column, weirs, weir pumps, sweeps, etc. ,<--- --~._-<--'-'----<~<-'--- . "'-"-_.----'._-"'-' 1977 WATER PLANT REPAIRS ACCOMPLISHED IN 1977 Continued September 28 Built up the furnace agitator in the calcine plant. Built up No. seven and eight furnace screws. October 4 October 5 October 7 October 13 October 24 October 27 October 28 November 16 November 21 December 1 December 6 Decembe r 8 December 12 December 14 December 15 December 15 December 20 December 21 December 28 Took motor off. north bin, repaired screws. Installed new diaphragm in north lime slaker. Put motor back in service. Washed out secondary basin and cleaned out defussers. Dr FF~'Sc:!:l Put new shaft and bearings on river pump,. New packing sleeve Put new bearing in No.5 gang screw on top of calcine plant Put the north lightning mixer back in service. It has all new bearings and a rebuilt shaft. Repaired the west mixer. shaft. Received new river pump which has new bearings and shaft. New wearing rings. Changed south calcine plant collecting screw. Repairing old collecting screw. ' , "-----, :;? Put new pairchut packing in number three sludge pump.- Pulled out number five pump motor in main pump house for repairs. Drained number one basin. Reported bent lines. Washed out roto-cone and cleaned out scrubber lines. Cleaned out b~o chemical arms. Put new time delay switch in No.7 pump. Cleaned and greased calcine cyclone. Put west lightning mixer back in service with new bearings and a ceramic coating on shaft. Cut trees and cleaned fence row at South Plant. Took boiler out of service at South Plant. basin, feed lines were repaired. Fill ed No.1 No.5 pump back in service with new windings. -----","--" --,~--..~-_... -_._----~~-<.........- ......... <-.......'" . 1977 WATER MAIN BREAKS IN 1977 DATE SIZE LOCATION TYPE MATERIAL 02-02-77 6" South of 141 Channel Road Ci rcumferenti a 1 Smith Blair Clamp '0]-10-77 6" 1510 Pueblo Ci rcumferenti a 1 Smith Blair Clamp Shut off at main 01-10-77 1/211 248 North Penn Blowout Turned over to plumber Shut off at mai n 01-11- 77 3/4" 220 North Columbia Blowout Turned over to plumber 01-12-77 8" Airbase South of Bldg. Circumferential 2-Smith Blai r C1 amps No. 448 ~ 01-16-77 611 2045 le1and Way Circumferential Smith Blair Ç1amp 01-18-77 4" 400 Blk South 4th Circumferential Smith Blair Clamp 01-20-77 411 West Place between Circumferential Smith Blair Clamp Park and Elm 01-27-77 3/4" 719 Maple Frozen servi ce Lowered Service I 02-02-77 611 Overhill Rd, Country Circumferential Smith Blair Clamp / Club Rd. 03-11-77 6" Bldg. #560 Air Base Circumferential Smith Ba1ir Clamp 04-14-77 211 Iron & Marymount Rd Blowout 3-2" Clamps - Blowout 0 04-27-77 1011 Crawford and Santa Fe 4-90 bends 2-Smith B~air 71 CIP 05-03-77 8" Crawford and Fairdale Broken tapping sleeve 8x8 Tapping Sleeve 06-14-77 6" Albert and Ohio Bell split 21 CIP 2-Smith Balir Sleeves 06- 18- 77 2" 86 W Bld. Air Base Blowout Smith Blair Clamp 07-07-77 8/1 East Crawford Bridge Blown Apart 2-Tie Downs Golf Course Line 08-05-77 6/1 1011 North 10th Longitudinal Smith Blair Clamp ----., .... - ,~-----., .....___..n__,..,.-..-..,- -"'.. 