8.1 Advis Auth Golden Eagle CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE, ~ ].0/20/97 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. AGENDA: 8 Engineering & General Servi:es ITEM NO' l& la ~ c~ BY: Shawn O'Lear BY: ITEM Report on validity and submittal of engineering feasibility report for Petition No. 41 $1, filed by Mr. Dan Meinhardt, requesting certain street, drainage and utility improvements in Golden Eagle Estates (Phase II). BACKGROUND It is prescribed by Kansas State statutes that the City Commission consider this petition for street, drainage and utility improvements and establish sufficiency on the basis that any one of the following three conditions are met: 1. The petition is signed by a majority of the resident owners of record of property liable for assessment under the proposal. 2. The petition is signed by the resident owners of record of more than one half of the area liable for assessment under the proposal. 3. The petition is signed by the owners of record, whether resident or not, of more than one half of the area liable to be assessed under the proposal. In this case, the petition signatures represent 100% of the owners of record of the area liable for assessments. Therefore, the petition clearly meets the statute requirements for sufficiency. The Saline County Treasurer has indicated there are no delinquent taxes or special assessments on any property within the benefit district owned by the petitioners. The engineering feasibility report for these public improvements is attached for your review. The property owners within the benefit district shall be assessed for all of the project costs. The total cost of the improvements is estimated to be $195,061. Each of the sixteen (16) lots will pay their share of the costs on the basis of an equal assessment per lot for street, drainage and utility improvements. The project may be initially financed 80% by the City and 20% by the petitioner, with the 80% to be repaid by the property owners over a 10 year period with the special assessment system. The petitioner would also have the option of submitting a letter of credit for 35% of the project costs and assessing 100% of the project costs to the property owner. RECOMMENDATION It is recommended that the City Commission approve the engineering feasibility report for street, drainage and utility improvements in Golden Eagle Estates (Phase II) and adopt the resolution determining the advisability and authorization for the project. Attachment: Feasibility Report Resolution No: 97-5206 PRELIMINARY ENGINEERING ESTIMATE AND FEASIBILITY REPORT PETITION NO. ~ 15 I PROPOSED STREET AND UTILITY IMPROVEMENTS GOLDEN EAGLE ESTATES ADDITION (PHASE II) TO THE CITY OF SALINA, KANSAS FILE NO. 97-5 OCTOBER - 1997 SHAWN O'LEARY, DIRECTOR OF ENGINEERING & GENERAL SERVICES SCOPE OF WORK The curbing, guttering, grading and paving and drainage of Sherwood Lane from the east line of Lot 4, Block 6, Golden Eagle Estates to the east line of Lot 2, Block 7, Golden Eagle Estates to serve Lots 5 through 9, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1 and 2, Block 7, all in Golden Eagle Estates. The curbing, guttering, grading and paving and drainage of Falconview Drive from the south