CO 2 Lakewood Park Bridge
.... '.
CHANGE ORDER
LOCATION: Riverside Drive and poplar Streets
PROJECT NO.
85 TE-0210-01
PROJECT:
Lakewood Park Bridge
CHANGE ORDER NO.
2
CONTRACTOR
Frank Construction
THIS AGREEMENT, made and entered into this ~
day of ~
2005,
by and between
the
KANSAS,
Owner,
and
above
named
the
CITY OF
SALINA,
Contractor, modifies the existing contract dated
March 21, 2005
under
the
above
subject,
project
project
in
following
and
number
the
particulars to wit:
1.
The specifications and drawings for certain street improvements in the
City of Salina, Kansas, dated April 21, 2005 are hereby amended in
the following particulars only; all other terms and conditions remain
unchanged.
ITEM
DESCRIPTION
31
Substitution of brick truncated domes for cast in place concrete.
32
Installation of 12" CMP with flared end sections at east end of
trail.
33
Installation of erosion control matting at bridge wingwalls.
34
Installation of 4 steel bollards at bridge ends.
2.
The undersigned proposes to furnish all tools, appliances, equipment,
materials, and labor required to complete the construction in a
thorough, workmanlike, and satisfactory manner in accordance with the
drawings, specifications, and contract documents, for the following
prices.
.. '.
~
CHANGE ORDER
PAGE 2
QUANTITY
UNIT
UNIT
PRICE
TOTAL
ITEM NO.
DESCRIPTION
31 ADA Truncated Bricks 1 LS $124.00
32 20 L.F.-12" CMP W/Flared Ends 1 LS $600.00
33 Erosion Control Matting 1 LS $368.00
34 Removable Bollards 4 EA $444.48
TOTAL:
$ 124.00
$ 600.00
$ 368.00
$1,777.90
$2,869.90
3.
Additional time for completion by reason of this change
0
days.
4.
All other terms and conditions of the contract to remain unchanged.
OWNER, FIRST PARTY
CONTRACTOR, SECOND PARTY
THE CITY OF SALINA, KANSAS
BY:
~C~ER
BY, qùõiJ-
J(10.~'.U
(Office or position of signer)
Attest:
~
~~~
¿h L.¿d~
KDOT APPROVAL
F:\Projects\20010905\Const. Obs. Lakewood\Change Orders\CHANGE ORDER NO.2 - 505.doc