Loading...
2.1a 2021 Annual Solid Waste Management Plan Review and Approval2021 Annual Solid Waste Management Plan Review and Approval INCLUDING A REVIEW OF THE SOLID WASTE MANAGEMENT ISSUES TO BE ADDRESSED DURING THE NEXT 10-YEAR PLAN 1 1. Annual Solid Waste Management Plan (SWMP) review and submittal to KDHE by December 4, 2021 2.Five-year review of the 10-year SWMP in 2022 3.Waste Characterization and Recyclables Composition Study November 14 through 19, 2021 4.Use of the Waste Characterization Study findings to develop goals, targets and a schedule (waste reduction strategy) with solid waste reduction actionable items in Saline County in 2022 5.Discuss the need to bid and construct a new vehicle and equipment building for the Sanitation work group in 2022 6.Discuss the need for dedicated resources for street tree trimming and options to address the needs 7.Describe proposed adjustments to the 2022 landfill disposal fees and sanitation customer monthly fee schedule Introduction and Purpose 2 Purpose of the Saline County Solid Waste Management Committee 1.At least once annually, meet to review and approve the Saline County SWMP 2.Every five years, hold a public hearing to inform the public of the Saline County SWMP (2022) *As part of the annual review of the SWMP, the committee is to develop a schedule for waste reduction/diversion in Saline County 3 Solid Waste Management Planning Cycle Annual Review Changes in the system over past year 5-year Review Goals, strategies, & outcomes Implement new goals & strategies •Staff development and inclusion of plan documents •SWM Committee input •City staff recommendations to City Commission -blue sheet •City Commission approval •Submission to KDHE •KDHE approval •City staff implementation, evaluation and improvement •Annual reviews document minor, short-term changes •5-year reviews encompass entire SWM system 2021 2022 Out Years 4 x 4 yrs. 2017-2026 SWMP System Analysis (Issues, Discussions & Recommendations) 1.Waste collection staffing -City of Salina 2.Employee and public safety 3.Waste disposal/recycling rate 4.Closure of the only residential recycling facility in Salina 5.Current yard waste customer restrictions 6.Insufficient sanitation collection vehicle and equipment storage 7.Illegal dumping, littering and accumulation of waste 8.Landfill emissions rate and landfill gas (LFG) collection 5 2017-2026 SWMP System Analysis 1.Waste collection staffing -City of Salina (Automated Collection) 2.Employee and public safety (Automated Collection) 3.Waste disposal/recycling rate (SDRC) 4.Closure of the only residential recycling facility in Salina (SDRC) 6 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Salina Landfill Average 5.03 4.63 4.83 4.9 4.79 5.1 5.28 5.39 5.40 5.22 5.09 State Average 4.6 4.31 4.23 4.2 4.19 4.28 4.33 4.28 4.33 4.44 4.33 Goal: Less Than State Average 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 More Than State Average 0.43 0.32 0.61 0.69 0.59 0.90 1.00 1.11 1.12 0.94 0.81 NOTE: The Landfill information does not include industrial, construction and demolition, or out-of-county tonnage. State Average 4.6 4.31 4.23 4.2 4.19 4.28 4.33 4.28 4.33 4.44 4.33 Pounds of Waste Disposed Per Person Per Day 4.60 4.31 4.23 4.20 4.19 4.28 4.33 4.28 4.33 4.44 4.33 5.03 4.63 4.83 4.9 4.79 5.1 5.28 5.39 5.40 5.22 5.09 0 1 2 3 4 5 6 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020PoundsPounds per Customer per Day State Average Salina Landfill Average S Public Works Department Per Capita Waste Disposal 7 Note: The per capita waste per person per day reported does include residential, retail, and commercial tonnage. SDRC Trends •From year one (1) to year three (3): 18.25% tonnage increase •77% increase over subscription curbside collection •From year one (1) to year three (3): 22.6% customer increase •27.4% increase over subscription curbside collection AVG = 1,024/wk. 8 2017-2026 SWMP -System Analysis 5.Current yard waste customer restrictions (Eliminated separate yard waste collection in 2018; recommend composting feasibility plan) 6.Insufficient storage for sanitation collection vehicles and equipment (Currently developing concept for new vehicle storage) 7.Illegal dumping, littering and accumulation of waste (Public education campaign with new Environmental Education & Enforcement -E3 Coordinator) 8.Landfill emissions rate and landfill gas collection (Development underway: City commission study session November 22, 2021 to present a long term capital expenditure schedule to include LFG collection capital and operating costs; also includes new cell construction, closure/post-closure costs and major equipment replacement costs) 9 2021 Annual SWM Plan Review Action item for November 15, 2021 City Commission meeting •City Commission has ultimate