CO 1 Mill & Overlay
<
CHANGE ORDER
, r
,.
LOCATION: North Ninth Street from Iron Avenue north to Broadway Boulevard
PROJECT NO.
04-1435
PROJECT: Ninth Street Bituminous Mill and Overlay
CHANGE ORDER NO. One (1)
CONTRACTOR:
Ritchie Paving. P.O. Box 277. Manhattan. KS. 66502
TillS AGREEMENT, made and entered into this
26th
day of July
2004
, by
and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing
contract dated
June 28th. 2004
, under the above subject, project and project number in the
following particulars to wit:
1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated
April. 2004 . are hereby amended in the following particulars only; all other terms and conditions remain
unchanged.
ITEM NO.
DESCRIPTION
1.
Add "BITUMINUS MILL AND INLAY (1 Y2" BM-l T) " from Iron Ave north to Broadway
Blvd. to improve surface conditions on North Nmth St., 29,000 S.Y.
Add "Pavement Repair" to correct subsurface conditions on roadway, 50 S.Y.
Add "Regrade Manhole and Water Valve" to adjust lids and rings to new surface cross-section,
30 EA.
Add "Thermoplastic Pavement Markings" to provide permanent roadway pavement markings
on N. Ninth St. from Iron Ave. north to Broadway Blvd., 1 L.S.
Add "Traffic Control" to provide safe and adequate work zones during construction, 1 LS.
2.
3.
4.
5.
l.
2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete
the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings,
specifications, and contract-documents, for the following prices.
I ~
i CHANGE ORDER
"~. PAGE 2
#
..
ITEM NO.
DESCRIPTION
OUANTITY
UNIT
UNIT
PRICE
TOTAL
1. Bit. M. & 0 (1 W' BM-IT) 29,000.00 S.Y. $ 5.45 $158,050.00
2. Pavement Repair 50.00 S.Y. $60.00 $ 3,000.00
3. Regrade Manhole & Water Valve 30.00 E.A. $550.00 $ 16,500.00
4. Thermoplastic Pvm't Markings 1.0 LS. $ 11.975.00 $ 11.975.00
5. Traffic Control 1.0 LS. $ 21.600.00 $ 21.600.00
Total:
$ 211,125.00
3. The contract time for completion by reason of this change
30
days.
4. All other terms and conditions of the contract to remain unchanged.