line of Lot 26, Block 5, Golden Eagle Estates to the north line of Lot 7, Block 6, Golden Eagle Estates to serve Lots 5 through 9, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lots 1 and 2, Block 7, all in Golden Eagle Estates. The installation of a sanitary sewer main to serve Lots 5 through 8, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1, Block 7, all in Golden Eagle Estates. The installation of a water main to serve Lots 5 through 8, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1, Block 7, all in Golden Eagle Estates. BENEFIT DISTRICT Lots 5 through 9, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1 and 2, Block 7, all in Golden Eagle Estates to the City of Salina, Saline County, Kansas. ADOPTION OF ASSESSMENT The assessment with accrued interest to be levied as a special assessment tax upon the property included within the benefit district concurrent with the general property tax and shall be payable in ten (10) equal annual installments. The method of assessment is that 100% of the total cost assessed against the property shall be based upon an equal assessment per lot for street and drainage improvements and water and sanitary sewer improvements without regard to buildings or improvements of the land. -1- APPORTIONMENT OF COST COST CHARGEABLE TO PRIVATE PROPERTY: 100% of the total cost of street and drainage improvements, including grading, pavement, curbs and gutters, storm pipelines, storm inlets and any incidentals thereto to complete the street and drainage systems. 2. 100% of the total cost of water mains, fittings, hydrants, water services, valves, and any incidentals thereto to complete the water system. 3. 100% of the total cost of sanitary sewer pipeline, manholes, service connections and any incidentals thereto to complete the sanitary s'~wer system. COSTS CHARGEABLE TO THE CITY: NONE -2- DISTRIBUTION OF COST PART OF GOLDEN EAGLE ESTATES TO THE CITY OF SALINA, KANSAS PETITION NO. COST COST COST TOTAL CHARGEABLE CHARGEABLE CHARGEABLE PER EACH TO BENEFIT TO CITY LOT DISTRICT TOTAL COST IMPROVEMENTS STREET WATER SYSTEM SANITARY SEWER SYSTEM $ 7,416.94 $118,671.00 $ 2,509.38 $ 40,150.00 $ 2,265.00 $ 36,240.00 $0.00 $0.00 $0.00 $118,671.00 $ 40,150.00 $ 36,240.00 TOTAL: $12,191.32 $195,061.00 $0.00 $195,061.00 -3- PETITION NO. PRELIMINARY ESTIMATE OF GOLDEN EAGLE ESTATES TOTAL PROJECT COSTS (Including Streets and Drainage, Water, and Sanitary Sewer) 1.COMMON EXCAVATION 1,300 C.Y. ~ $ 5.00 = $ 2. ASPHALT OR CONCRETE PAVEMENT 3,505 S.Y. @ 15.00 = 3. VALLEY GUTTER 205 S.Y. @ 30.00 = 4. CONCRETE CURB & GUTTER 2,620 L.F. @ 10.00 = 5. SIDEWALK RAMP 8 EA. ~ 500.00 = 6. C. I. PIPELINE, 6" 890 L.F. @ 16.00 = 7. C. I. FITTINGS 0.40 TON ~ 4,000.00 = 8. FIRE HYDRANT 2 E'fit. ~ 1,700.00 = 9. GATE VALVE, 6" 3 EA. @ 500.00 = 10.WATER SERVICE, 1" 14 EA. ~ 700.00 = 11.SEWER PIPELINE, 8" 880 L.F. @ 18,00 = 12.SEWER PIPELINE, 4" 400 L.F. ~) 8,00 = 13.STANDARD MANHOLE (TYPE I) 2 EA. @ 1.800.00 = 14.SEWER TEES, 8"X4" 14 EA. @ 100.00 = 15.SPECIAL TRENCH COMPACTION 910 L.F. @ 7.00 = 16.WATER 1 L.S. @ 200.00 = 17.CONSTRUCTION STAKING I L.S. ~ 2.000.00 = 6,500.00 52,575.00 6,150.00 26,200.00 4,000.00 14,240.00 1,600.00 3,400.00 1,500.00 9,800.00 15,840.00 3,200.00 3,600.00 