Annual Report - 1977
'«-« d___<_<"-<-----<---"~<--<-«-«--_..<--,_.~
CITY OF SALINA
WATER AND SEWERAGE DEPARTMENT
ANNUAL
REPORT
1977
-
RON WEBSTER, DIRECTOR OF UTILITIES
CUSTOMER SERVICE AND ACCOUNTING
LaVerne Pauls, Office Manager
WATER TREATMENT AND DISTRIBUTION
Wesley Morris, Superintendent
SEWERAGE COLLECTION AND TREATMENT
George Pauls, Superintendent
_L._<.__.,-_.~-<--_.._<--_. <
.---.-.--...--
. .. <-«--< ._-. <m <
WATER PRODUCTION
YEARLY TOTAL
1977.
MONTHLY AVERAGE
Total Gallons Pumped
Ga 11 ons Wells
2,113,786,000
897,925,000
176,149,000
74,827,000
Gallons River
1,215,861,000
NONE
101,322,000
NONE
Gallons Plant No.2
DEPTH OF WATER IN OBSERVATION WELLS
Well Number March June September
1 40.05 39.50 41.20
2 33.28 33.65 35.23
3 60.30 62.00 63. 15
December
39.40
35.90
63.00
57.5% of the water pumped was from the Smoky Hill River. 42.5% from-15 wells.
The most water pumped in one month was July - 312,085,000 gallons. The.
lease amount was in February 135,384,000 gallons.
Average pumping was 5.8 million gallons per day. Largest day was 13,308,000
gallons on 19 July. Smallest day was 4,570,000 on:January 2,1977.
23,040,000 gallons of water was used to backwash filters. This is 1.08% of
the total water pumped.
CHEMICALS USED IN 1977
CHEMICALS TONS COST
lime-Ca 1 ci ned 3,262.91 $ 64,896.06
Soda Ash 1,134.94 77,403.57
Chlorine 84.00 17,791.20
Alum 221.58 32,382.18
Calgon 12.00 7,536.00
Fluoride 12.00 4,596.00
Nalcolite "607" 2.04 2,384.72
$ 206,989.73
We distilled 530 gallons of water for:
Sewage Plant 275
Sewerage Crew 5
Central Garage 75
Golf Course 5
Water Plant 170
- _..-..~~_._--<--- .... -..-.--..
January 03
January 12
January 18
January 18
January 19
.'
January 20
January 26
January 27
February 10
February 14
February 15
February 15
March 2
March 7
Ma rch 11
March 14
March 22
March 23
"'.- ....
---.-.--.-.---.-.-- .
1977
WATER PLANT
REPAIRS ACCOMPLISHED IN 1977
Ordered circuit breaker for calcine plant, received
. r4arch 17, 1977 and installed it.
Cleaned north lime slaker and painted it.
Replaced broken ring gasket on valve in air compressor
in filter building. Changed oil and installed new
fi 1 ters.
Had babbit ~earing built up on number one high service
pump.
New bearings and pillow blocks for dust' collector.
new No. 862 belts.
Th ree
Cleaned roto-clone and scrubber line.
Installed diaphragm on south lime machine.
scale and rebalanced it.
Clean~d
Had welder weld two scrappers on No.3 basin. They had
come loose and stopped the arms.
Washed roto-clone and cleaned scrubber and scrubber line.
Installed new front plate on west carballo
that fit on plate machined down.
Had all parts
Put new three inch union on roto-clone line above scrubber
tank.
Two new bearings on south lime slaker motor.
Repaired well number sixteen motor.
March 14.
Rei ns talled it
Started filling river basin at 8:30 AM.
at 12:00 PM.
Finished filling
Greased calcine plant.
Replaced the bearings in river pump.
sleeve and put on a new U joint.
Rebuilt the packing
Washed out secondary basin and cleaned diffusers-
Built up No. three and four furnace screws and put on
new bearings. Put two new bearings on No. sjx and
seven screws.
«_.-. '.' <.----,..--..------- --<- ...
