Project No. 24005 Certificate of Substantial CompletionPUBLIC WORKS DEPARTMENT Jim Teutsch, Director 300 West Ash, Room 205 Jim.Teutsch@Salina.org P.O. Box 736 Salina, KS 67402-0736 TEL · (785) 309-5725 Jim Kowach, P.E., Operations Manager FAX · (785) 309-5713 Jim.Kowach@Salina.org TDD · (785) 309-5747 www.Salina-KS.gov Engineering ♦ Streets ♦ Traffic Control ♦ Flood Control ♦ Central Garage ♦ Sanitation ♦ Landfill Our Mission is to Build and Maintain a Clean, Safe Community Certificate of Substantial Completion Contractor: Circle C Paving P.O. Box 631 Goddard, Ks 67052 Project: 24005 2024 Chip Seal Date of Issuance: 8/16/2024 Date of Substantial Completion: 8/16/2024 This Certificate of Substantial Completion applies to: All Work under the Contract Documents: The following specified portions of the Work: The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete as of the date designated above. A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. • Striping The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance, and warranties shall be as provided in the Contract Documents except as amended as follows: Owner’s Amended Responsibilities: Contractor’s Amended Responsibilities: The following documents are attached to and made part of this Certificate: This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of Contractor’s obligation to complete the Work in accordance with the Contract Documents. Executed by Inspector Date Executed by Engineering Technician Date Accepted by Contractor Date Accepted by Owner Date