Loading...
Raw Water Supply PresentationЉЊΏağƩΏЊБ ЉЊΏağƩΏЊА ЉЊΏağƩΏЊЏ ЉЊΏağƩΏЊЎ ЉЊΏağƩΏЊЍ ЉЊΏağƩΏЊЌ ЉЊΏağƩΏЊЋ ЉЊΏağƩΏЊЊ ЉЊΏağƩΏЊЉ ЉЊΏağƩΏЉВ ЉЊΏağƩΏЉБ ЉЊΏağƩΏЉА ЉЊΏağƩΏЉЏ ЉЊΏağƩΏЉЎ ЉЊΏağƩΏЉЍ ЉЊΏağƩΏЉЌ ЉЊΏağƩΏЉЋ ЉЊΏağƩΏЉЊ ЉЊΏağƩΏЉЉ ЉЊΏağƩΏВВ ЉЊΏağƩΏВБ ЉЊΏağƩΏВА ЉЊΏağƩΏВЏ ЉЊΏağƩΏВЎ ЉЊΏağƩΏВЍ ЉЊΏağƩΏВЌ ЉЊΏağƩΏВЋ ЉЊΏağƩΏВЊ ЉЊΏağƩΏВЉ ЉЊΏağƩΏБВ ЉЊΏağƩΏББ ЉЊΏağƩΏБА ЉЊΏağƩΏБЏ ЉЊΏağƩΏБЎ ЉЊΏağƩΏБЍ ЉЊΏağƩΏБЌ ЉЊΏağƩΏБЋ ЉЊΏağƩΏБЊ ЉЊΏağƩΏБЉ ЉЊΏağƩΏАВ ЉЊΏağƩΏАБ ЉЊΏağƩΏАА ЉЊΏağƩΏАЏ ЉЊΏağƩΏАЎ ЉЊΏağƩΏАЍ ЉЊΏağƩΏАЌ ЉЊΏağƩΏАЋ ЉЊΏağƩΏАЊ ЉЊΏağƩΏАЉ ЉЊΏağƩΏЏВ ЉЊΏağƩΏЏБ Scope of Raw Water Supply Study (continued) Water Demand Projections Through Year 2060 Population Raw Water Supply Study Demand Projections Water Demand (MGD) Includes vested water right, appropriated cert. 7635 Vested water right Each well has limits on annual quantity and max Appropriated cert. 3043 dated October 16, 1954 dated October 30, 1957, appropriated cert. 31,363 dated April 11, 1978.diversion rate Flow (MGD) Flow (MGD) 8.4 MGD Annual Water Use (ac-ft) Natural Breakpoint Total # Passing Criteria breakpoint) (above natural Cost Effective Demands Expandable for Future Implementation Risk Minimizes during Drought Periods Increases Reliability Resources Optimizes Existing Supply/Demand (MGD) Supply/Demand (AC-FT) Calculation of Downtown Well Field Capacity 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 Million Gallons 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 Feet) 4,660 (Acre $2.5 Million Year 2060 - Total Cost : Kanopolis Lake Municipal Water Conservation Plan Goal 2013 Season Season Access Storage at August)September) IrrigationSummer - Based on 121 gpd/c One(JuneOne(May 2 MGD Reduction Ft)-Annual Water Use (Ac Water Demand MGD