CERTIFICATE OF FULL COMPLETION
The undersigned, ,..14.,S the "Third Party Developer"),
pursuant to that certain Development Agreement dated as o(f j�Mv ' %3 _, 2017, between
the City of Salina, Kansas (the "City") and Salina2020, Inc. (the "Master Developer") and
that certain Transferee Agreement dated as of Mergi*e ii `, 201$, between the City and
Third Party Developer and the Master Developer (collectively the "Agreement"), hereby
certifies to the City as follows:
1. That as of Sem-. (j , 202a the construction, renovation, repairing,
equipping and constructing of the Project Component which Third Party Developer is obligated
to complete pursuant to the terns of the Agreement (the "Transferee Project") has been
substantially completed in accordance with the Agreement.
2. The Transferee Project has been completed in a workmanlike manner and in
accordance with the Construction Plans (as those terms are defined in the Agreement).
3. Lien waivers for applicable portions of the Transferee Project have been obtained,
or, to the extent that a good faith dispute exists with respect to the payment of any construction
cost with respect to the Transferee Project, lien waivers for such portions of the Transferee
Project will be obtained upon resolution of such dispute.
4. This Certificate of Full Completion is accompanied by (a) the project architect's
certificate of substantial completion on AIA Form G-704 (or the substantial equivalent thereof),
a copy of which is attached hereto as Appendix A and by this reference incorporated herein,
certifying that the Transferee Project has been substantially completed in accordance with the
Agreement; and (b) a copy of the certificate(s) of occupancy or temporary certificate of
occupancy issued by the City building official with respect to each building to be constructed
within the Transferee Project, a copy of which is attached hereto as Appendix B and by this
reference incorporated herein.
5. This Certificate of Full. Completion is being issued by the Third Party Developer
to the City in accordance with the Agreement to evidence the Third Party Developer's
satisfaction of all obligations and covenants with respect to the Transferee Project.
514%748.14
I
6. The Third Party Developer is not in default or breach of any term or condition of
the Agreement, and no event of default has occurred and no condition exists which constitutes a
default under the Agreement.
7. All of the Third Party Developer's representations set forth in the Agreement
remain true and correct as of the date hereof.
This Certificate is given without prejudice to any rights against third parties which exist
as of the date hereof or which may subsequently come into being.
Terms not otherwise defined herein shall have the meaning ascribed to such terms in the
Agreement.
IN WITNESS WHEREOF, the undersigned has hereunto set his/her hand this !_ft day
of N,J,i1.505.t._ ,2020
THIRD PARTY DEVELOPER:
1)40-4 G"13
a
0;
By: .
Name: 144001
w .r
Title: t
ACCEPTED:
CITY OF SALINA, KANSAS
By. /1
Name:/`l r( 1{ £P j). el f fwd r
Title: t./77 / 4 -7
51496?48.14
Appendix A to Certificate of Full Completion-AIA Form G-704
!To Be Supplemented Upon Completion of Applicable Project Component]
S1496748.14
Appendix 8 to Certificate of Full Completion—Certificate(s)of Occupancy
JTo Be Supplemented Upon Completion of Applicable Project Component)
51496741.14
AIA Document G704 - 2017
Certificate of Substantial Completion
PROJECT: Barolo Grille CONTRACT INFORMATION: CERTIFICATE INFORMATION:
112 S.Santa Fe Contract For: Barolo Grille Certificate Number: 4298
Sauna,K5 67401 Date: 8/12/2018 Date: 10/16/2007
OWNER:JKSK,Corp ARCHITECT: SPT Architecture CONTRACTOR: JC Builders Inc
1125.Santa Fe 121 N.Mead x201 P.O.Box 3173
Salina,KS 67401 Wichita,KS Salina,KS 67402
The Work identified below has been reviewed and found,to the Contractor's best knowledge,information,and belief,to be
substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion
is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its
intended use. The date of Substantial Completion of the Project or portion designated below is the date established by this
Certificate.
(Identify the Work or portion thereof that is substantially complete)
SPT Architecture Not Applicable Not Applicable September 11,2020
ARCHITECT(Finn Nome) SIGNATURE PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION
WARRANTIES
The date of Substantial Completion of the.Project or portion designated above is also the date of commencement of applicable
warranties required by the Contract Documents,except as stated below:
(Identify warranties that do not commence on the date o%Substantial Completion.if any,and indicate their date of
commencement)
WORK TO BE COMPLETED OR CORRECTED
A list of items to be completed or corrected is attached hereto,or transmitted as agreed upon by the parties,and identified as
follows:
(Identify the list of Work to be completed or corrected) None
The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in
accordance with the Contract Documents. Unless otherwise agreed to in writing,the date of commencement of warranties for
items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment,
whichever occurs first The Contractor will complete or correct the Work on the list of items attached hereto within-0- days
from the above date of Substantial completion.
Cost estimate of Work to be completed or corrected: S -0-
The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work,insurance,
and other items identified below shall be as follows:
(Note:Owner's and Contractor's legal and insurance counsel should review insurance requirements and coverage.)
The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion:
IC Builders,Inc. Cr& i erg 11/12/2020
CONTRACTOR(Firm Name) TIJRE PRINTEDNAME AND TITLE DATE
JKSK,LIC ./ la COI/ 064.1 11/12/2020
OWNER(Firm Name) •- :,` PRINTED NAME AND TITLE DATE
ii
1
r'f;r*.‘=,/*,‘=•/*z-.PA,.‘-. A,o.......A....._A....w...A......A..-A z...P.A..._.A.-A...,......:A z..V4 1,z.:yr*
%,* ) 0
t:Pi
e,' 1
/ o •IIc% 6.0 = `yi.// . �,
$P) - - i 0.
.2 g, Ni*e•P) '
.).. 1..z. . -,, i CI a> to / I
e•NP 4:,-:). 1.5 .t
•V. 8 t a <V w .c73 7.k j 4$
fl
/♦t' m O � `
1/1) c ea z E •$ 1•— :1'.�♦Cm C N N 1. vn Q �♦
- )
t li \ i
r".1
N)C♦/♦ 0.- ac d m �N
N ca . Qa ♦' cdyI
4. g
- m5 m m m N . 0 � m
ca
Lc ) le • 'E 0 ♦♦�
`�• c . _ .f, e,))
/♦
•M V E0. o W o 8 N E •\i•
elC � 1a U_ cm e.,
g:'5 139 ccl.e 't 1 ki (0p) ,
.v. ....c, . =.c 8 *a •I/
L 23 -
NCV
v a 0 C C �•♦'
W J a, 8 m a ��
•L o 113 0 3 c >>
$P) 8 la X' ,- .., co zo 5 , k
li"I if ep '
i Pi iii 'ai t i: -I ;-I g n
sly E gzdLLcg LtIJ
• Zc c E. •o VI♦l In u n o. o0 C N •C > is Espm /0
°`.: t � O o aO nH'♦• F-=C/3 `'<* •6:0
t% �/ �/• �/ �/ ,./.&_./.�/z.-_•••%\v•�/ �/ �/fit/moi`/z�/ � •,