Loading...
5.2 Oakdale Avenue Bridge PaintingAGENDA SECTION NO: ITEM NO: Page 1 CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION 5 I ORIGINATING DEPARTMENT: 2 PUBLIC WORKS DATE TIME 3/27/2023 4:00 P.M. FISCAL APPROVAL: BY: J -P) FINAL APP OVAL: BY: DANIEL R. STACK, P.E. I BY: ITEM: Consider awarding the bid for project number 23004, Oakdale Avenue Bridge Painting to Southern Coatings of Tarpon Springs, LLC in the amount of $119,995.95 with a $5,999.80 (5%) construction contingency for a total project authorization not to exceed $125,995.75 and authorizing the City Manager to execute a contract with Southern Coatings of Tarpon Springs, LLC upon fulfillment of all prerequisites under the bid documents. BACKGROUND: This project includes: sandblasting and capturing the old paint; and repainting the pedestrian railings on the Oakdale Avenue Bridge northeast of Oakdale Park. The Oakdale Avenue Bridge was originally built in 1960 and its driving surface was replaced and the pedestrian rail was repainted in 1992. The bridge is currently in generally good condition and will likely be in service for another 30 to 40 years. The City of Salina has bid two similar projects in recent years. This project's third lowest bidder repainted the pedestrian railings on the bridge on Iron Avenue west of Marymount Road in 2017 at a cost of $70,400. This project's second lowest bidder repainted the pedestrian railings on the bridge on Mulberry Street directly west of Oakdale Park in 2018 at a cost of $82,400. The railings on the Oakdale Avenue Bridge are nearly identical in surface area to the Mulberry Street bridge. Bids were received for this project on Thursday, March 2, 2023 and are as at right. Staff anticipated the higher cost for this year's project due to the inflation rates since 2018. The proprietor of Southern Coatings of Tarpon Springs (SCOTS) worked for another bridge painting company for 19 years before forming his own company in 2017. SCOTS painted one bridge as a subcontractor for Clarkson Construction of Kansas City in 2020; a Clarkson Southern Coatings, Tarpon Springs, FL $119,995.95 Linder Painting, Inc, Lincoln, NE $128,700.00 Thomas Industrial Coatings, Pevel , MO $129,145.00 Royal Bridge, Inc, Palm Harbor, FL $159,765.00 TMI Coatings, Inc., St. Paul, MN $239,300.00 Southern Road & Bridge, LLC, Tar on Springs, FL $298,250.00 -Engineer's Estimate $130,000.00 representative recommended them highly. SCOTS painted four bridges for the Iowa Department of Transportation (IDOT) in 2021; an IDOT representative has known the proprietor for 15 years from these projects and from previous employment and also recommends him highly. FISCAL NOTE: The 2023 Sub-CIP approved by the City Commission on February 6, 2023, included $780,000 for Streets (Stormwater, Bridges, Railroad, Parking Lots), which includes Bridge Painting. If this project is approved as recommended, the remaining budget in this Sub-CIP line item will be $138,589.46, as described in the following table: CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 3/27/2023 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: FISCAL APPROVAL: NO: BY: ITEM PUBLIC WORKS FINAL APPROVAL: NO: Page 2 BY: DANIEL R. STACK, P.E. BY: Gas tax budget (GTI) Pavement Sealing Stormwater Bridges Railroad Parking Lots Remaining $780,000.00 $515,414.79 TBD $125,995.75 TBD TBD $138,589.46 COMMISSION ACTION OR RECOMMENDED ACTION: Staff has identified the following options for the City Commission's consideration: 1.) Approve a motion awarding the bid for project number 23004, Oakdale Avenue Bridge Painting to Southern Coatings of Tarpon Springs, LLC in the amount of $119,995.95 with a $5,999.80 (5%) construction contingency for a total project authorization not to exceed $125,995.75 and authorizing the City Manager to execute a contract with Southern Coatings of Tarpon Springs, LLC upon fulfillment of all prerequisites under the bid documents. 2.) Approve a motion awarding the bid for project number 23004, Oakdale Avenue Bridge Painting to Southern Coatings of Tarpon Springs, LLC with amendments as the City Commission deems appropriate and authorizing the City Manager to execute a contract with Southern Coatings of Tarpon Springs, LLC upon fulfillment of all prerequisites under the bid documents. 3.) Postpone consideration of the award of bid for project number 23004 to a specified date and time and provide staff direction regarding additional information or amendments the City Commission would like to request for its further consideration. 4.) Do not award project number 23004, and provide staff with any further direction. Staff recommends Option #1. Attachments: Location Map 2023 Streets sub-CIP CC: Southern Coatings of Tarpon Springs, LLC Cilyof is salines � -� (-Diamond-Dr Stimmel:Rd j I I � L' `— Otis Ae vr I t r P r- I ; acJi� f��i I- .--------- Y a d _ I 1 "' °u' `" Woodland Ave in North -St -j Project Location � II Qj- nr Elm St a AshSti A '- State l `^• c - a' Country CIub,Rd-I _n Ave " bl Irl h'-D�r J i�> South St v °C fO oCO I I r 3ra I \� N Westchester Dr ` o -LL-,, , � Crawford St - �� o r - o c Crawford•St E c c o \ o LL \ T Republic. _ \ o� __- v,_Beloit.Avej ia s Kirwin_Ave- er —Cc Cloud•St 4 - Ma le- ve -Maple=ve Y `n_Red'FoX"�� _ ' I L / •' -� Q I o Wo j " \ -�Otto-Ave Wayne Ave-, '� 1 cr - - iSa ut Irn`Ave � I •v � I L r I - - - - - -IVlagnoli kd O \ - - a I > m d \ Neal -Ave ro - - Er L p o_c e O 1ackCr =__;Schilling Rd Ln o p I 0 Mcintosh St -'----1, o Wall -St j o I \, o_ o Vortex-AveO A I - o= -Water Well Rd o- ' Water Well Rd 41 \VQr}� li 0 — a 1 inch = 5,000 feet D-9 I ljr V N = N M (fl o O O o O - It 'Ir o o O o O - oi o 0 0 t 0 0 -_ d co 0 0 0 o O co Ln 0 C C 0 C C 00 O O LO — LO r Cl) LO O LO (D O N — N N f� d 69 69 69 Gq 69 69 69 69 O LO LO M — r (O I- I� O LO .- cl - LO d Lf) - O �- O O - LO �- O M O m co c- d O N O CO O a) • LO LO rl O N ti 00 �- N M O O O LO LO — O tl- N O r- 69 69 69 69 Y) U> 64 C - O C >, C C U) j cu Cl) a) C C • N O m Q C C ((f C c0 U U > (tea m d co N N N N N N NN N N N N N N N N N co N N CO N(NCCY)co M O O O O O - O- O O O O O O O O O O O O O - O O - O - O O O O O - O O - O - O C C O O - O O - O - O O O LO r- LO LO O O LO O LO CO M O co L� r- N N O f` LO N 69 69 69 69 69 (fl 69 69 a 06 c O w- O = U)ui � o_ E N M U C Cc (n .L U Y U)N 0 a (o O (o m U @ � p`pJ E ac):�` a) C6 aa))m D L: a C E .0 LL • "O 7 f E 3 N C °' C E °- (n 1 o �_ _0 U) U OL i LU Q —O (0 o (d ?:U U c N � t QCL LL U) a� N N In �. O O • 0 -EM Y U) O fl U m Q (0 O C: U LO Lj- O U C� U C7 � � LL U) U