approval authority regarding SWM committee recommendations •Annual plan review and update involves ratifying the current plan and submission of any addendums which have occurred in the previous calendar year. •This year’s review and recommendations involves submission of four (4) new addendums: •2 addendums involve comprehensive fee rate adjustments •1 addendum involves the purchase of real property in support of recycling efforts in the city •1 addendum involves a recommendation by the SWM committee to add a new goal to the SWM plan •The Commission has the ultimate authority to approve the recommendations, modify the recommendations, or remove recommendations from the annual submission to the KDHE. 10 2021 Annual SWM Plan Review Solid Waste Management Committee Recommendations Addendum 1 and 2: 2021 Comprehensive Fee Schedule •Resolution 20-7853 dated 8/17/2020 establishing 2021 Comprehensive Fee Schedule •Resolution 21-7951 dated 5/10/2021 updating 2021 Comprehensive Fee Schedule to establish pricing for additional sanitation carts Addendum 3: Purchase of the Salina Drive-thru Recycling Center (SDRC) Property •On 7/12/2021, City Commission authorizing the City Manager to sign a contract to purchase the SDRC property Addendum 4: New SWM Committee Goal in the SWMP •The SWM Committee recommended a goal for the SWMP of producing zero (0) waste by 2050 •City Commission has ultimate approval authority regarding SWM committee recommendations *(Addendum 4 could have unintended negative impact on business, industry and economic development efforts) 11 Waste Characterization and Recycling Composition Study 1.Waste Characterization and Recycling Composition Study November 14-19, 2021 2.SCS will complete a comprehensive final report 3.City staff will share final report with KDHE as part of grant 4.KDHE will develop training guidance for municipal solid waste landfills throughout Kansas to demonstrate how to develop data-based conclusions and operational strategies for waste reduction using waste characterization studies 12 Department of Public Works Sanitation & Landfill Divisions 2022-2031 SWMP -System Analysis Staff intends to: •Use the Waste Characterization study findings to develop goals, targets and a schedule (waste reduction strategy) •Develop solid waste reduction actionable/realistic/achievable items for implementation beginning in 2022 13 Building on success … Actionable items for Solid Waste Management in Saline County STRATEGIC WASTE MANAGEMENT DECISION-MAKING 14 Develop a Waste Reduction Strategy for Saline County (2022) Renew SCS three-year landfill engineering consultant contract •2022 $70,500 (Normal annual engineering and reporting requirements) •2023 $167,925 (Includes $100,000 for Cell 21 design and development) •2024 $323,850 (Includes $250,000 for Cell 21 QC/QA inspection, oversight and reporting) •Total $562,005 (Previous three year total was $486,500) Request: Add waste reduction strategy task to the 2022-2024 SCS landfill engineering consultant contract •Estimated Cost $50,000-$100,000 Include composting Feasibility Study (estimated cost to construct and operate) sample cost/benefit calculation •Explore partnering opportunities with the private sector for metal/glass/cardboard 15 2022 Budgetary Summary March 1, 2022 -February 28, 2023 1 Compliance Summary Memo $ 3,500 2 Groundwater Reporting $ 15,000 3 Closure & Post-Closure Costs $ 4,000 4 Annual Air Quality Compliance $ 7,000 5 Title V Renewal $ 7,500 12 Miscellaneous Services $ 15,000 13 Greenhouse Gas Reporting $ 3,500 14 Long-Term Phasing Plan $ 15,000 BUDGET TOTAL (FY 2022) $70,500 *Develop waste reduction Strategies $100,000 $170,000 16 2023 Budgetary Summary March 1, 2023 -February 29, 2024 1 Compliance Summary Memo $ 3,750 2 Groundwater Reporting $ 15,675 3 Closure & Post-Closure Costs $ 4,000 4 Annual Air Quality Compliance $ 6,000 7 Cell 21 Development $ *100,000 9 Landfill Gas Perimeter Monitoring Plan $ 6,000 11 Environnemental Compliance Support $ 5,000 12 Miscellaneous Services $ 10,000 13 Greenhouse Gas Reporting $ 3,500 22 Tank Removal and SPCC Plan update $ 14,000 BUDGET TOTAL (FY 2023) $ 167,925 (*) Reduced design costs due to the previous design work done in the landfill master plan. 17 2024 Budgetary Summary March 1, 2024 -February 28, 2025 1 Compliance Summary Memo $ 4,000 2 Groundwater Reporting $ 16,350 3 Closure & Post-Closure Costs $ 4,000 4 Annual Air Quality Compliance $ 6,000 6 Composting Area Conceptual Design $ 25,000 7 Cell 21 CQA Oversight and Reporting $ 250,000 11 Environnemental Compliance Support $ 5,000 12 Miscellaneous Services $ 10,000 13 Greenhouse Gas Reporting $ 3,500 BUDGET TOTAL (FY 2024) $ 323,850 18 Waste Reduction Strategy and Recyclables Characterization Study Overview Conduct sort of