2.1 Study Session PresentationBallfields & Bathrooms Study Session Presentation 9.13.21 Bill Burke Park –P & R Master Plan Items Priority Location Description Est. Cost* Status 40 Bill Burke Park Fix damaged areas of ball field fencing.In Progress 72 Bill Burke Park Install underdrains and re-grade fields 1,2, and 3 to improve drainage.In Progress 73 Bill Burke Park Replace old post and cable at Bill Burke $ 5,000 86 Bill Burke Park Add sidewalk connectivity to new fields. 87 Bill Burke Park ProjField #1 –move outfield fence in (225’ radius)Complete 89 Bill Burke Park Remove temporary ball field storage containers and install more permanent structure.Complete 94 Bill Burke Park Add coach pitch batting cages. 110 Bill Burke Park Resolve vehicular circulation and parking lot safety issues.Complete 126 Bill Burke Park Reconstruct Old Smoky Hill River overlook to meet code. 139 Bill Burke Park Field #8 –add an outfield fence (225’ radius)Complete 144 Bill Burke Park Add four (4) new softball fields $ 1,250,000 151 Bill Burke Park Remove soccer fields and redistribute to soccer complex Complete 165 Bill Burke Park Convert the concession/restroom building into an umpire changing room add new lighting to the three un-lit fields Future Restroom Site Bill Burke Park –P&R Master Plan Information Bill Burke Park –P&R Master Plan Information Why initially focus on Bill Burke Park? Estimated over 400,000 people utilize Bill Burke Park annually. The bulk of the attendance pertains youth baseball & softball: Salina Parks & Recreation youth baseball & softball league has averaged 120 teams per year over the last decade. In 2019, Bill Burke hosted 19 tournaments with 505 tournament teams including the KSHSAA 4A State Softball Tournament. In addition, Bill Burke hosts many community user groups including: KWU Varsity & JV softball, Salina Central Varsity & JV softball and Sacred Heart softball BFRA –P & R Master Plan Items 19 BFRA Replace water diversion system around all fields at ECRA $ 500,000 2022 Budget Request -$80,000 curbing 45 BFRA Upgrade play equipment and surfacing and ensure manufacturer’s recommended safety fall zones are adhered to.$ 90,000 Complete 48 BFRA Increase shade in the park by adding trees and shade structures.$ 5,000 79 BFRA Replace parking lot lighting at ECRA with solar/LED lights and poles $ 100,000 85 BFRA Construct shared-use trails to increase usability.$ 50,000 120 BFRA Upgrade existing picnic shelter and restrooms to include a changing room for players 131 BFRA Renovate James Matson Field $ 300,000 143 BFRA Storage building at ECRA for tractors, vehicles and field maintenance equipment $ 150,000 162 BFRA Upgrade the original concession stand building to accommodate an umpire changing facility with a restroom and shower 163 BFRA Construct dedicated maintenance and locker room facilities. 164 BFRA Add a stadium and two championship fields and other sports complex upgrades in partnership with Baseball Enterprises $ 3,000,000 170 BFRA Upgrade Tower Field 179 BFRA Remove unnecessary expanses of paving. Salina Baseball Enterprises -Proposal Priority Location Decription Est. Cost* Status Immediate Dean Evans Patio Seating Complete Immediate Dean Evans Drainage Repairs Complete Phase I Dean Evans Playing Field Improvements $ 996,500 Complete Phase I Dean Evans Bullpen Modifications $ 17,000 Complete -Lighting Concerns Remain Phase I Dean Evans Dugout Improvements $ 30,000 Complete Phase I Dean Evans Pressbox Renovations $ 13,500 Anticipated Phase I Dean Evans Misc Site & Stadium Improvements $ 34,000 Anticipated Phase I Dean Evans New Restroom & Umpire Dressing Room $ 172,500 Restroom Remodel Anticipated Phase I Dean Evans New Restrooms & Concessions $ 75,000 Restroom Remodel Anticipated Phase