1977 WATER MAIN BREAKS IN 1977 DATE SIZE LOCATION TYPE MATERIAL 08-05-77 4" 640 McAdams Blowout 211 Plug 08-15-77 6" Santa Fe and Prescott Longitudinal 2-Smith Blair Sleeves 08-17-77 3" -Checker Tower, Air Base Blowout Adams Cl amp 08-22-77 6" Edgehilland Seitz Blowout Smith Blair Clamp 08-27-7.7 611 Mission and Lambertson Ci rcumferenti a] Smith Blair Clamp 09-01-77 6" 747 South Ohio Circumferential 1" Tapped Ductile Sleev 10-05-77 6" 2552 North Ninth Circumferential Smith Blair Clamp " 10-08-77 4" Rush and Clafl in Circumferential Smith Blair Clamp 10-08-77 611 113 North Douglas Circumferential Smith Blair Clamp 10-28- 77' 3/4" 218 North Phillips Blowout Abandon Service 11-21-77 4" 400 South Fourth Circumferential Smith Blair Sleeve 11-25- 77 3/4" 122 North Ohio Broken on street side 3/411 curb stop used TAP SLEEVE VALVE DATE SIZE LOCATION 02-25-77 6" X 2" Republic and Osborne 03-15-77 6" X 4" 600 Block East Johnstown 03-16-77 6" X 4" 600 Block East Johnstown 03-24-77 6" X 4" Building No. 606 Air Base 04-04-77 6" X 6" 1900 East Crawford 04-12-77 6" X 6" 1900 East Crawford 04-18-77 8" X 2" Parklane Housing .-.< ._-_c<c_--~---,_... DATE 04-19-77 04-27-77 05-27-77 06-06-77 06-21-77 08-08-77 09-:-15-77 ... 09-19-77 09-20-77 10-06-77 ,10-13-77 "----'----.- SIZE 8" X 8" 24" X 6" 6" X 2" 411 X 211 6" X 6" 811 X 411 12" X 2" 6" X 6" 6" X 6" 4" X 4" 6" X 6" ---<-'-"-'_<n--- TAP SLEEVE VALVE LOCATION Park1ane Housing . Waterwell Road 544 Uppermi 11 Cloud and Osborne Broadway and Armory Road Fairdale and Cra~ford 2100 Block Planet Fairdale and Country Hills 2108 Country Hills Road York and Chester North and Garfield 1977 . . '...,"-_._~-~--- o<~...~,.._-_...._.,_._-... """'---'-"'"--... "."-'-""'--'--",---",-- ---..- ",... WATER DISTRIBUTION MAINTENANCE Fire Hydrant Maintenance-----------------------------153 Preventive Maintenance on Main Valves----------------238 1" Service Taps Made---------------------------------181 Tower Readings (once a week)-------------------------215 Water Wells Serviced---------------------------------746 Service Calls from Water Plant-----------------------286 Shut Off Water Mains for Plumbers---------------~---- 16 Traced Service Lines--------------------------------- 5 Preventive Maintenance on Check Valves---------------103 Changed Overhead Storage Lights---------------------- 14 Fire Flow Tests-------------------------------------- 16 Painted Bottom of Key Acres Tower-------------------- 2 Flushed All Fire Hydrants in City in Month of April. Painted and Dressed Well House No. 14. Replaced 8 X 8 Tapping Sleeve and Valve- Smoky Hill. Relocated Fire Hydrant No. 2072 on Irene Avenue. Pumped water from valve pit' at Key Acres Tank located at Belmont and Magnolia, due to high water. Updating of Street Map - Water Valves, Linest Fire Hydrants. Abandon 3" Water Main on Pine Street. Leaded Cross' on Ohio for Contractors - Smoky Hill and Earth Excavation. Installed 360' of 8" C.I.P eleven feet deep Sewer Plant No.2 Changed over 8" CIP to Well - Gol f Course. Installed 170' Chain Fence Sewer Plant No.2. Repaired 6" Sewer Line 500 Block South Ohio. 1977 .«.... - -- 1977 WATER DISTRIBUTION MAINTENANCE Continued Installed 60' Fence and New Post - Sunset Tower. Replaced Corporation Blowoff 100 Block South Second. Cleaned and Cut Culvert YMCA Area. 6" Cut In College and Walnut - South and College Worked 228 North, Phillips. 4" and 2" valvès replaced at Second and,Pine - Y,ale and Tulane. Extention on Fire Hydrants - Dewey Street. _",_n' ---. ""-----""'- -""""_"'n~""'_'_--"--,_.,,-,, 1977 SEWAGE TREATMENT PLANT NO. I This plant received an average of 5,431,000 gallons per day. The B.O.D. averaged 186 mg/l per day and 94% of this was removed, giving a final effluent of 11.6 mg/l B.O.D. The suspended solids averaged 228 mg/1 per day, 96% of this was removed, leaving 8.3 in the final effluent. Total sludge pumped to digesters was 18,975,620 gallons. An average of 51,988 gallons per day. The volatile solids were reduced by 85% before the supernatant was returned to the plant. A total of 1,147,500 gallons of digested sludge was removed from the digesters. 