Apri 1 4
Apri15
April 19
April 20
May 5
May 17
July 14
August 24
August 31
. September 6
September 7'
«<-«-"---..-".,
--.. ,--.---<-. ---.
1977
WATER PLANT
REPAIRS ACCOMPLISHED IN 1977
Continued
Washed out roto-clone and scrubber.
Cleaned out cage mill Tine and furnace draft lines.
Installed drive belt on No. three basin.
drive chain.
Tightened
Cleaned all gas cocks on calcine plant and cleaned
out scrubber line and water intake line for roto-clone.
Rebuilt piston for sludge pump with ceramic coating.
Received June 13,1977.
Repaired No. one pump. Installed new seals in bear-
ing housing and new bearings on shaft. Built up the
packing sleeves and made new seal slots in bearing
housing. Started puuting it in May 24.
Repaired electric motor on Key Acres valve.
Washed out river basin.
Cleaned out south lime slaker.
Installed two new bearings and new packing sleeves
on No. six pump.
Put two new bearings on No. five pump.
September 13 Pulled out lightning mixer and disassembled. Had a
ceramic coating put on the shaft. Cost: $175.00,
new shaft would cost about $600.00.
September 15 Washed outside sludge tank.
September 19
Installed new bearings and seals in Sutorbilt blower.
September 20 Put new bearings in east outside lightning mixer.
September 24 Started to work on new sludge treatment tank in north,
yard. Started cutting down trees on N.E. corner of plant.
September " 7 Put in two new butterfly val ves and hooked up a new
recirculating line for sludge to No. one basin. Had a
ceramic coating put on the sludge pump piston. Installed
sludge pump piston September 28.
..
September 27 Started up softenin~ basin #1. After completion and
replacement of all new steel, cement column, weirs, weir
pumps, sweeps, etc.
,<---
--~._-<--'-'----<~<-'--- .
"'-"-_.----'._-"'-'
1977
WATER PLANT
REPAIRS ACCOMPLISHED IN 1977
Continued
September 28 Built up the furnace agitator in the calcine plant.
Built up No. seven and eight furnace screws.
October 4
October 5
October 7
October 13
October 24
October 27
October 28
November 16
November 21
December 1
December 6
Decembe r 8
December 12
December 14
December 15
December 15
December 20
December 21
December 28
Took motor off.
north bin, repaired screws.
Installed new diaphragm in north lime slaker.
Put motor back in service.
Washed out secondary basin and cleaned out defussers.
Dr FF~'Sc:!:l
Put new shaft and bearings on river pump,.
New packing sleeve
Put new bearing in No.5 gang screw on top of calcine plant
Put the north lightning mixer back in service. It has all
new bearings and a rebuilt shaft. Repaired the west mixer.
shaft.
Received new river pump which has new bearings and shaft.
New wearing rings.
Changed south calcine plant collecting screw. Repairing
old collecting screw. '
, "-----, :;?
Put new pairchut packing in number three sludge pump.-
Pulled out number five pump motor in main pump house for repairs.
Drained number one basin.
Reported bent lines.
Washed out roto-cone and cleaned out scrubber lines.
Cleaned out b~o chemical arms.
Put new time delay switch in No.7 pump.
Cleaned and greased calcine cyclone.
Put west lightning mixer back in service with new bearings
and a ceramic coating on shaft.
Cut trees and cleaned fence row at South Plant.
Took boiler out of service at South Plant.
basin, feed lines were repaired.
Fill ed No.1
No.5 pump back in service with new windings.
-----","--"
--,~--..~-_...
-_._----~~-<.........- ......... <-.......'" .