I BFRA Matson Field Upgrades $ 117,200 Phase I BFRA Covered Batting Cages -New Premier Stadium $ 30,000 Phase I BFRA Covered Batting Cages -Matson Field Phase I BFRA Covered Batting Cages -Softball Stadiums $ 23,350 South High? Phase I Bill Burke Park Playing Field Improvements -Flds 3-6 Infield Turf $ 406,000 Phase I Bill Burke Park Multiple Restrooms & Concession Stands $ 422,000 Phase I Bill Burke Park Bullpens Phase I Bill Burke Park Misc Improvements & Repairs $ 236,350 Phase II BFRA New Premier Baseball Stadium $ 1,305,850 Phase II BFRA New Premier Softball Stadiums $ 1,087,850 South High? Phase II BFRA Softball Stadiums -Concession / Restroom / Umpire Dressing Rooms South High? Phase II BFRA Softball Stadiums -Covered Batting Cages South High? Phase II BFRA Concessionaire Accomodations $ 17,500 Anticipated Phase III Bill Burke Park New Parking Lot & General Site Improvemetns Phase III BFRA Misc. Field 2 & 3 Upgrades $ 25,000 Phase III BFRA Misc Upgrades -Fields 4 & 5 Strategic Planning Meeting -5.5.21 Integrated Plan -High Priorities City Staff Initial Prioritization of Baseball / Softball Items Yet to be Completed, Scheduled or Funded Source Priority Location Decription Est. Cost* Priority Parks Master Plan 126 Bill Burke Park Reconstruct Old Smoky Hill River overlook to meet code.High SBE 165 Bill Burke Park Multiple Restrooms & Concession Stands $ 422,000 High Parks Master Plan 165 Bill Burke Park Convert the concession/restroom building into an umpire changing room High SBE 40, 86 Bill Burke Park Misc Improvements & Repairs $ 236,350 High SBE Master Plan pgs. 247- 248 Bill Burke Park Playing Field Improvements -Flds 3-6 Infield Turf $ 406,000 High Strategic Planning Meeting -5.5.21 Integrated Plan -Medium Priorities City Staff Prioritization of Baseball / Softball Items Yet to be Completed, Scheduled or Funded Source Priority Location Decription Est. Cost* Priority Parks Master Plan 165 Bill Burke Park Add new lighting to Field 2 Med Parks Master Plan 162 BFRA Upgrade the original concession stand building to accommodate an umpire changing facility with a restroom and shower Med Parks Master Plan 120 BFRA Upgrade existing picnic shelter and restrooms to include a changing room for players Med Parks Master Plan 163 BFRA Construct dedicated maintenance and locker room facilities.Med SBE Phase III BFRA Misc. Field 2 & 3 Upgrades $ 25,000 Med SBE Phase III BFRA Misc Upgrades -Fields 4 & 5 Med Parks Master Plan 131 BFRA Renovate James Matson Field $ 300,000 Med SBE Phase I BFRA Matson Field Upgrades $ 117,200 Med SBE Phase I BFRA Covered Batting Cages -New Premier Stadium $ 30,000 Med Parks Master Plan 143 BFRA Storage building at ECRA for tractors, vehicles and field maintenance equipment $ 150,000 Med Strategic Planning Meeting -5.5.21 Integrated Plan -Low Priorities City Staff Prioritization of Baseball / Softball Items Yet to be Completed, Scheduled or Funded Source Priority Location Decription Est. Cost* Priority Parks Master Plan 73 Bill Burke Park Replace old post and cable at Bill Burke $ 5,000 Low Parks Master Plan 48 BFRA Increase shade in the park by adding trees and shade structures.$ 5,000 Low SBE Phase III Bill Burke Park New Parking Lot & General Site Improvements Low Parks Master Plan 94 Bill Burke Park Add coach pitch batting cages.Low SBE Phase I Bill Burke Park Bullpens Low Parks Master Plan 85 BFRA Construct shared-use trails to increase usability.