1,400.00 6,370.00 200.00 2,000.00 SUB TOTAL: 15% ENGINEERING & CONTINGENCY: TEMPORARY NOTE INTEREST, BONDING, ISSUING: TOTAL: $158,575.00 23,786.00 12,700.00 $195,061.00 -4- PETITION NO. PRELIMiNARY ESTIMATE OF GOLDEN EAGLE ESTATES Preliminary Estimate of PROJECT COSTS (Street and Drainage Improvements only) 1. COMMON EXCAVATION 1,300 C.Y. ~ $ 2. ASPHALT OR CONCRETE PAVEMENT 3,505 S:Y. ~ 3. VALLEY GUTTER 205 S.Y. ~ 4. CONCRETE CURB & GUTTER 2,620 L.F. ~ 5. SIDEWALK RAMP 8 EA. ~ 16.WATER 1 L.S. ~ 17.CONSTRUCTION STAKING I L.S. ~ 5.OO = $ 15.00 = 30.00 = 10.00 = 500.00 = 50.00 = 1,000.00 = 6,500.00 52,575.00 6,150.00 26,200.00 4,000.00 50.00 1,000.00 SUB TOTAL: 15% ENGINEERING & CONTINGENCY: TEMPORARY NOTE INTEREST, BONDING, ISSUING: TOTAL: $ 96,475.00 14,470.00 7,726.00 $118,671.00 -5- PETITION NO. GOLDEN EAGLE ESTATES ADDITION PRELIMINARY ESTIMATE OF PROJECT COSTS (Water System only) 6. C. I. PIPELINE, 6" 890 L.F. ~ $ 16.00 7. C. I. FITTINGS 0.40 TON ~ 4,000.00 8. FIRE HYDRANT 2 EA. ~ 1,700.00 9. GATE VALVE, 6" 3 EA. ~ 500.00 10.WATER SERVICE, 1" 14 EA. ~ 700.00 15.SPECIAL TRENCH COMPACTION' 250 L.F. @ 7.00 16.WATER 1 L.S. ~ 50.00 17.CONSTRUCTION STAKING 1 L.S. ~ 300.00 SUB TOTAL: 15% ENGINEERING & CONTINGENCY: TEMPORARY NOTE INTEREST, BONDING, ISSUING: TOTAL: =$ 14,240.00 1,600.00 3,400.00 1,500.00 9,800.00 1,750.00 50.00 300.00 $ 32,64O.00 4,896.0O 2,614.00 $ 40,15O.0O PRELIMINARY ESTIMATE OF PROJECT COSTS (Sanitary_ Sewer only) 11. SEWER PIPELINE, 8" 12. SEWER PIPELINE, 4" 13. STANDARD MANHOLE (TYPE I) 14. SEWER TEES, 8" X 4" 15. SPECIAL TRENCH COMPACTION 16. WATER 17. CONSTRUCTION STAKING 880 L.F. ~$ 18.00 400 L.F. ~ 8.00 2 EA. ~ 1,800,00 14 EA. ~ 100,00 660 L.F. ~ 7.00 1 L.S. ~ 100.00 1 L.S. @ 700.00 15,840.00 3,200.00 3,600.00 1,4O0.00 4,620.00 I00.00 700.00 SUB TOTAL: 15% ENGINEERING & CONTINGENCY: TEMPORARY NOTE INTEREST, BONDING, ISSUING: TOTAL: $ 29,460.00 4,420.00 2,360.00 $ 36,240.00 -6- PETITION NO. GOLDEN EAGLES ESTATES ADDITION PROPERTY OWNERSHIP., Property. Description Block 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 9 Block 5 Lot 20 Lot 21 Lot 22 Lot 23 Lot 24 Lot 25 Block 6 Lot 5 Lot 6 Lot 7 Block 7 Lot 1 Lot 2 Property Owner Golden Eagle Estates, Inc. Golden Eagle Estates, Inc. Golden Eagle Estates, Inc. Golden Eagle Estates, Inc. -7- GOLDEN EAGLE ESTATES to the City of Salina, Kansas DISTRIBUTION OF COSTS Property Description BLOCK 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 9 BLOCK 5 Lot 20 Lot 21 Lot 22 Lot 23 Lot 24 Lot 25 BLOCK 6 Lot 5 Lot 6 Lot 7 BLOCK 7 Lot 1 Lot 2 Per Each 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Streets Sherwood Lane $3,292106 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.06 $3,292.07 $3,292.07 $3,292.07 $3,292.07 Streets Falconview Drive $4,124.88 $4,124.88 $4,124.88 $4,124.88 $4,124.88 $4,124.88 $4,124.88 $4,124.88 $4,124.87 $4,124.87 $4,124.87 $4,124.87 $4,124.87 $4,124.87 $4,124.87 $4,124.87 Sanitary Sewer $2,265.00 $2;265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 $2,265.00 Water $2,509.38 $2,5O9.38 $2,509.38 $2,509.38 $2,509.38 $2,509.38 $2,509.38 $2,509.38 $2,509.37 $2,5O9.37 $2,509.37 $2,509.37 $2,509.37 $2,509.37 $2,509.37 $2,5O9.37 Total $12,191.32 $12,191.32 $12,191.32 $12,191.32 $12,191.32 $12,191.32 $12,191.32 $12,191.32 $12,191.30 $12,191.30 $12,191.30 $12,191.30 $12,191.31 $12,191.31 $12,191.31 $12,191.31 TOTAL: $52,673.00 $65,998.00 $36,240.00 $40,150.00 $195,061.00 TOTAL BENEFIT DISTRICT m m IO 13 ¸14 13 11 143.8~' lO 141~.7' I 7 IO~,P' 99.93' ~. ~ ~7 I00' 100' lO0' ~ 115' 115' m = 15 13 I00' 84 B5 IL~0.44' , n ~ · · · i 31.99' mLORIANNA CT. ~ ) 87 114.99' 4 S 110-14' ' 451.06' 11451' 31 115.84' 114.98' 64~97' 114.76' 115.08' ESTATES 17 119.98' 80 119.98' AVENUE I I 1~0.03' MAGNOLIA ROAD s I cvr 5 4 I~_ 140.27' 14027' 00 HOT IlRIT£ IN 1NIS SPACE PETIT10N HOHaER FILED ' CITY OF SALIflA, KS TO,',, T.E GOVERHINO eOm~ " CITY CLERK'S OFFICE ~' · City of Salins, Kansas t iA) 11., the uederalgnnd, being owners of record of property liable for asiesmK for the follmdng Ieprovmefltel See attached Exhibit "~" hereby propose that Such tnprovemnt bo Bade in the Banner provided by Article 64, Chapter 12 of the Kansis Stllmtel Rnnotltldm al ammlded. (Bi The estimate or probable east of such iaqlrovmnt ts One Hundred Ninety Five Thousand Sixty One and 00/I00 Dollars. ($ lg5,061.00 (C) The extent of the proposed Improvement dlstrt, to be assessed aa indicated on the attached plat and is described as fOI1OwSl Lots 5 through 91 Block 41 Lots 20 through 25~ Block 5& Lots 5, 6 and 7? Block 6; Lots 1 and 2, Block 77 Golden Ea.qle Estates to the City of Salina~ Saline County~ Kansas. (O) The proposed roached of assesamant III Based on an . equal assessment per lot of land for street and draipaqe, water and sanitary sewer improvements without regaru to ou~la~ngs or improvements of the land. (E) The proposed apportionment of costs between the Ieprove~wnt district and the City-et-large ill One Hundred percent ( 100 ~) to bi iSSOlaOd against the Improvement district and Zero percent (~%) to bm milemmed mgitnst the Clty-l~-lorge. (Fi Ye further propose that 'such lmprov~nt be ~de wl~out ~tice ~nd hearing as requ~r~ by K.S.~. 12-64~(1) II IHnded. * Ho name may be withdrawn from thts petttton liter the Governing Body coammnces consideration * of the petition or tater than seYen (7) days after this petition has been filed with the City Clerk * (K.S.A. 12-6s0~) Respectfully submitted by Dan Meinhardt Telephone Number 825-0985 Dlli &'h Exhibit "A" The curbing, guttering, grading and paving and drainage of Sherwood Lane from the east line of Lot 4, Block 6, Golden Eagle Estates to the east line of Lot 2, Block 7, Golden Eagle Estates to serve Lots 5 through 9, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1 and 2, Block 7, all in Golden Eagle Estates. The curbing, guttering, grading and paving and drainage of Falconview Drive from the south line of Lot 26, Block 5, Golden Eagle Estates to the north line of Lot 7, Block 6, Golden Eagle Estates to serve Lots 5 through 9, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lots 1 and 2, Block 7, all in Golden Eagle Estates. The installation of a sanitary sewer main to serve Lots 5 through 8, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1, Block 7, all in Golden Eagle Estates. The installation of a water main to serve Lots 5 through 8, Block 4; Lots 20 through 25, Block 5; Lots 5, 6 and 7, Block 6; and Lot 1, Block 7, all in Golden Eagle Estates.