1977
WATER MAIN BREAKS IN 1977
DATE SIZE LOCATION TYPE MATERIAL
02-02-77 6" South of 141 Channel Road Ci rcumferenti a 1 Smith Blair Clamp
'0]-10-77 6" 1510 Pueblo Ci rcumferenti a 1 Smith Blair Clamp
Shut off at main
01-10-77 1/211 248 North Penn Blowout Turned over to plumber
Shut off at mai n
01-11- 77 3/4" 220 North Columbia Blowout Turned over to plumber
01-12-77 8" Airbase South of Bldg. Circumferential 2-Smith Blai r C1 amps
No. 448
~
01-16-77 611 2045 le1and Way Circumferential Smith Blair Ç1amp
01-18-77 4" 400 Blk South 4th Circumferential Smith Blair Clamp
01-20-77 411 West Place between Circumferential Smith Blair Clamp
Park and Elm
01-27-77 3/4" 719 Maple Frozen servi ce Lowered Service
I
02-02-77 611 Overhill Rd, Country Circumferential Smith Blair Clamp /
Club Rd.
03-11-77 6" Bldg. #560 Air Base Circumferential Smith Ba1ir Clamp
04-14-77 211 Iron & Marymount Rd Blowout 3-2" Clamps -
Blowout 0
04-27-77 1011 Crawford and Santa Fe 4-90 bends
2-Smith B~air
71 CIP
05-03-77 8" Crawford and Fairdale Broken tapping sleeve 8x8 Tapping Sleeve
06-14-77 6" Albert and Ohio Bell split 21 CIP
2-Smith Balir Sleeves
06- 18- 77 2" 86 W Bld. Air Base Blowout Smith Blair Clamp
07-07-77 8/1 East Crawford Bridge Blown Apart 2-Tie Downs
Golf Course Line
08-05-77 6/1 1011 North 10th Longitudinal Smith Blair Clamp
----., ....
- ,~-----.,
.....___..n__,..,.-..-..,- -"'..
1977
WATER MAIN BREAKS IN 1977
DATE SIZE LOCATION TYPE MATERIAL
08-05-77 4" 640 McAdams Blowout 211 Plug
08-15-77 6" Santa Fe and Prescott Longitudinal 2-Smith Blair Sleeves
08-17-77 3" -Checker Tower, Air Base Blowout Adams Cl amp
08-22-77 6" Edgehilland Seitz Blowout Smith Blair Clamp
08-27-7.7 611 Mission and Lambertson Ci rcumferenti a] Smith Blair Clamp
09-01-77 6" 747 South Ohio Circumferential 1" Tapped Ductile Sleev
10-05-77 6" 2552 North Ninth Circumferential Smith Blair Clamp
" 10-08-77 4" Rush and Clafl in Circumferential Smith Blair Clamp
10-08-77 611 113 North Douglas Circumferential Smith Blair Clamp
10-28- 77' 3/4" 218 North Phillips Blowout Abandon Service
11-21-77 4" 400 South Fourth Circumferential Smith Blair Sleeve
11-25- 77 3/4" 122 North Ohio Broken on street side 3/411 curb stop used
TAP SLEEVE VALVE
DATE SIZE LOCATION
02-25-77 6" X 2" Republic and Osborne
03-15-77 6" X 4" 600 Block East Johnstown
03-16-77 6" X 4" 600 Block East Johnstown
03-24-77 6" X 4" Building No. 606 Air Base
04-04-77 6" X 6" 1900 East Crawford
04-12-77 6" X 6" 1900 East Crawford
04-18-77 8" X 2" Parklane Housing
.-.< ._-_c<c_--~---,_...
DATE
04-19-77
04-27-77
05-27-77
06-06-77
06-21-77
08-08-77
09-:-15-77
...
09-19-77
09-20-77
10-06-77
,10-13-77
"----'----.-
SIZE
8" X 8"
24" X 6"
6" X 2"
411 X 211
6" X 6"
811 X 411
12" X 2"
6" X 6"
6" X 6"
4" X 4"
6" X 6"
---<-'-"-'_<n---
TAP SLEEVE VALVE
LOCATION
Park1ane Housing
. Waterwell Road
544 Uppermi 11
Cloud and Osborne
Broadway and Armory Road
Fairdale and Cra~ford
2100 Block Planet
Fairdale and Country Hills
2108 Country Hills Road
York and Chester
North and Garfield
1977 . .
'...,"-_._~-~--- o<~...~,.._-_...._.,_._-... """'---'-"'"--...
"."-'-""'--'--",---",-- ---..- ",...