current waste and recyclables Categories selected for historical/future comparisons •See how it has changed •See how changes can be made to meet City goals Summary report•Methodology for data collection •Review/summarize data from sort •Compare to historical waste information 19 Reduce Reuse Recycle Recover Landfill Waste Reduction Strategy Solid Waste Planning Process Overview Step 1 –Collect Data, Determine Baseline and Vision Step 2 –Develop Goals Step 3 –Develop and Evaluate Strategies Step 4 –Develop 5-Year Action Plan 20 Vision Goal Strategy Action Success Data Waste Reduction Strategy Step 1 –Develop Vision, Goals and Baseline 1.Facilitate work session with the solid waste committee to identify specific goals, concerns, and frame of reference •Broaden stakeholder involvement including the City Commission and the general public 2.Develop solid waste vision and plan goals 3.Understand current waste management system and landfill diversion rate 4.Develop baseline using characterization study, other community information, and other sources 5.Gather population data and complete projections for future waste generation 21 Waste Reduction Strategy Step 2 –Develop and Evaluate Strategies 1.Benchmark other communities 2.Assess and evaluate current and future material markets 3.Collaboratively brainstorm and evaluate strategies to align with City’s unique vision, collection system, policies, infrastructure, and outreach 4.Identify new programs, policies, infrastructure, and outreach needed for potential strategy 5.Consider feasibility factors, what is “doable” for City, residents, and businesses? 6.Assess strengths and weaknesses/preliminary implementation considerations for each strategy 7.Develop priority ranking; focus on strategies with the largest impacts 22 Waste Reduction Strategy Step 3 –Develop 5-Year Action Plan 1.Prepare key performance indicators 2.Further refine •Capital Expenditures and O&M Financials •Regulatory Amendments •Equipment and Infrastructure Requirements •Labor Resources •Education and Outreach Needs 3.Evaluate impact of strategies on City’s existing waste management system 4.Develop financial, regulatory, infrastructure, operational, and public education action items for implementing selected strategies One document-easy to understand, implement, and track 23 SWMP Goals 2022-2031-(Potential Goals-subject to committee input and recommendations, consultant review and City Commission approval) Collect Store Divert Dispose Tree Pruning Cell Closure/Post Closure Composting Facility 25-year Capital Plan Truck Storage Old City Dump Remediation E-waste Recycling Illegal Dumping, Littering and Accumulation of Waste LFG Collection City-County Facility Recycling Containers Additional Separation of Recyclables Waste Reduction Strategy SCS and EESI Individual Experience SCS ENGINEERS 50+ Years in Solid Waste •Solid waste planning and studies •Landfill diversion •Site development •Strategic and financial planning •Practice area devoted to Sustainable Materials Management Specializes in helping municipalities and businesses •Develop solid waste goals •Optimize solid waste operations •Maintain environmental compliance EESI 30 Years in Solid Waste •Strategic planning •Operational efficiency •Financial analysis •Stakeholder engagement •Regulatory review •Collection, processing and disposal procurement Managed a solid waste authority 25 SCS and EESI Partnership Experience Collaborated on over 17 solid waste management plans •Kirkwood, MO –helped reduce recycling contamination by 50% •Odessa, TX –reduced collection costs by over $1 million •Olathe, KS –helped city understand capacity and service life of solid waste programs. Used to plan program and facility expansions to assure quality of programs for growing population. Transforming the State of Iowa to sustainable materials management Work collaboratively together with clients 26 Summary •Annual Approval of the SWMP (Commission Meeting 11/15/2021) •Waste Characterization Study results to target areas for waste reduction or reuse •Development of a Waste Reduction Strategy •Utilize the strategy to formulate actionable items within the 10-year SWMP •Target areas for solid waste reduction and develop a schedule •Determine necessary resources to achieve the goals •Develop a long term capital expenditure schedule for the landfill •Dedicate resources to implement 2022 plan for street tree pruning •Install new sanitation truck and equipment storage building in 2022 Questions? 27 November 22, 2021 study session Operational needs for city sanitation services and the long term capital expenditure projections for the Landfill •Tree pruning for safe and efficient refuse collection •Sanitation truck and equipment storage •Long Term Landfill capital expenditures 28