CO 2 Mill & Overlay CHANGE ORDER LOCA nON:. South Ninth Street PROJECT NO. 04-1435 PROJECT: South Ninth Street Bituminous Mill and Overlay CHANGE ORDER NO. Two (2) CONTRACTOR: THIS AGREEMENT, made and entered into this Richie Paving, Inc., P.O. Box 277, Manhattan, Kansas 66502 13th day of June 2005 , by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated June 1,2004 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated May, 2004 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. ITEM NO. DESCRIPTION 1. Deduct "Bituminous Mill and Inlay (1 1/2"). This was a quantity under run due to exempting the Crawford Street Intersection from the project. (-) 577 square yards 2. Deduct "Pavement Repair". The quantity of Pavement Repair was under run due to the lack of need at the time of original construction. The plan quantity was simply an estimation of the quantity that would be needed. (-) 50.2 square yards 3. Deduct "Regrade Manholes and Water Values" This quantity was under run due to several of the manholes and water valves that did not need adjusting to final surface grade. (-) 18 each. 5. Add "Traffic Control" Provide traffic control for the patching and base repair efforts. 1 lump sum 6. Add "Mobilization" Remobilize to perform the additional services necessary to repair the subgrade failure areas. 1 lump sum 7. Add "Asphalt Patching and Base Repair" Repair areas where subgrade failure has occurred beneath the newly constructed surface. 225 square yards " , Change Order South Ninth Street Page 2 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL 1. Bituminous Mill and Inlay (1 112") -577 S.Y. $ 5.45 ($ 3,144.65) 2. Pavement Repair - 50.2 S.Y. $ 60.00 ($ 3,012.00) 3. Regrade Manholes and Water Values - 18 E.A. $ 550.00 ($ 9,900.00) 5. Traffic Control 1 L.S. $2,000.00 $ 2,000.00 6. Mobilization 1 L.S. $3,000.00 $ 3,000.00 7. Asphalt Patching and Base Repair 225 S.Y. $ 89.00 $20,025.00 CHANGE ORDER TOTAL: $ 8.968.35 3. The contract time for completion by reason of this change J... weeks. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND P ARTY THE CITY OF SALINA, KANSAS RITCHIE PAVING, INC. ~~d~ MAYOR BY: VILA;: V~~. (Office or position of signer) BY: Attest: ~y~