184,000 gallons was run to drying beds and 963,500 gallons was hauled to the field. . IMPROVEMENTS AND REPAIRS PLANT NO. I New bar screen and rag dump was replaced in the grit chamber. The rest of the equipment on the grit chamber was sandblasted and painted. Bearings were replaced in No.1 mixer motor on digester tank No.2. All three sludge pumps in digester basement had shaft sleeves and pack- ing gland bolts replaced. We had some minor problems with the burner on the boiler and two con- trol valves had to be replaced. The tubes and plates in the boiler are in good condition. We have not had leaks or corrosion problems since we started using city water and adding chemicals in December 1975. U joints were replaced on No.2 filter pump. 'Bearings and impeller was replaced 'in No.1 secondary sludge pump. New valve head and bearings were replaced on automatic butterfly vålve. GENERAL IMPROVEMENTS AND MISCELLANEOUS Received new LeRoy air compressor. Received a new 8" centrifugal pump; gasoline driven engine. was received from Civil Defense. Thi s pump ,250 persons toured the plant this year. This number includes groups, from elementary schools, scouts, YMCA, colleges, technical institutes and churches. ' -----'<--~~~"--'._-~-' - ..'." , - ...._-~._. , -.... -, -"..«,-- ..... «-- --... 1977 ' GENERAL IMPROVEMENTS AND MISCELLANEOUS Continued CERTIFICATION STATUS OF OPERATORS George Pauls Arthur Grover George Wi lson Ivan Gildersleve Norman Korbe Chester Darby "B" "A" "C" "C" "8" "C" . '. Mr. Robert Greenall, Environmental Protection Agency, was here July 13 through July 17, checking the B.O.D., C.O.D., S.S. and pH of both sewage treatment plants effluent. The samples which he ran tests on were split with us. The same tests were,run in our laboratory and sent to them for comparison to their analysis and returned to us. Our C.O.D. results were consistently higher, the others were very close. '-'--......_'--~_..._---~-----_..,_....--_.. _..."---~---,--,-_.._,_.-...__._-----_..._- .. '--..,..,....... -..- '.. 1977 SEWAGE TREATMENT PLANT NO. I Efficiency in Suspended Solids Removal Flow Raw Lbs/day. Final Lbs/day % Re- Lbs/day Aver/lbs 1977 mgd mg/l Received mg/1 Returned duction Removed capita/day January 4.791 256 10,228 11.3 451 / 96 9,777 .269 February 4.610 237 9,112 15.9 611 93. 8,501 .239 March 4.403 284 10,428 13.1 481 94 9,941 .274 Apri 1 4.762 326 12,947 4.2 166 Q9 12,781 .340 May 5.502 262 12,022 4.0 183 98 11,839 .316 June 5.823 135 6,556 6.4 310 95 6,246 .172 July 6.516 156 8,477 9.7 527 94 7,950 .223 August 7.018 262 15,334 7.1 415 97 14,919 .403 September 6.395 239 12,746 8.2 437 ' 97 12,309 .335 October 5.003 221 9,221 7.0 292 97 8,929 .242 November 4.928; 132 5,425 ,4A 180 97.,..., 5,245 .142 December 194 7,712 6.6 262 97 7,450 .202 Average 5.4 ' 225 10,109 8.1 365 96 9,743, .266 """"'--'-..-..-----...... .. -- .. --<,.'..««.... 1917 SEWAGE TREATMENT PLANT NO. I Efficiency in B.O.D. Removal Flow Raw Lbs/day Final Lbs/day % Re- Lbs/day Averl1bs 1977 mgd mg/1 Received mg/1 Returned duction Removed cap,ita/da: January 4.791 272 10,868 19.7 787 . 93 10,081 .286 February 4.610 205 7,881 18.6 715 91 7,166 .207 March 4.403 208 7,637 15.6 572 93 7,065 .200 Apri 1 4.762 240 9,531 12.5 496 95 .9,035 .250 May 5.502 155 7,112 7.0 321 95 6,791 .187 June 5.823 159 7,721 12.4 602 92 7,119 .203 July 6.516 141 7,662 7.7 418 95 7,244 .201 August 7.018 159 9,306 10.0 585 94 8,721 .244 September 6.395 166 8,853 11.4 608 93 8,245 .232 October 5.003 180 7,510 6.3 262 97 7,248 .197 November 4.928 164 6,740 7.1 292 96, 6,448 .I77 December 4.767 241 10,972 15.9 632 93 10,340 .288 Average 5.375 190 8,636 11.9 533 94 8,102 .222 - _.