Loading...
Lakewood Bridge Street Imp ...Þ , . CHANGE ORDER LOCATION: Riverside Drive and Poplar Streets PROJECT NO. 85 TE-0210-01 PROJECT: Lakewood Park Bridge CHANGE ORDER NO. 1 CONTRACTOR Frank Construction THIS AGREEMENT, made and entered into this 10 day of May , 2005, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated March 21, 2005 under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated April 21,2005 are hereby amended in the following particulars only; all other terms and conditions remain unchanged. ITEM DESCRIPTION 17 Addi tional concrete was needed for construction of haunch on both abutments. Required reinforcing steel for construction of haunches. Additional pile length was needed since the required bearing capacity was not reached at the specified depth. 18 20 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. . .O' . ~_.. .. CHANGE ORDER PAGE 2 UNIT ITEM NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL 17 Concrete Grade 30 (AE) 1. 37 CU M 740.00 $1,013 .80 18 Reinforcing Steel-(GR 420) 55.54 KG 2.00 111.08 20 Steel Piles 1. 83 M 120.00 263.52 TOTAL: $1,388.40 3. Additional time for completion by reason of this change 0 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS BY: 41tIT~~ BY, c¡~~ pý1~,~~ (Office or position of signer) Attest: ~~~ CITY CLERK /l1~Æ ENGINEER ~... LE~k7/ KDOT APPROVAL F:\Projects\2001090S\Const. Cbs. Lakewood\TypObsFolder\FORMS\Change Orders\CHANGE ORDER NO.1 - SOS.doc