Claflin at Crawford At-Grade Crossing Improvement (UPRR REMS Folder #22460)U PPR R-ums %I dtr 4 6G4 UO
Public Road Improvements 08/24/07
Estimated Costs
Form Approved -AVP Law
IMPROVEMENTS TO EXISTING PUBLIC ROAD AT GRADE CROSSING
FOR CLAFLIN AVENUE, DOT 815066D
M.P. 549.10 SID INDUSTRIAL LEAD
SALIN., KS
THIS AGREEMENT, executed in duplicate this 7th day of November, 2016 by and
between UNION PACIFIC RAILROAD COMPANY, a Delaware corporation ("Railroad"), and CITY
OF SALINA, a municipal corporation of the State of Kansas ("Political Body").
RECITALS:
Political Body has requested Railroad to improve the existing Clatlin Avenue crossing, at grade,
along, over and across Railroad's track and right of way at Railroad Mile Post 549.10, on Railroad's SID
Industrial Lead, DOT No. 815066D, in City of Salina, Saline County, State of Kansas (the "Crossing"), to
which Railroad is agreeable, but solely upon terms and conditions hereinafter set forth.
The location of the Crossing is generally shown on the print marked Exhibit A, attached hereto
and hereby made a part hereof.
AGREEMENT:
NOW THEREFORE, in consideration of the premises and of the promises and conditions
hereinafter set forth, the parties hereto agree as follows:
1. Railroad shall furnish all labor, material, equipment and supervision for, and shall (a)
remove the existing timber crossings (b) install a 64 ft. precast concrete crossing, (c) field weld rail, (d)
relay track at the Crossing with 136 pound rail, (e) renew the crossties, and (f) surface the track with new
ballast.
2. Political Body agrees to reimburse the Railroad for sixty five percent (65%) of Railroad's
actual labor and material costs associated with the work and materials described in Section I above.
Railroad estimates such cost to be Fifty Four Thousand Two Hundred and Eight Dollars ($54,238.00), as
set forth in Estimate of Material and Force Account dated November 1, 2016 marked Exhibit B, hereto
attached and hereby made a part hereof. During the performance of such work Railroad will provide
progressive billing to Political Body based on Railroad's actual costs. Actual costs to Railroad shall
include customary additives (which includes its overhead and indirect construction costs) to materials,
services and labor provided by Railroad. Within One Hundred Twenty (120) days after Railroad has
completed its work, Railroad will submit a inial billing to Political Body for any balance owed. Political
Body shall pay Railroad within thirty (30) days of its receipt of progressive and final bills submitted by
Railroad.
3. Railroad, at its cost, shall maintain the Crossing between the track tie ends and Political
Body, at its cost, shall maintain all other portions of the Crossing. If, in the future, Political Body elects
to have the surfacing material between the track tie ends replaced with paving or some surfacing material
other than timber planking, Railroad, at the Political Body's expense, shall install such replacement
surfacing.
4. Political Body, at its cost, shall provide all labor, material and equipment associated with
traffic control, barricades, detour signing, approach paving, advanced warning signs and pavement
markings. All such work shall be in compliance with the current Manual on Uniform Traffic Control
Devices.
Public Road Improvements 08/24/07
Estimated Costs
Fonn Approved -AVP Law
5. If Political Body's contractor(s) islare performing any work described in Section 4 above,
then Political Body shall require its contractor(s) to execute Railroad's standard and current form of
Contractor's Right of Entry Agreement. Political Body acknowledges receipt of a copy of the
Contractor's Right of Entry Agreement and understanding of its terms, provisions, and requirements, and
will inform its contractor(s) of the need to execute the Agreement and to obtain and provide to Railroad
the insurance policies, binders, certificates and endorsements that are required in the Contractor's Right of
Entry Agreement. Under no circumstances will the Political Body's contractors) be allowed onto the
Railroad's premises without first executing the Contractor's Right of Entry Agreement and providing the
aforesaid insurance documents.
6. Fiber optic cable systems may be buried on Railroad's property. Protection of the fiber
optic cable systems is of extreme importance since any break could disnrpt service to users resulting in
business interruption and loss of revenue and profits. Political Body or its contractor(s) shall telephone
Railroad during normal business hours (7:00 ami. to 9:00 p.m., Central Time, Monday through Friday,
except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for emergency calls) to
determine if fiber optic cable is buried anywhere on Railroad's premises to be used by Political Body or
its contractor(s). If it is, Political Body or its contactor(s) will telephone the telecommunications
company(ies) involved, arrange for a cable locator, and make arrangements for relocation or other
protection of the fiber optic cable prior to beginning any work. on Railroad's premises.
