Loading...
8.5 2004 Drainage Improvements CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/26/04 TIME 4:00P.M. AGENDA SECTION NO: 8 ORIGINATING DEPARTMENT: Department of Pu bl ic Works APPROVED FOR AGENDA: ITEM NO. Page 1 5 BY: Brad Johnson BY: ITEM: Award of contract for the 2004 Drainage Improvements, Huntington Road Ditch, Project No. 03- 1 394. BACKGROUND: The 2004 Sub-CIP Program includes a variety of flood and drainage improvements. These improvements include drainage studies, storm pipelines, drainage structures, regrading and ditch liners. This project will install an 8' wide concrete ditch liner in the Huntington Road Ditch from Magnolia Road north to Wayne Avenue. This ditch has been extremely challenging to maintain and mow due to the lack of slope in the channel. This liner will allow easy access to equipment for maintenance activities. Bids were received for this project on April 13, 2004 as follows: Bidder Bid Amount Schedule Wilbur Construction Co. $ 66,707.05 May 3, 2004-September 29,2004 Smoky Hill, L. L.C. $ 112,816.70 August 1, 2004-September 29, 2004 Pavers, Inc. $ 116,292.00 October 15, 2004-May 2, 2005 Engineers Estimate $ 114,915.00 FISCAL NOTE: The Capital Improvement Program allocates $350,000 for the 2004 Stormwater Sub-CIP Program. The 2004 Stormwater Sub-CIP Program allocates $135,000 for this project. As a result of the low bid, this program will realize a savings of over $68,000.00. RECOMMENDATION: It is recommended that the City Commission award the contract for the 2004 Drainage Improvements, Huntington Road Ditch, Project No. 03-1394, to Wilbur Construction Co. in the amount of $66,707.05. City of Salina 2004 Sub-CIP 4/21/2004 STORMWA TER PROJECTS/PLANNING Flood & Drain. Flood Control 04-1437 3rd Street Storm Sewer $90,000 Flood & Drain. Flood Control 02-1370 Huntington Ditch $135,000 t $66,707 Flood & Drain. Flood Control 04-1439 Marymount Road Drainage Study I $20,000 Flood & Drain. Flood Control 04-1440 Pleasant Hill Rd. 9 x 4 RCB Repl. I $25,000 Flood & Drain. Flood Control 04-1428 Downtown Storm Drainage Flood & Drain. Flood Control Deborah Drive** I $20,000 ESTIMATED TOTAL: TOTAL YTD COST: BALANCE: $290,000 $66,707 $223,293 TOTAL BUDGET = $350,000 Project Details 8 ~ 1 Inch = 400 Feet