Project No. 90039 Certificate of Substantial Completion Certificate of Substantial Completion Date of Issuance: February 6, 2023 Project: 2019 Water Main Replacement Project No. 2 Owner: City of Salina, P.O. Box 736, Salina, KS 67402-0736 Owner's Contract No.: 90039-P2 Contract: KPWSLF Project 2997 Engineer's Project No.: 90039-P2 Contractor: Smoky Hill, LLC Contractor's Address: 645 E. Crawford, #E8 Salina, KS 67401 This Certificate of Substantial Completion applies to: ® All Work under the Contract Documents: ❑The following specified portions of the Work: 1/18/2023 Date of Substantial Completion The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete as of the date designated above. A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance and warranties shall be as provided in the Contract Documents except as amended as follows: ❑Amended Responsibilities ❑X Not Amended Owner's Amended Responsibilities: Revised 1-2-15 SC-1 Contractor's Amended Responsibilities: The following documents are attached to and made part of this Certificate: 90039 Project 2 Punch List This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract Documents. 717414 4. • /- 2- 2a 2V Executed by Engineer Date //PP& /.� -,2 7-z 3 Accepted by Contractor Date /494-44—. ��, /Z --/9- 2&23 Accepted by Owner Date Revised 1-2-15 SC-2