CO 1 Mill & Overlay < CHANGE ORDER , r ,. LOCATION: North Ninth Street from Iron Avenue north to Broadway Boulevard PROJECT NO. 04-1435 PROJECT: Ninth Street Bituminous Mill and Overlay CHANGE ORDER NO. One (1) CONTRACTOR: Ritchie Paving. P.O. Box 277. Manhattan. KS. 66502 TillS AGREEMENT, made and entered into this 26th day of July 2004 , by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated June 28th. 2004 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated April. 2004 . are hereby amended in the following particulars only; all other terms and conditions remain unchanged. ITEM NO. DESCRIPTION 1. Add "BITUMINUS MILL AND INLAY (1 Y2" BM-l T) " from Iron Ave north to Broadway Blvd. to improve surface conditions on North Nmth St., 29,000 S.Y. Add "Pavement Repair" to correct subsurface conditions on roadway, 50 S.Y. Add "Regrade Manhole and Water Valve" to adjust lids and rings to new surface cross-section, 30 EA. Add "Thermoplastic Pavement Markings" to provide permanent roadway pavement markings on N. Ninth St. from Iron Ave. north to Broadway Blvd., 1 L.S. Add "Traffic Control" to provide safe and adequate work zones during construction, 1 LS. 2. 3. 4. 5. l. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract-documents, for the following prices. I ~ i CHANGE ORDER "~. PAGE 2 # .. ITEM NO. DESCRIPTION OUANTITY UNIT UNIT PRICE TOTAL 1. Bit. M. & 0 (1 W' BM-IT) 29,000.00 S.Y. $ 5.45 $158,050.00 2. Pavement Repair 50.00 S.Y. $60.00 $ 3,000.00 3. Regrade Manhole & Water Valve 30.00 E.A. $550.00 $ 16,500.00 4. Thermoplastic Pvm't Markings 1.0 LS. $ 11.975.00 $ 11.975.00 5. Traffic Control 1.0 LS. $ 21.600.00 $ 21.600.00 Total: $ 211,125.00 3. The contract time for completion by reason of this change 30 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY RITCHIE PAVING THE CITY OF SALINA, KANSAS MAb~ BY: BY: ,4..~ 4" (Office or position <> sIgner) Ait~ 7t if' ; CITY CLERK '¿JéAj