Loading...
6.3 Pump Station Analysis Agr CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 06/13/2005 TIME 4:00 P.M. AGENDA SECTION NO: 6 ORIGINATING DEPARTMENT: APPROVED FOR DEPARTMENT OF PUBLIC WORKS AGENDA: ITEM NO. Page 1 3 BY: Martha Tasker BY: ITEM: Engineering Agreement with Bucher, Willis & Ratliff Corporation for the development of an Engineering Feasibility Analysis - Wastewater Pump Stations No.6, No.9 and No.1 0, Project No. 05-1539. BACKGROUND: Wastewater pump station No.6 was installed in 1956; No.9 in 1961 and No.1 0 in 1957. These stations are well over 40 years old and have reached the end of their useful life and require rehabilitation or replacement. These stations are all located within existing established residential neighborhoods. The current wastewater pump station replacement design standard includes a wet well with submersible pumps and a valve box with an above grade fiberglass building to house the pump controls. That standard above grade fiberglass building may create site restriction issues and be an eyesore to these particular residential neighborhoods. A location map is attached. The proposed Engineering Feasibility Analysis will evaluate options to rehabilitate and/or replace the identified wastewater pump stations with the majority of the structure below grade. The options include: 1. Rehabilitate or replace the wet well/dry well pump station. 2. Replace with recessed wet well mounted pump station. 3. Replace with submersible station with below grade control room. Pump Station No.9 may also be eliminated and flow transferred to Wastewater Pump No. 49. The most cost effective option which meets the residential neighborhood aesthetic and site restriction requirements will be selected and adopted as the design standard for wastewater pump station upgrades in existing residential neighborhoods. The Engineering Agreement with Bucher, Willis & Ratliff Corporation of Salina, provides the engineering services for this project. The agreement is written in a "cost plus fixed fee" format with an amount not to exceed $16,319.00. The "cost" includes all direct payroll, direct non-payroll and overhead (indirect costs). The "fixed fee" is a lump sum amount, agreed upon during negotiations to cover any non-reimbursable costs, pre-tax profit and readiness to serve. The fixed fee does not change regardless of variations in "cost". The "cost not to exceed" is just that, a total amount that cannot be exceeded without prior approval and a supplemental agreement the City Commission. The attached contract also addresses the scope of work, consultant's responsibilities, city's responsibilities, time schedule and general provisions. FISCAL NOTE: If approved, funds for this Engineering Agreement will be allocated from the 2005 Capital Improvement Program under the category of Water/Wastewater Enhancements. Additional engineering and construction costs may be allocated at a later date based upon the outcome of this process. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 06/13/2005 TIME 4:00 P.M. AGENDA SECTION NO: 6 ORIGINATING DEPARTMENT: APPROVED FOR DEPARTMENT OF PUBLIC WORKS AGENDA: ITEM NO. Page 2 3 BY: Martha Tasker BY: RECOMMENDATION: It is recommended that the City Commission approve the Engineering Agreement with Bucher, Willis & Ratliff Corporation in an amount not to exceed $16,319.00. Cc: Kenzil Lynn, BWR Wastewater Pump Stations City of Salina 2005 Sub-CIP 6/9/2005 WATERNYASTEWATERENHANCEMENTS Estimated YTD/Bid Fund DeptlDiv. Project # Description Cost Cost Difference Notes . - ' . WaterlVV W Water 04-1482 Waterline Replacements WaterlVVW Water Water Tower Painting WaterlVVW Water Water Distribution Enhancements ..~¡iiti:> "c..c'i:!!',':: ,:: TOT.AL WATER SUBTOTAL: WaterlVV.W. Wastewater 04-1465 Pump Station "B" Odor Control WaterlVV.W. Wastewater 04-1432 Sanitary Sewer Improvements N. 3rd Street, MuibE WaterlVV.W. Wastewater 05-1520 Manhole Rehabilitaion WaterlVV.W. Wastewater 05-1539 Replace Lift Station #10 WaterlVV.W. Wastewater 05-1540 Replace Force Main Station #44 WaterlVV.W. Wastewater 05-1539 Replace Lift Station #6 WaterlVV.W. Wastewater 05-1540 Replace Force Main Station #49 WaterlVV.W. Wastewater 05-1540 Replace Force Main Station #34 ~":i"~ ' ,:,:,:',:, .,' ' 1'QTAtiWÂ$J'EWATER SUBTOTAL: WaterlVV.W. EPAIPlant Reserve 05-1541 Replace Digester #3 Heat Exchanger WaterlVV.W. EPAIPlant Reserve 05-1542 Repair Pri. Digester #2 Cover WaterlVV.W. EPAIPlant Reserve 05-1543 Rehav. East Grit Channel & Effluent Box ",. 'øUDOaf: $:a35\OQO EPA SUBTOTAL: TOTAL BUDGET: ESTIMATED COST TOTAL: YTD/BID COST TOTAL: REMAINING BUDGET: $215000 $100,000 $250,000 , ' $_000 $60,000 $100,000 $50,000 $160,000 $100,000 $160,000 $10,000 $60,000 $1QO,OQO $50,000 $130,000 $55,000 $a35\000 $1,520,000 $1,500,000 $426,391 $1,093,609 ($86 037) Carryover from 2004 $301 037 , $0 I $100,000 $0 I $250,000 $3O1,031'i,i $:aO!J.903..i!ii $0 $60,000 Carryover from 2004 $89,444 $10,556 Carryover from 2004 $0 $50,000 $0 $160,000 $0 $100,000 $0 $160,000 $0 $10,000 $0 $60,000 "9,444' cC,c', $$10,558 $35,910 $14,090 $0 $130,000 $0 $55,000 $35,910i $199,090