$ 50,000 Low Parks Master Plan 79 BFRA Replace parking lot lighting at ECRA with solar/LED lights and poles $ 100,000 Low SBE Phase I Dean Evans Concessions $ 75,000 Low Parks Master Plan 170 BFRA Upgrade Tower Field Low Parks Master Plan 164 BFRA Add a stadium and two championship fields and other sports complex upgrades in partnership with Baseball Enterprises $ 3,000,000 Low SBE Phase II BFRA New Premier Baseball Stadium $ 1,305,850 Low Parks Master Plan 144 Bill Burke Park Add four (4) new softball fields $ 1,250,000 Low Parks Master Plan 179 BFRA Remove unnecessary expanses of paving.Low Parks Master Plan 86 Bill Burke Park Add sidewalk connectivity to new fields.Low Identified Funding Sources Transient Guest Tax & Fund Balance Source Type Funds ARPA Cash $1,500,000 Transient Guest Tax Debt Financed $2,500,000 Total $4,000,000 P & R Updated Plan Based on Funding HIGH PRIORITY ESTABLISHED BY CITY COMMISSION Initial Updated Source Priority Location Description Estimated Cost* Renovation Project Estimate Cost Parks Master Plan 126 Bill Burke Park Reconstruct Old Smoky Hill River overlook to meet code.High Not applicable to project NA Parks Master Plan 165 Bill Burke Park Multiple Restrooms & Concession Stands High $ 422,000 Renovate South Restroom $65,228 SBE Phase I Install New North Restroom $152,471 Install New Central Restroom $211,675 Bill Burke Restroom Total $429,374 Parks Master Plan 165 Bill Burke Park Convert the concession/restroom building into an umpire changing room High Renovate Existing Concessions $74,552 Parks Master Plan 40,86 Bill Burke Park Misc. Improvements & Repairs High $ 236,350 Replace/Repair Dugouts $240,000 SBE Phase I Finish replacing existing galvanized backstops, posts, gates & fencing to black coated $285,300 Backstop Padding $16,000 Scoretables $6,400 Seating -Repair/Replace Existing $40,000 Replace Posts Central/South Shelters $45,000 Replace Damaged Yellow Capping $4,400 Repair/add sidewalks $21,600 Install More Trees $18,500 Install Signage, locks, security $2,000 Bill Burke Improvement Total $679,200 Parks Master Plan Master Plan Pgs. 247-248 Bill Burke Park Playing Field Improvements -Flds 3-6 Infield Turf High $ 486,600 Turf -All Infields 1-8 $1,400,000 SBE Phase I Turf Maintenance Equipment $57,000 Turf Field Equipment $16,600 Bill Burke Turf Total $1,473,600 High Priority Items Total $2,656,726 P & R Updated Plan Based on Funding (Con’t) MEDIUM PRIORITY ESTABLISHED BY CITY COMMISSION Initial Updated Source Priority Location Description Estimated Cost* Renovation Project Estimate Cost Parks Master Plan 165 Bill Burke Park Add new lighting to Field 2 Med. Add new Lighting to Field 2 -Only unlighted field remaining at BB; Extra weekly league games; Increased tourn. time slots. $182,400 Parks Master Plan 162 BFRA Upgrade concession stand building to accommodate an umpire changing facility with restroom and shower Med. Renovate BFRA Restrooms between Fields 1 & 2; Matson not included $57,525 Parks Master Plan 120 BFRA Upgrade existing picnic shelter and restrooms to include a changing room for players Med. Renovate BFRA Restrooms between Fields 3 & 4; Matson not included $57,525 Parks Master Plan 163 BFRA Construct dedicated maintenance and locker room facilities.Med.Not included in project at this time N/A Parks Master Plan Pgs.Master Plan 247- 248 BFRA Misc Upgrades -Fields 2 -5 (BFRA Fields #1, #2, #3, #4) Med.Turf Infields: 3 & 4 $450,000 SBE Phase III Scoreboards $24,000 Backstop, Fencing & Gates $110,600 Playground Light $2,900 Misc. Concessions Repairs/Upgrades $6,000 Adjustable Homerun Fencing $5,400 Scoretables $3,200 BFRA Fields 1-4 Total to this Point $899,550 NEWLY IDENTIFIED ITEMS BY STAFF Initial Updated Source Priority Location Description Estimated Cost* Renovation Project Estimate Cost Staff High BFRA Improve BFRA Field Drainage $ 80,000 Install Drainage System $131,000 Playing surface modifications to accommodate drainage $97,000 $228,000 Project Total to This point $3,784,276 Project Contigency $189,214 Estimated $4M Threshold $3,973,490 Bill Burke Games Played 2019 