WATER DISTRIBUTION MAINTENANCE
Fire Hydrant Maintenance-----------------------------153
Preventive Maintenance on Main Valves----------------238
1" Service Taps Made---------------------------------181
Tower Readings (once a week)-------------------------215
Water Wells Serviced---------------------------------746
Service Calls from Water Plant-----------------------286
Shut Off Water Mains for Plumbers---------------~---- 16
Traced Service Lines--------------------------------- 5
Preventive Maintenance on Check Valves---------------103
Changed Overhead Storage Lights---------------------- 14
Fire Flow Tests-------------------------------------- 16
Painted Bottom of Key Acres Tower-------------------- 2
Flushed All Fire Hydrants in City in Month of April.
Painted and Dressed Well House No. 14.
Replaced 8 X 8 Tapping Sleeve and Valve- Smoky Hill.
Relocated Fire Hydrant No. 2072 on Irene Avenue.
Pumped water from valve pit' at Key Acres Tank located at
Belmont and Magnolia, due to high water.
Updating of Street Map - Water Valves, Linest Fire Hydrants.
Abandon 3" Water Main on Pine Street.
Leaded Cross' on Ohio for Contractors - Smoky Hill and
Earth Excavation.
Installed 360' of 8" C.I.P eleven feet deep Sewer Plant
No.2
Changed over 8" CIP to Well - Gol f Course.
Installed 170' Chain Fence Sewer Plant No.2.
Repaired 6" Sewer Line 500 Block South Ohio.
1977
.«.... - --
1977
WATER DISTRIBUTION MAINTENANCE
Continued
Installed 60' Fence and New Post - Sunset Tower.
Replaced Corporation Blowoff 100 Block South Second.
Cleaned and Cut Culvert YMCA Area.
6" Cut In College and Walnut - South and College
Worked 228 North, Phillips.
4" and 2" valvès replaced at Second and,Pine - Y,ale and Tulane.
Extention on Fire Hydrants - Dewey Street.
_",_n' ---.
""-----""'-
-""""_"'n~""'_'_--"--,_.,,-,,
1977
SEWAGE TREATMENT PLANT NO. I
This plant received an average of 5,431,000 gallons per day. The B.O.D.
averaged 186 mg/l per day and 94% of this was removed, giving a final
effluent of 11.6 mg/l B.O.D.
The suspended solids averaged 228 mg/1 per day, 96% of this was removed,
leaving 8.3 in the final effluent.
Total sludge pumped to digesters was 18,975,620 gallons. An average of
51,988 gallons per day. The volatile solids were reduced by 85% before
the supernatant was returned to the plant.
A total of 1,147,500 gallons of digested sludge was removed from the
digesters. 184,000 gallons was run to drying beds and 963,500 gallons
was hauled to the field. .
IMPROVEMENTS AND REPAIRS PLANT NO. I
New bar screen and rag dump was replaced in the grit chamber. The rest
of the equipment on the grit chamber was sandblasted and painted.
Bearings were replaced in No.1 mixer motor on digester tank No.2.
All three sludge pumps in digester basement had shaft sleeves and pack-
ing gland bolts replaced.
We had some minor problems with the burner on the boiler and two con-
trol valves had to be replaced.
The tubes and plates in the boiler are in good condition. We have not
had leaks or corrosion problems since we started using city water and
adding chemicals in December 1975.
U joints were replaced on No.2 filter pump.
'Bearings and impeller was replaced 'in No.1 secondary sludge pump.
New valve head and bearings were replaced on automatic butterfly vålve.
GENERAL IMPROVEMENTS AND MISCELLANEOUS
Received new LeRoy air compressor.
Received a new 8" centrifugal pump; gasoline driven engine.
was received from Civil Defense.
Thi s pump
,250 persons toured the plant this year. This number includes groups,
from elementary schools, scouts, YMCA, colleges, technical institutes
and churches. '
-----'<--~~~"--'._-~-' - ..'." ,
- ...._-~._. ,
-.... -, -"..«,-- ..... «-- --...