---~---~,_.~-«--". < -«-,-_...,-,._- , ., """"'-"'----""--,,, '-"......"--- "...,.---.....-....... 1977 SEWAGE TREATMENT PLANT NO.2 The flow to this plant was estimated at 380,000 gallons per day. The B.O.D. averaged 289 mg/l per day and 93% of this was removed, giving a final effluent of 20.4 mg/l B.O.D. The suspended solids averaged 171 mg/l per day, 92% was removed, leaving 14 mg/l in the final effluent. An estimated 730,000 gallons of sludge was pumped to the digester. 256,500 gallons of liquid sludge was hauled to fields; 103,000 gallons run to drying beds. IMPROVEMENTS AND REPAIRS Due to low flow to this plant a recirculating line was installed from the west filter junction box to the manhole in front of the plant. The 18 inch inlet gate valve to the plant was dug up and repaired and replaced in good working order. Bearings and seal was installed in No.1 mixer motor. Replaced bottom ring and seal in commutator in wet wells. Office and storage buildings were painted on the outside. Received bids for installing flow meter at this plant November 27,1977. Smoky Hill was awarded the contract and will begin work in January 1978. At this time both sewage treatment plants are meeting the effluent limitations of our National Pollution Discharge Elimination Sy~tem Permit. - 1977 SEWAGE TREATMENT PLANT NO.2 Efficiency in B.O.D. Removal RAW FINAL RB10VED 1977 Flow mg!l 1 b/day mg/l 1 b/ day lb/day % '« January 259 820 52.0 164 656 80 February 350 1,109 36.6 116 993 89 March 183 579 18. 1 57 522 90 t:O Apri 1 :Þ 931 2,950 18. 1 57 2,893 98 c.n T 0 May 0 276 874 15.8 50 824 94 z " June w 288 912 12.0 38 874 96 00 -t >~ July -., '> 282 893 8.3 26 867 97 ï <::) 0 ::E August 198 627 9.0 28 599 95 September 160 507 15.5 49 458 90 October 254 804 18.8 59 745 93 November 123 389 9.3 29 360 93 December 229 725 18.6 58 667 92 Average 270 855 19.3 61 794 93 Sß¡,'\GE TREATMENT PLANT NO.2 Efficiency in Suspended Solids Removal 1977 1977 Flow January February March OJ » V> m 0 0 :z: April May . w OJ, \;r -rt' '~' r- 0 ::e: June July August September October November December Average RAW lb/dav 874 FINAL mall lbjdav mq/l 276 27.2 30.0 209 125 662 396 21.0 18.0 532 172 1,686 545 10.3 5.5 58 92 183 291 6.3 7.5 136 173 431 548 7.8 8.6 118 117 374 370 12.5 181 573 17.3 172 545 14.0 86 95 66 57 32 17 19 23 24 27 39 54 45 REt~OVED lb/dav % 788 632 330 1,629 513 166 272 408 524 . 347 331 519 500 90 95 83 96 94 91 93 95 96 93 89 90 92 ì977 Due to being short of help all this year, we have not been able to do the preventive maintenance on the pump stations and sewer lines. Only 2,000 feet of sewer line was inspected this year with the TV unit. We are five men short at this time. SEWER PUMP STATIONS MAINTENANCE AND IMPROVEMENTS STATION NO.1: Installed new blade and bearing in wet well blower. Put in new circulating pump and motor. Replaced all slip ring brushes. STATION NO.2: Put in new incoming gate valve on No.1 pump. Installed top and bottom bearinçs and seals in No. 1 pu~p, also, resleeved shaft and put on U joint. STATION NO.3: Replaced air line from station to wet well. Installed new bearing and lower seal in No.1 motor. Put in new reset switch for No.1 motor. Replaced all contacts in switches. STATION NO.5: Replaced contact points. Repaired seal on No.1 pump. STATION