Games Played -Bill Burke 2019 Game Totals Main User Groups: 8U-12U BSB, 8U & Above SB Parks & Recreation League Tournament *High School/College Private/Club Bill Burke Smaller Infields & Homerun Fence 215'-250'Games Games Games Other Total Games BB Field #1 SP&R Youth Games/Practices 60 68 0 0 128 BB Field #2 SP&R Youth Games/Practices 47 66 0 0 113 BB Field #3 SP&R Youth Games/Practices, KWU V & JV 56 90 22 0 168 BB Field #4 SP&R Youth Games/Practices, USD 305, KSHSAA 44 127 10 0 181 BB Field #5 SP&R Youth Games/Practices, USD 305 JV 49 109 10 0 168 BB Field #6 SP&R Youth Games/Practices, Sacred H., KSHSAA 72 140 12 0 224 BB Field #7 SP&R Youth Games/Practices, Sacred Heart JV 58 64 2 0 124 BB Field #8 SP&R Youth Games/Practices, Instructional 52 45 0 0 97 438 709 56 0 1203 *HS/College Teams include: Salina Central V/JV, Sacred Heart V/JV & KWU V/JV Softball Teams. BFRA Games Played 2019 Berkley Family Main User Groups: Adult Softball & 13/14U BSB SP&R Games Tournament HS/College *Private/Club Rec. Area (Intermediate Infields & Homerun Fence 300'Adult Youth Games Games Other Total Games BFRA Field #1 SP&R Adult SB, Youth Overflow Games/Practices 136 6 33 0 0 175 BFRA #2 (275')SP&R Adult SB, Youth Overflow Games/Practices 87 30 31 0 0 148 BFRA Field #3 SP&R Adult SB, 13/14U Baseball Games/Practices 93 32 38 0 2 165 BFRA Field #4 SP&R Adult SB, 13/14U Baseball Games/Practices 75 32 36 0 30 173 391 100 138 0 32 661 *Private includes Church Adult Softball League. Berkley Family Main User Groups: USD, KWU, Semi-Pro SP&R League Tournament *HS/College **Private/Club Rec. Area (Professional Size Infields & Homerun Fencing)Games Games Games Other Total Games Dean Evans High School/College/Semi-Pro Varsity Games 0 42 70 34 146 Matson High School/College Age JV Games 0 33 34 9 76 Wilbur HS/College/Semi-Pro Practices, Youth Overflow 0 8 6 0 14 Tower Field HS/College/Semi-Pro Practices, Youth Overflow 0 8 0 0 8 0 91 110 43 244 *HS/College Teams include: Salina Central V/JV, Salina South V/JV, Sacred Heart V/JV, KWU V/JV and St. John's Baseball teams. **Private/Club/Other Teams include: Legion, Babe Ruth, Salina Stockade and other club baseball teams. Current Bill Burke Bathrooms Future Bill Burke Bathrooms Montrose CXT Unit Identified but Unfunded ITEMS IDENTIFIED BY STAFF SBE Phase I Dean Evans Replace Dean Evans Lights $ 200,000 Repair Dean Evans Lights: Use existing poles, add 2 more, LED, high school/college level lighting $357,000 Staff Identified Items Total $357,000 MEDIUM PRIORITY ESTABLISHED BY CITY COMMISSION Initial Updated Source Priority Location Description Estimated Cost* Renovation Project Estimate Cost Parks Master Plan BFRA Misc Upgrades -Fields 2 -5 (Fields 1 -4) Continued Med $ 25,000 Lighting: Fields 1 & 2 $500,000 SBE Phase III Turf Infields: Fields 1 & 2 $450,000 Bleacher Replacement $40,000 Remaining BFRA Fields 1-4 Total $990,000 Wilbur (Field 5)Med Turf Field $900,000 Lighting $365,000 Wilbur Field Total $1,265,000 Remaining BFRA Fields Total $2,255,000 Parks Master Plan 131 BFRA Renovate James Matson Field Med $ 300,000 Turf Field $900,000 Turf Warning Tracks $0 Lighting $365,000 Dugout Improvements $15,000 Add Fence Bullpens $20,000 Backstop, Fencing & Gates $40,800 James Matson Field Total $1,340,800 SBE Phase I BFRA Matson Field Upgrades Med $ 117,200 Upgrade Scoretable $9,400 Upgrade Bleachers $140,000 Install Shade Structures $112,055 Upgrade Restrooms $59,050 James Matson Upgrade Total $320,505 SBE Phase I BFRA Covered Batting Cages -New Premier Stadium Med $ 30,000 Install Batting Cages $33,000 Parks Master Plan 143 BFRA Storage building at BFRA for tractors, vehicles and equipment Med $ 150,000 Install Maint. & Storage Building $163,000 Medium Priority Items Total $5,011,855 