Loading...
7.2 Infrastructure Schilling Rd CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 5/17/04 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEPUTY CITY MANAGER ITEM NO. 2 BY: Michael W. Morgan BY: ITEM: Update on storm drainage and sanitary sewer infrastructure plans for the area between Schilling and Waterwell Roads, west of Ohio Street and east of the railroad tracks. BACKGROUND: The City Commission had previously approved a master drainage and utility plan for this area. The plan outlined a capital improvement project to construct a major storm drainage channel running north and south between Schilling and Waterwell Roads, as well as sanitary sewer moving. The first necessary step was to set aside the required public easements and right-of-way. An important portion of that task was accomplished with the annexation and platting of the Liberty Addition. The annexation agreement for the SEDC property is the second important piece. Staff is currently in positive discussions with the other property owners in the area, and will have updates on those discussions at a later date when they are further along. Both the drainage and sanitary sewer projects would ideally be scheduled for construction in late 2004, to enable further private development to proceed beginning 2005. FISCAL NOTE: None at this time. Financing plans are underway. All city costs of drainage and sanitary sewer infrastucture improvements are scheduled to be recovered through established drainage impact fees and special assessments. ACTION: Authorize staff to continue plans and work towards scheduling storm drainage and sanitary sewer infrastructure projects. (Action items would be brought back to the City Commission as available, e.g. property owner agreements, engineering design contracts, etc.) Enclosures (aerial photo)