rw. 8: Installed new sump pump and alternator, wiring from pole to station. Installed new conduit and STATION NO.9: Repaired both mechnical seals and impeller. STATION NO. 12: Converted this station from an electrod type switch to. air com- pressor and mercury tubes. SEWER PUMP STATIONS MAINTENANCE AND IMPROVEMENTS CONTINUED STATION NO. 16: Replaced mechanical seals in both pumps. STATION NO. 17: Put in new auto time switch and 50 amp breaker. meter gauge on recirculating pump. STATION NO. 18: Replaced mechanical seal. STATION NO. 23: Installed new check valve on No.2 pump. STATION NO. 24: Installed new incoming gate valve on No.1 pump. STATION NO. 31: Replaced mechanical seal on No.1 pump. STATION NO. 32: Repaired float and switch on No.1 pump. STATION NO. 33: Installed new sleeves and key ways on both pumps. STATION NO. 35: Rep 1 aced fl ow Replaced volutes, incoming ells and pump stands on both pumps. Replaced Y on outgoing pipe. Replaced insides of No.,' incoming gate valve. 1977 SANITARY SEWER COLLECTION SYSTEM FLUSHING: 1977 TOTAL FOR YEAR Gallons Water Used 646.00n SEWER STOPPAGES: Complaints Received Complaints in City's Line '215 83 Stoppages Found by Routine Checking 46 MANHOLES: Raised 16 Rings Replaced Covers Replaced 6 6 Covers Sealed 71 66 Cleaned MATERIALS USED: Root Killer (lbs) Cement (lbs) 50 2 ,125 Brick 1,341 PW1P STATIONS: Kilowatt-hours Electricity Used Wet Wells Cleaned 1,013,115 57 Trash Removed (cu.ft.) 2 . 153 SANITARY SEWER COLLECTION SYSTEM MYERS HIGH PRESSURE SEWER CLEANER: Feet Cleaned Gallons Water Used Machine Hours Man Hours Annual Cost/Ft. SEWER JET MACHINE: Feet Cleaned' Gallons Water Used Machine Hours Man Hours 13,452 35.000 9.5 66 $0.0295 56.161 156.000 50 402 Annual Cost/Ft. $0.0415 COST $ 35.00 95.00 267.75 $ 397.75 COST $ 156.00 550.00 1,625.25 $ 2,331.25 1977 BUSINESS OFFICE 1977 ACc.OUNTI NG: Accounts Bi 11 ed '\ Cubic Feet Water Metered' /,337,&.;::;:1,012. SA_U'q) ) Reminders Mailed Final Notices Prepared Services Ordered Off for Non Payment Non Payment Services Reconnected Reconnect Fees Paid First Letters Sent Concerning Late Payment Second Letters Sent Requiring Deposits Accounts Turned Over to Credit Bureau Collections Received from Credit Bureau CUSTOMER SERVICE: \, Turn On Orders Turn Off Orders Other Service Orders CHARGES: Water Tax Sanitation Sewer Tap and Front Miscellaneous Fire Hydrants COLLECTIONS: Footage Through Mail Received at Counter Received at Drive Up Window Received from Collection Agencies Number of Accounts Paid at Collection Agencies Revenue from Coil Operated Water Salesman at Fire Station No. I Percentage Revenue Percentage Revenue Percentage Revenue Percentage Revenue ;;4-1'( r-;(:;./'// £:::r7-'~-;:'I-:-, ~:>'}"~ --, L /Ô t'-? /~ $ 179,298 .:.( 245,661-,900 29,542 43007 583 285 23850.00 445 85 1,341.69 390.69 $ $ 5,190 4~375 4,402 $ $ $ $ $ $ $ 1,374,398.53 37,673.17 359,056.70 592,649.53 22,681.38 53,994.73 27,366.24 $ 52% 18% 15% 16% 37,356 259.50 ::: ~- -;-::,7",-,;,., /.l.~;~>'r ,-/', 'j;";;,>::' r,:C!j -~, ~¡í '¡ r',,':' i '- t . SERVICE DEPARTMENT 1977 SERVICE WORK:, On Orders Off Orders Other Service Orders Retaps New Taps Final Notices Delivered Off for Non Payment Non Payment Reconnects Combined Service Work Total Meter Tiles and Lids New Services METER READING: Reading Time (Hours) Readers Count of Accounts Meters Read Meters Not Read for Three Months Meters in Boxes Not Read Dial Cards Left Dial Cards Received 5,055 3,228 4,402 35 379 4,044 564 281 17,955 209 399 6,150 178,993 161,746 1,332 530 16,717 9,983