Loading...
8.7 CO1 Eastborough DrainageCITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 4:00 P,M. 9/8/97 AGENDA SECTION: ORIGINATING DEPARTMEi~IT': APPROVED FOR NO, AGENDA: 8 Engineering & Uti3ities ITEM NO. 7 BY: Shawn 0' Leary~ BY: ITEM Change Order No. 1 for the 1997 Storm Drainage Improvements Project No. 97-1001. BACKGROUND This project, as you are aware, involves neighborhood storm drainage improvements at ten (10) different locations throughout the city. The project is substantially complete. At one of the ten locations, South Eastborough Road, a concrete wall was constructed to support an existing storm pipeline in an eroded portion of an existing drainage channel. While under construction, the adjacent property owner, Mr. Stan Lauer, requested that additional erosion control measures be taken along his property. City staff reviewed the request and established that some public benefit (50%) would be gained by construction of an erosion control gabion wall. Mr. Lauer verbally committed to paying the other 50% of costs. The attached Change Order was then negotiated with the contractor, Shears Construction, L.P.. The total amount of the Change Order is $20,920.00. The City's share would be $10,460.00. If approved these costs would be paid from the 1997 Capital Improvement Program which allocated $450,000 for this project and some other drainage projects. If approved, the construction will proceed immediately. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 1 for the 1997 Storm Drainage Improvements, Project No. 97-1001, in the amount of $20,920.00 and direct staff to complete a formal agreement with Mr. Lauer for the cost-sharing arrangement. CHANGE ORDER LOCATION: South Eastborough Road PROJECT: 1997 Storm Drainage Improvements CONTRACTOR: Shears Construction, L.P., P.O. Box PROJECTNO. 97-1001 CHANGE ORDER NO. One (1) 1095, Salina, Kansas 67402-1095 THIS AGREEMENT, made and entered into this 8th day of September ,1997 , by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated May 5, 1997 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated April - 1997, are hereby amended in the following particulars only; all other terms and conditions remain unchanged. ITEM 34 DESCRIPTION Furnish, assemble and install gabion boxes filled with 4"-6" crushed stone to stabilize area of bank along existing drainage channel. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE 34 Gabion wall 1 L.S. $ 20,920.00 CHANGE ORDER TOTAL: TOTAL $ 20,920.00 $ 20,920.00 3. Additional time for completion by reason of this change 20 4. All other terms and conditions of the contract to remain unchanged. days. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS BY: BY: MAYOR/CITY MANAGER Attest: CONTRACTOR, SECOND PARTY SHEARS CONSTRUCTION, L. P. (Office or position of signer) CITY CLERK