1977 '
GENERAL IMPROVEMENTS AND MISCELLANEOUS
Continued
CERTIFICATION STATUS OF OPERATORS
George Pauls
Arthur Grover
George Wi lson
Ivan Gildersleve
Norman Korbe
Chester Darby
"B"
"A"
"C"
"C"
"8"
"C" .
'.
Mr. Robert Greenall, Environmental Protection Agency, was here July 13
through July 17, checking the B.O.D., C.O.D., S.S. and pH of both sewage
treatment plants effluent. The samples which he ran tests on were split
with us. The same tests were,run in our laboratory and sent to them for
comparison to their analysis and returned to us. Our C.O.D. results
were consistently higher, the others were very close.
'-'--......_'--~_..._---~-----_..,_....--_.. _..."---~---,--,-_.._,_.-...__._-----_..._- ..
'--..,..,....... -..- '..
1977
SEWAGE TREATMENT PLANT NO. I
Efficiency in Suspended Solids Removal
Flow Raw Lbs/day. Final Lbs/day % Re- Lbs/day Aver/lbs
1977 mgd mg/l Received mg/1 Returned duction Removed capita/day
January 4.791 256 10,228 11.3 451 / 96 9,777 .269
February 4.610 237 9,112 15.9 611 93. 8,501 .239
March 4.403 284 10,428 13.1 481 94 9,941 .274
Apri 1 4.762 326 12,947 4.2 166 Q9 12,781 .340
May 5.502 262 12,022 4.0 183 98 11,839 .316
June 5.823 135 6,556 6.4 310 95 6,246 .172
July 6.516 156 8,477 9.7 527 94 7,950 .223
August 7.018 262 15,334 7.1 415 97 14,919 .403
September 6.395 239 12,746 8.2 437 ' 97 12,309 .335
October 5.003 221 9,221 7.0 292 97 8,929 .242
November 4.928; 132 5,425 ,4A 180 97.,..., 5,245 .142
December 194 7,712 6.6 262 97 7,450 .202
Average 5.4 ' 225 10,109 8.1 365 96 9,743, .266
""""'--'-..-..-----...... .. -- .. --<,.'..««....
1917
SEWAGE TREATMENT PLANT NO. I
Efficiency in B.O.D. Removal
Flow Raw Lbs/day Final Lbs/day % Re- Lbs/day Averl1bs
1977 mgd mg/1 Received mg/1 Returned duction Removed cap,ita/da:
January 4.791 272 10,868 19.7 787 . 93 10,081 .286
February 4.610 205 7,881 18.6 715 91 7,166 .207
March 4.403 208 7,637 15.6 572 93 7,065 .200
Apri 1 4.762 240 9,531 12.5 496 95 .9,035 .250
May 5.502 155 7,112 7.0 321 95 6,791 .187
June 5.823 159 7,721 12.4 602 92 7,119 .203
July 6.516 141 7,662 7.7 418 95 7,244 .201
August 7.018 159 9,306 10.0 585 94 8,721 .244
September 6.395 166 8,853 11.4 608 93 8,245 .232
October 5.003 180 7,510 6.3 262 97 7,248 .197
November 4.928 164 6,740 7.1 292 96, 6,448 .I77
December 4.767 241 10,972 15.9 632 93 10,340 .288
Average 5.375 190 8,636 11.9 533 94 8,102 .222
- _.---~---~,_.~-«--". < -«-,-_...,-,._- ,
., """"'-"'----""--,,,
'-"......"--- "...,.---.....-.......
1977
SEWAGE TREATMENT PLANT NO.2
The flow to this plant was estimated at 380,000 gallons per day. The
B.O.D. averaged 289 mg/l per day and 93% of this was removed, giving a
final effluent of 20.4 mg/l B.O.D.
The suspended solids averaged 171 mg/l per day, 92% was removed, leaving
14 mg/l in the final effluent.
An estimated 730,000 gallons of sludge was pumped to the digester.
256,500 gallons of liquid sludge was hauled to fields; 103,000 gallons
run to drying beds.
IMPROVEMENTS AND REPAIRS
Due to low flow to this plant a recirculating line was installed from
the west filter junction box to the manhole in front of the plant.