Identified but Unfunded (Continued) LOW PRIORITY ESTABLISHED BY CITY COMMISSION Initial Updated Source Priority Location Description Estimated Cost* Renovation Project Estimate Cost Parks Master Plan 73 Bill Burke Park Replace old post and cable at Bill Burke Low $ 5,000 Replace old post and cable N/A Parks Master Plan 48 BFRA Increase shade in the park by adding trees and shade structures.Low $ 5,000 Install More Trees $18,500 SBE Phase III Bill Burke Park New Parking Lot & General Site Improvements Low Install New Parking Lot $117,000 Install Drop-Off Lane $44,000 $161,000 Parks Master Plan 94 Bill Burke Park Add coach pitch batting cages.Low Install Batting Cages @ Bill Burke $33,000 SBE Phase I Bill Burke Park Bullpens Low Install Bullpens on Every Field $136,000 Parks Master Plan 85 BFRA Construct shared-use trails to increase usability.Low $ 50,000 Not applicable to project NA Parks Master Plan 79 BFRA Replace parking lot lighting at ECRA with solar/LED lights and poles Low $ 100,000 Not included in project at this time N/A SBE Phase I Dean Evans Concessions Low $ 75,000 Addressed in SBE Dean Evans Project with Food Trucks N/A Parks Master Plan 170 BFRA Upgrade Tower Field Low Turf Infield $450,000 Lighting $365,000 Backstop, Fencing & Gates $2,000 Improve Outfield/Infield Surface $6,000 Tower Field Upgrade Total $823,000 Parks Master Plan 164 BFRA Add a stadium and two championship fields and other sports complex upgrades in partnership with Baseball Enterprises Low $ 3,000,000 Not included in project at this time N/A SBE Phase II BFRA New Premier Baseball Stadium Low $ 1,305,850 Not constructing additional fields at this time. N/A Parks Master Plan 144 Bill Burke Park Add four (4) new softball fields Low $ 1,250,000 Not constructing additional fields at this time. N/A Parks Master Plan 179 BFRA Remove unnecessary expanses of paving.Low Not included in project at this time N/A Parks Master Plan 86 Bill Burke Park Add sidewalk connectivity to new fields.Low Repair/add sidewalks $9,600 Low Priority Items Total $1,181,100 City of Salina Bathroom Enhancement Evaluation Revitalization, and Staffing Evaluation of Athletic Fields,Parks, & Downtown Bathrooms About UsCurrent Bathroom Count By Facility Facility Name # of Restroom Units # of Plumbing Fixtures Bill Burke 2 Units 16 Fixtures Centennial Park 1 Unit 8 Fixtures BFRA 4 Units 30 Fixtures Indian Rock Park 1 Unit 4 Fixtures Jerry Ivey Park 2 Units 13 Fixtures Kenwood Park 1 Unit 6 Fixtures Lakewood Park 2 Units 12 Fixtures Soccer Complex 1 Unit 25 Fixtures Oakdale Park 3 Units 18 Fixtures Oxbow Park 1 Unit 4 Fixtures Sunset Park 3 Units 18 Fixtures Thomas Park 1 Unit 5 Fixtures Downtown 3 Units 18 Fixtures Totals 25 Units 177 fixtures Currently, the City of Salina has 25 bathroom units in the Park system that house 50 men’s and women’s facilities and 177 plumbing fixtures within them. *Future additional units include (1) Tennis Center, (1) North Bill Burke Park, (1) Central Bill Burke Park *Possible Bathroom Deletions –(1) Kenwood Park, (1) SE Sunset Park, (1) North Oakdale Park, (0.5) Bill Burke Concessions Custodial Demands of Our Current Facilities Location Sq. Footage Freq/Day Ideal Daily Hours Salina Police Station 29,412 1 10.1 Regional Training Center 9,627 1 3.3 Municipal Court 6,161 1 2.1 Smoky Hill Museum 24,808 1 8.5 Salina Fieldhouse 60,000 1 10.3 Salina Art Center 11,200 1 3.8 Salina Community Theatre 15,088 1 5.2 Friendship Center 7,790 1 2.7 Carver Center 2,704 1 0.9 Salina Muni Golf Course 5,720 1 2.0 Animal Shelter 950 1 0.3 General Services 4,155 1 1.4 Central Garage 800 1 0.5 Kenwood Cove 4,000 When Deep Cleaning Needed Total Sq. Ft.183,415 Total Hours 51 #FTE 6.80 Our Promise To Provide a Clean, Safe, and Sanitary Facility for the