Raw Water Supply PresentationЉЊΏağƩΏЊБ
ЉЊΏağƩΏЊА
ЉЊΏağƩΏЊЏ
ЉЊΏağƩΏЊЎ
ЉЊΏağƩΏЊЍ
ЉЊΏağƩΏЊЌ
ЉЊΏağƩΏЊЋ
ЉЊΏağƩΏЊЊ
ЉЊΏağƩΏЊЉ
ЉЊΏağƩΏЉВ
ЉЊΏağƩΏЉБ
ЉЊΏağƩΏЉА
ЉЊΏağƩΏЉЏ
ЉЊΏağƩΏЉЎ
ЉЊΏağƩΏЉЍ
ЉЊΏağƩΏЉЌ
ЉЊΏağƩΏЉЋ
ЉЊΏağƩΏЉЊ
ЉЊΏağƩΏЉЉ
ЉЊΏağƩΏВВ
ЉЊΏağƩΏВБ
ЉЊΏağƩΏВА
ЉЊΏağƩΏВЏ
ЉЊΏağƩΏВЎ
ЉЊΏağƩΏВЍ
ЉЊΏağƩΏВЌ
ЉЊΏağƩΏВЋ
ЉЊΏağƩΏВЊ
ЉЊΏağƩΏВЉ
ЉЊΏağƩΏБВ
ЉЊΏağƩΏББ
ЉЊΏağƩΏБА
ЉЊΏağƩΏБЏ
ЉЊΏağƩΏБЎ
ЉЊΏağƩΏБЍ
ЉЊΏağƩΏБЌ
ЉЊΏağƩΏБЋ
ЉЊΏağƩΏБЊ
ЉЊΏağƩΏБЉ
ЉЊΏağƩΏАВ
ЉЊΏağƩΏАБ
ЉЊΏağƩΏАА
ЉЊΏağƩΏАЏ
ЉЊΏağƩΏАЎ
ЉЊΏağƩΏАЍ
ЉЊΏağƩΏАЌ
ЉЊΏağƩΏАЋ
ЉЊΏağƩΏАЊ
ЉЊΏağƩΏАЉ
ЉЊΏağƩΏЏВ
ЉЊΏağƩΏЏБ
Scope of Raw Water Supply Study (continued)
Water Demand Projections Through Year 2060
Population
Raw Water Supply Study
Demand Projections
Water Demand (MGD)
Includes vested water right, appropriated cert. 7635 Vested water right
Each well has limits on annual quantity and max
Appropriated cert. 3043 dated October 16, 1954
dated October 30, 1957, appropriated cert. 31,363 dated April 11, 1978.diversion rate
Flow (MGD)
Flow (MGD)
8.4 MGD
Annual Water Use (ac-ft)
Natural Breakpoint
Total # Passing Criteria
breakpoint)
(above natural
Cost Effective
Demands
Expandable for Future
Implementation Risk
Minimizes
during Drought Periods
Increases Reliability
Resources
Optimizes Existing
Supply/Demand (MGD)
Supply/Demand (AC-FT)
Calculation of Downtown Well Field Capacity
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
Million Gallons
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
Feet)
4,660
(Acre
$2.5 Million
Year 2060
-
Total Cost :
Kanopolis Lake
Municipal Water Conservation Plan Goal
2013
Season
Season
Access Storage at
August)September)
IrrigationSummer
-
Based on 121 gpd/c
One(JuneOne(May
2 MGD Reduction
Ft)-Annual Water Use (Ac
Water Demand MGD