Loading...
CO 2 Lakewood Park Bridge .... '. CHANGE ORDER LOCATION: Riverside Drive and poplar Streets PROJECT NO. 85 TE-0210-01 PROJECT: Lakewood Park Bridge CHANGE ORDER NO. 2 CONTRACTOR Frank Construction THIS AGREEMENT, made and entered into this ~ day of ~ 2005, by and between the KANSAS, Owner, and above named the CITY OF SALINA, Contractor, modifies the existing contract dated March 21, 2005 under the above subject, project project in following and number the particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated April 21, 2005 are hereby amended in the following particulars only; all other terms and conditions remain unchanged. ITEM DESCRIPTION 31 Substitution of brick truncated domes for cast in place concrete. 32 Installation of 12" CMP with flared end sections at east end of trail. 33 Installation of erosion control matting at bridge wingwalls. 34 Installation of 4 steel bollards at bridge ends. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. .. '. ~ CHANGE ORDER PAGE 2 QUANTITY UNIT UNIT PRICE TOTAL ITEM NO. DESCRIPTION 31 ADA Truncated Bricks 1 LS $124.00 32 20 L.F.-12" CMP W/Flared Ends 1 LS $600.00 33 Erosion Control Matting 1 LS $368.00 34 Removable Bollards 4 EA $444.48 TOTAL: $ 124.00 $ 600.00 $ 368.00 $1,777.90 $2,869.90 3. Additional time for completion by reason of this change 0 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS BY: ~C~ER BY, qùõiJ- J(10.~'.U (Office or position of signer) Attest: ~ ~~~ ¿h L.¿d~ KDOT APPROVAL F:\Projects\20010905\Const. Obs. Lakewood\Change Orders\CHANGE ORDER NO.2 - 505.doc