Public to Use A recent usage evaluation of the 25 bathroom units in the various City’s Parks, Athletic Fields, and Downtown areas would require 8,096 annual cleanings to provide safe and sanitary facilities for the Public to use. •Bathroom Facilities stretch across 10 square miles . •The average time to clean and stock each units (including travel) would be 1.33 hours each, or 10,787.79 staff hours annually. •It would take 6.59 FT staff positions and 3 mobile cleaning/maintenance vans to fulfill the above mission statement. •Custodial Staff would need to be outfitted with mobile cleaning vans that would transport the materials and equipment needed to complete the needed tasks in the most efficient and effective way, minimizing down time as they cover the 10 square miles between facilities. Mobile Cleaning Unit What gets the Job Done? Mobile Equipment Cost Mop and Bucket $121.75 I-Mop mini auto scrubber $5,834 Shop vac $194.10 Broom and Dust Pan $26.75 Water hose and sprayer $12.40 Squeegee $16.40 Wet floor signs $25.40 Trash Can with wheels $94.60 Towels $30.60 Laundry rack and bags $86.00 Power Inverter $680.00 Step Ladder $112.00 Tool Kit $146.00 Lift Gate $4,200 Electric Power Washer $210.00 Repair Parts $450.00 Extension Cord $46.00 Total $12,286.00 Cleaning staff would be trained and equipped to handle minor repairs to plumbing fixtures and hardware, minimizing facility closures and mitigating costly maintenance call outs Transportation Needs: 4 Vehicles Showing Our Work Where did all the data come from? 26 Park Restrooms Facility Bathroom Count Hours Per Cleaning Annual Cleanings needed Annual Cleaning HRS. Year Round Cleanings Jerry Ivey 1 1.25 365 456.25 Oakdale 1 1.25 365 456.25 Seasonal Cleanings The bathroom units listed below are seasonal and are only open from April to November Centennial 1 1.25 215 268.75 Indian Rock 1 1.25 215 268.75 Jerry Ivey 1 1.25 215 268.75 Kenwood 1 1.25 215 268.75 Oakdale 2 1.25 430 537.50 Lakewood 2 1.25 430 537.50 Oxbow 1 1.25 215 268.75 Sunset 3 1.25 645 806.25 Thomas 1 1.25 215 268.75 Athletic Field & Downtown Restrooms Facility Bathroom Count Hours Per Cleaning Annual Cleanings needed Annual Cleaning HRS. Year Round Cleanings Bill Burke 1 1.25 436 545.00 BFRA 1 1.25 436 545.00 DT Bathrooms 3 1.25 2190 2,737.50 Soccer 1 2.50 365 912.50 Seasonal Cleanings The bathroom units listed below are seasonal and are only open from April to November Bill Burke 1 1.25 286 357.50 BFRA 3 1.25 858 1,072.50 Total Annual Unit Cleanings 8096 Total Annual Cleaning hours 10,576.25 TOTAL WORK LOAD HOURS 10,576.25 Additional Call out service Contingency 211.53 ANNUAL HOUR 10,787.78 FT POSITIONS REQUIRED 6.59 Custodial Seasonality Proposed Cleaning Schedule Status Units Typical Cleaning Frequency Days per Year Hours to Clean Total Hours Proposed Special Event Cleaning Typical Additional Cleaning Frequency Special Event Additional Cleanings Hours to Clean Total Additional Hours Notes Bill Burke #1 Year Around 1 1/day 365 1.25 456.25 BB/SB Tournaments 3/day 108 1.25 135.00 Sat/Sun over 18 weekends Bill Burke #2 Seasonal 1 1/day 215 1.25 268.75 BB/SB Tournaments 3/day 108 1.25 135.00 Sat/Sun over 18 weekends Bill Burke #3 (Proposed Seas.)1 1/day 215 1.25 268.75 BB/SB Tournaments 3/day 108 1.25 135.00 Sat/Sun over 18 weekends Centennial Seasonal 1 1/day 215 1.25 268.75 BFRA #1 Year Around 1 1/day 365 1.25 456.25 BB/SB Tournaments 3/day 72 1.25 90.00 Sat/Sun over 12 weekends BFRA #2 Seasonal 1 1/day 215 1.25 268.75 BB/SB Tournaments 3/day 72 1.25 90.00 Sat/Sun over 12 weekends BFRA #3 Seasonal 1 1/day 215 1.25 268.75 BB/SB Tournaments 3/day 72 1.25 90.00 Sat/Sun over 12 weekends Dean Evans Seasonal 1 1/day 215 1.25 268.75 BB/SB Tournaments 3/day 72 1.25 90.00 Sat/Sun over 12 weekends