The 18 inch inlet gate valve to the plant was dug up and repaired and
replaced in good working order.
Bearings and seal was installed in No.1 mixer motor.
Replaced bottom ring and seal in commutator in wet wells.
Office and storage buildings were painted on the outside.
Received bids for installing flow meter at this plant November 27,1977.
Smoky Hill was awarded the contract and will begin work in January 1978.
At this time both sewage treatment plants are meeting the effluent
limitations of our National Pollution Discharge Elimination Sy~tem Permit.
-
1977
SEWAGE TREATMENT PLANT NO.2
Efficiency in B.O.D. Removal
RAW FINAL RB10VED
1977 Flow mg!l 1 b/day mg/l 1 b/ day lb/day %
'«
January 259 820 52.0 164 656 80
February 350 1,109 36.6 116 993 89
March 183 579 18. 1 57 522 90
t:O
Apri 1 :Þ 931 2,950 18. 1 57 2,893 98
c.n
T
0
May 0 276 874 15.8 50 824 94
z
"
June w 288 912 12.0 38 874 96
00 -t
>~
July -., '> 282 893 8.3 26 867 97
ï <::)
0
::E
August 198 627 9.0 28 599 95
September 160 507 15.5 49 458 90
October 254 804 18.8 59 745 93
November 123 389 9.3 29 360 93
December 229 725 18.6 58 667 92
Average
270
855
19.3
61
794
93
Sß¡,'\GE TREATMENT PLANT NO.2
Efficiency in Suspended Solids Removal
1977
1977
Flow
January
February
March
OJ
»
V>
m
0
0
:z:
April
May
.
w
OJ, \;r
-rt' '~'
r-
0
::e:
June
July
August
September
October
November
December
Average
RAW
lb/dav
874
FINAL
mall lbjdav
mq/l
276
27.2
30.0
209
125
662
396
21.0
18.0
532
172
1,686
545
10.3
5.5
58
92
183
291
6.3
7.5
136
173
431
548
7.8
8.6
118
117
374
370
12.5
181
573
17.3
172
545
14.0
86
95
66
57
32
17
19
23
24
27
39
54
45
REt~OVED
lb/dav %
788
632
330
1,629
513
166
272
408
524
. 347
331
519
500
90
95
83
96
94
91
93
95
96
93
89
90
92
ì977
Due to being short of help all this year, we have not been able to
do the preventive maintenance on the pump stations and sewer lines.
Only 2,000 feet of sewer line was inspected this year with the TV unit.
We are five men short at this time.
SEWER PUMP STATIONS
MAINTENANCE AND IMPROVEMENTS
STATION NO.1:
Installed new blade and bearing in wet well blower. Put in new
circulating pump and motor. Replaced all slip ring brushes.
STATION NO.2:
Put in new incoming gate valve on No.1 pump. Installed top and
bottom bearinçs and seals in No. 1 pu~p, also, resleeved shaft
and put on U joint.
STATION NO.3:
Replaced air line from station to wet well. Installed new bearing
and lower seal in No.1 motor. Put in new reset switch for No.1
motor. Replaced all contacts in switches.
STATION NO.5:
Replaced contact points.
Repaired seal on No.1 pump.
STATION rw. 8:
Installed new sump pump and alternator,
wiring from pole to station.
Installed new conduit and
STATION NO.9:
Repaired both mechnical seals and impeller.
STATION NO. 12:
Converted this station from an electrod type switch to. air com-
pressor and mercury tubes.
SEWER PUMP STATIONS
MAINTENANCE AND IMPROVEMENTS
CONTINUED
STATION NO. 16:
Replaced mechanical seals in both pumps.
STATION NO. 17:
Put in new auto time switch and 50 amp breaker.
meter gauge on recirculating pump.
STATION NO. 18:
Replaced mechanical seal.
STATION NO. 23:
Installed new check valve on No.2 pump.
STATION NO. 24:
Installed new incoming gate valve on No.1 pump.
STATION NO. 31:
Replaced mechanical seal on No.1 pump.