Indian Rock Seasonal 1 1/day 215 1.25 268.75 Jerry Ivey #1 Year Around 1 1/day 365 1.25 456.25 Jerry Ivey #2 Seasonal 1 1/day 215 1.25 268.75 Kenwood Seasonal 1 1/day 215 1.25 268.75 Lakewood Seasonal 2 1/day 215 1.25 537.50 Soccer Complex Year Around 1 1/day 365 2.50 912.50 Oakdale #1 Year Around 1 1/day 365 1.25 456.25 SHRF/KKOA 3/day 6 1.25 7.50 Fri/Sat/Sun over 2 weekends Oakdale #2 Seasonal 1 1/day 215 1.25 268.75 SHRF/KKOA 3/day 6 1.25 7.50 Fri/Sat/Sun over 2 weekends Oakdale #3 Seasonal 1 1/day 215 1.25 268.75 SHRF/KKOA 3/day 6 1.25 7.50 Fri/Sat/Sun over 2 weekends Oxbow Seasonal 1 1/day 215 1.25 268.75 Sunset Seasonal 3 1/day 215 1.25 806.25 Special Event Total 630 787.5 Thomas Seasonal 1 1/day 215 1.25 268.75 Downtown Year Around 3 2/day 365 2.50 2737.50 Total Hrs. Proposed FTE Year Around Bathroom Proposed 8 5475 Year Around 5475.00 3.344533 Seasonal Bathroom Proposed 18 4837.5 Seasonal 4837.50 2.896707 Total 26 10312.5 Special Event 787.5 0.471557 *Added third proposed Bill Burke Bathroom Total 11100.00 6.780696 Custodial Staffing to Meet Proposed Expectations Maintenance Tech Facilities Maintenance Current Staff Structure S1 Facilities Superintendent A1 Admen Assistant PTS Gr E Maintenance Tech FT Maintenance Tech FT Maintenance Tech FT Custodian 1 FT Custodian PT Custodian 1 FT HVAC Master Tech FT Custodian 1 FT Custodian 1 FT Custodian PT Custodian PT Custodian PT (2022) Custodian FT (2022) Custodian FT Maintenance Tech Facilities Maintenance Proposed Staff Structure S1 Facilities Superintendent A1 Admen Assistant PTS Gr E Maintenance Tech FT Maintenance Tech FT Maintenance Tech FT Custodian 1 FT Custodian PT Custodian 1 FT HVAC Master Tech FT Custodian 1 FT Custodian 1 FT Custodian PT Custodian PT Custodian PT (NEW) Construction Tech FT (NEW) Construction Tech FT Custodian Manager FT (NEW) Custodian 1 FT (NEW) Custodian 1 FT (NEW) Custodian 1 FT (NEW) Custodian 1 FT (NEW) Custodian 1 PT (NEW) Custodian 1 PT (NEW) Custodian 1 PT (NEW) Custodian 1 PT (2022) Custodian FT (2022) Custodian FT *Proposal requires shifting existing Parks and Recreation resources to custodial. Reimagining the function and experience of public spaces by introducing new innovating finishes and standardizing facility hardware and fixtures to streamline cleaning, maintenance and repair. Facility Enhancements Facility Enhancement Features Entry time locks Epoxy floor finish Epoxy wall paint Lighting Roofing Repair/Replacement Trim Repair/Replacement Exterior Paint Interior Paint Exterior Surveillance/Security Cameras Standardized Plumbing Fixtures High Density Polyethylene Partitions High Volume Air Exchanging Exhaust Current Park Bathroom Floors Proposed Park Bathroom Floor Finishes Bathroom Enhancement Budget Per Unit Qnt Design Roofing Ext Finishes Plumbing Electrical HVAC Int. Finishes Door/Hardware Security Labor Total 2 Bill Burke Please refer to expense numbers in baseball presentation. 2 Burke CXT Please refer to expense numbers in baseball presentation. 1 Centennial $1,000.00 $0.00 $8,400.00 $6,200.00 $975.00 $1,685.00 $16,980.00 $4,400.00 $1,285.00 $10,800.00 $51,725.00 4 BFRA $4,000.00 $16,700.00 $2,100.00 $23,250.00 $15,800.00 $6,740.00 $67,920.00 $17,600.00 $5,140.00 $43,200.00 $202,450.00 1 Indian Rock $1,000.00 $0.00 $4,400.00 $3,100.00 $5,400.00 $1,685.00 $16,980.00 $4,400.00 $1,285.00 $10,800.00 $49,050.00 2 Jerry Ivey $2,000.00 $0.00 $9,600.00 $10,075.00 $12,400.00 $3,370.00 $33,960.00 $8,800.00 $2,570.00 $21,600.00 $104,375.00 1 Kenwood $1,000.00 $6,000.00 $3,300.00 $4,650.00 $2,975.00 $1,685.00 $16,980.00 $4,400.00 $1,285.00 $10,800.00 $53,075.00 2 Lakewood $2,000.00 $1,800.00 $12,000.00 $9,300.00 $3,570.00 $3,370.00 $33,960.00 $8,800.00 $2,570.00 $21,600.00 $98,970.00 1 Soccer $1,000.00 $6,875.00 $7,500.00 $1,875.00 $2,400.00 $0.00 $32,225.00 $8,800.00 $1,285.00 $10,800.00 $72,760.00 3 Oakdale $3,000.00 $12,000.00 $16,100.00 $13,950.00 $3,700.00 $5,055.00 $50,940.00 $13,200.00 $3,855.00 $32,400.00 $154,200.00 1 Oxbow $1,000.00 $1,750.00 $2,800.00 $3,100.00 $1,125.00 $1,685.00 $16,980.00 $4,400.00 $1,285.00 $10,800.00 $44,925.00 3 Sunset $3,000.00 $0.00 $4,500.00 $13,950.00 $475.00 $5,055.00 $38,940.00 $13,200.00 $3,855.00 $32,400.00 $115,375.00 1 Thomas $1,000.00 $0.00 $3,500.00 $3,875.00 $1,800.00 $1,685.00 $16,980.00 $4,400.00 $1,285.00 $10,800.00 $45,325.00 3 Downtown $3,000.00 $10,475.00 $27,300.00 $13,950.00 $9,300.00 $5,055.00 $38,940.00 $13,200.00 $3,855.00 $32,400.00 $157,475.00 27 Totals $23,000 $55,600 $101,500 $107,275 $59,920 $37,070 $381,785 $105,600 $29,555 $248,400 $1,149,700 Scope of work Description Design Facility Maintenance currently does not have the tools or software to provide drafted drawing or site plans that are critical for detailing the specific work for each location. If the City would choose to invest in the need resources and dedicate the staff time to complete these tasks it would reduce the Design line item total by approximately 50%. Roofing Several of the restroom structures in our system have either aged or failing roofs. This would be replace or repair the roofs to insure that the City investment is protected from the weather or years to come. Ext Finishes Exterior maintenance on the majority of our restroom structures has not been addressed for 10+ years. Items like Paint, Trim Repair, CMU sealant, Caulking, Power washing, gutters, mortar tuck and pointing, window and screen repair Plumbing Upgrading and Standardizing our plumbing fixtures will not doubt be a healthy investment, but the return will be fresh, functioning fixtures that will standardize the needed materials for tech performed repair straight off the cleaning van. This will re duce facility closures and increase public service. This line item will also cover the expense of jet cleaning the sewer lines from each bathroom. this will increase line flow and minimize sewer blockages. Electrical Many of our restrooms need to be brought up to code and some don't even have the power turned on. Upgrading the exterior lighting, Interior lighting upgrade, GFCI outlets, installing motion switching, Code Upgrades, Security lock power, Exterior motion control lighting, and Service entrance upgrade are some the items that will be improved. HVAC A hand full of our units are heated for year round use and will need equipment replaced. All enclosed restroom units will hav e new high volume air exchange ventilation systems installed to assist with condensation and high humidity issues Int. Finishes A full interior make over that includes stall Portions, Epoxy floor and base, epoxy wall coating on block stall walls, painti ng,mirrors, trash cans, vent covers, paper goods and soap Dispensers, Door/Hardware Consistent door operation will be imperative to ensure that the control access door passage system functions as it should. Do ors, hinges, closures, and jambs will be inspected and replaced as needed. These same systems will be inspected daily by the cleaning staff to ensure proper door operation. Security One of the most difficult challenges with maintaining public facilities, is protecting it from public destruction. The exteri or video monitoring and daily inspections of the City's restroom facilities will help detour and hold accountable vandals that p ublic facilities. Signage of CCTV monitoring will be posted at the facilities to inform the public and discourage vandalism. Labor Self-performing the tasks of the restroom enhancement will allow the City to control schedule, quality of work, and labor cost.