STATION NO. 32:
Repaired float and switch on No.1 pump.
STATION NO. 33:
Installed new sleeves and key ways on both pumps.
STATION NO. 35:
Rep 1 aced fl ow
Replaced volutes, incoming ells and pump stands on both pumps.
Replaced Y on outgoing pipe. Replaced insides of No.,'
incoming gate valve.
1977
SANITARY SEWER COLLECTION SYSTEM
FLUSHING:
1977
TOTAL FOR YEAR
Gallons Water Used
646.00n
SEWER STOPPAGES:
Complaints Received
Complaints in City's Line
'215
83
Stoppages Found by Routine Checking
46
MANHOLES:
Raised
16
Rings Replaced
Covers Replaced
6
6
Covers Sealed
71
66
Cleaned
MATERIALS USED:
Root Killer (lbs)
Cement (lbs)
50
2 ,125
Brick
1,341
PW1P STATIONS:
Kilowatt-hours Electricity Used
Wet Wells Cleaned
1,013,115
57
Trash Removed (cu.ft.)
2 . 153
SANITARY SEWER COLLECTION SYSTEM
MYERS HIGH PRESSURE SEWER CLEANER:
Feet Cleaned
Gallons Water Used
Machine Hours
Man Hours
Annual Cost/Ft.
SEWER JET MACHINE:
Feet Cleaned'
Gallons Water Used
Machine Hours
Man Hours
13,452
35.000
9.5
66
$0.0295
56.161
156.000
50
402
Annual Cost/Ft. $0.0415
COST
$ 35.00
95.00
267.75
$ 397.75
COST
$
156.00
550.00
1,625.25
$ 2,331.25
1977
BUSINESS OFFICE
1977
ACc.OUNTI NG:
Accounts Bi 11 ed '\
Cubic Feet Water Metered' /,337,&.;::;:1,012. SA_U'q) )
Reminders Mailed
Final Notices Prepared
Services Ordered Off for Non Payment
Non Payment Services Reconnected
Reconnect Fees Paid
First Letters Sent Concerning Late Payment
Second Letters Sent Requiring Deposits
Accounts Turned Over to Credit Bureau
Collections Received from Credit Bureau
CUSTOMER SERVICE:
\,
Turn On Orders
Turn Off Orders
Other Service Orders
CHARGES:
Water
Tax
Sanitation
Sewer
Tap and Front
Miscellaneous
Fire Hydrants
COLLECTIONS:
Footage
Through Mail
Received at Counter
Received at Drive Up Window
Received from Collection
Agencies
Number of Accounts Paid at Collection Agencies
Revenue from Coil Operated Water Salesman at
Fire Station No. I
Percentage Revenue
Percentage Revenue
Percentage Revenue
Percentage Revenue
;;4-1'( r-;(:;./'// £:::r7-'~-;:'I-:-, ~:>'}"~
--, L
/Ô t'-? /~
$
179,298
.:.(
245,661-,900
29,542
43007
583
285
23850.00
445
85
1,341.69
390.69
$
$
5,190
4~375
4,402
$
$
$
$
$
$
$
1,374,398.53
37,673.17
359,056.70
592,649.53
22,681.38
53,994.73
27,366.24
$
52%
18%
15%
16%
37,356
259.50
::: ~-
-;-::,7",-,;,., /.l.~;~>'r ,-/',
'j;";;,>::' r,:C!j -~, ~¡í
'¡ r',,':' i
'- t
.
SERVICE DEPARTMENT
1977
SERVICE WORK:,
On Orders
Off Orders
Other Service Orders
Retaps
New Taps
Final Notices Delivered
Off for Non Payment
Non Payment Reconnects
Combined Service Work Total
Meter Tiles and Lids
New Services
METER READING:
Reading Time (Hours)
Readers Count of Accounts
Meters Read
Meters Not Read for Three Months
Meters in Boxes Not Read
Dial Cards Left
Dial Cards Received
5,055
3,228
4,402
35
379
4,044
564
281
17,955
209
399
6,150
178,993
161,746
1,332
530
16,717
9,983