7. Political Body, for itself and for its successors and assigns, hereby waives any right of
assessment against Railroad, as an adjacent property owner, for any and all improvements made under
this Agreement.
8. Covenants herein shall inure to or bind each party's successors and assigns; provided, no
right of Political Body shall be transferred or assigned, either voluntarily or involuntarily, except by
express written agreement acceptable to Railroad.
9. Political Body hereby confirms that funds have been appropriated for the work set forth
in this Agreement.
10. The person signing this Agreement on behalf of Political Body hereby confirms that
he/she is authorized under Political Body policies and procedures to execute this Agreement and to bind
Political Body to the obligations under this Agreement.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date
first herein written.
UNION PACIFIC RAILROAD COMPANY
By g&
Title: Kevin n- Hmr-ks
AVP Engineefing
CITY OF SALINA
Z
Pew ,hin.q St
S 11 th S.I.
'
-fs''7 p
a
S
1 Otl1 S t
a
�
4e7
N
m
9th S t
S 9bti St
:
ai
th 91 Pi
I
�
Q:
m
VE
T
�
IN
IHl hlan l` pv
rc
:'Highlan-d Ave
simmono St
H
M
Lara cm S(
S
S-�,Onta Fa- Ave
O
O
rn
�.elihart St
?
co
RR
a iA 6
CA
C:)cn
to
r:
a
lot
losbartla St
Dr. burn r
xs
D
m
A
=
Qain0l
St
o
CA m
3 S
o'
G 10
vw v 0
0
I
cn00.
mn
_..«�
.�
m
ut
�CL
00
:3= a
2
tV ortp;l S d
a
CD "CD
cpm_
0Op
n <D ts1
¢
ri�
W 0
��.
O
ps
0 0) CAQ}
z
c O—N N
`�
Dsa..
ch
Dr
C
g D.@
co CL
n
O
rn
m
c
fn O
�•
btu Gh
.$t as
s
-ti a
l<
m
O�
07+
. J Nye"
�Xji�i i7
DATE: 2016-11-01
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD
THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2017-05-02
DESCRIPTION OF WORK:
SALINA, KS / CLAFLIN RD / DOT#815066D-2 / SID IND LD / MP 549.10
REMOVE EXISTING 48TF CROSSING SURFACE, INSTALL NEW 64TP CROSSING SURFACE
INCLUDING TIES, RAIL, AND OTM
PROJECT WAS BUILT USING FED ADDITIVE W/ OVERHEAD AND INDIRRCT 234$
UPRR WILL HE REIMBURSED FOR 65% OF COST TO REPLACE THE CROSSING SURFACE
BY THE CITY OF SALINA
PID: 100163 AWO. MP,SUBDIV: 549.10, SID
SERVICE UNIT: 14 CITY: SALINA STATE: KS
DESCRIPTION QTY UNIT LABOR MATERIAL RECOIL UPRR TOTAL
ENGINEERING WORK
ENGINEERING
FLAGGING
LABOR ADDITIVE 2343
TRACK
TOTAL ENGINEERING
SIGNAL WORK
LABOR ADDITIVE 234
MATL STORE EXPENSE
SALES TAX
SIGNAL
TOTAL SIGNAL
TRACK 6 SURFACE WORK
BALAST
BILL PREP FEE
CONTRACT COSTS
ENVIRONMENTAL PERMIT
FIELD WELD
FOREIGN LINE FREIGHT
HOMELINE FREIGHT
LABOR ADDITIVE 234%
MATL STORE EXPENSE
OTM
RAIL
RDXING
SALES TAX
SWTIE
TRK-SURF,LIN
WELD
XTIE
TOTAL TRACK & SURFACE
LABOR/MATERIAL EXPENSE 51385 32052-Y-------
RECOLLECTIBLE/UPRR EXPENSE 54230 29199 --------
ESTIMATED PROJECT COST 83437
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE 1VENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
1751
1138
613
1751
751
488
263
751
7614
4949
2665
7614
751
488
263
751
10867
7063
3804
10867
1259
818
441
1259
25
16
9
25
20
13
7
20
640
500
741
399
1140
1899
545
1588
856
2444
1.00 CL
1356
907
1470
793
2263
900
585
315
900
500
325
175
500
10
6
4
10
1104
717
387
1104
628
408
220
628
900
585
315
900
23286
15135
8151
23286
312
203
109
312
1936
7645
6227
3354
9581
160.00 LF
1926
2692
3001
1617
4618
64.00 TF
670
10101
7002
3769
10771
1084
703
381
1084
51.00 EA
2508
3464
3882
2090
5972
2045
1329
716
2045
1349
756
1368
737
2105
29.00 EA
2439
1648
2641
1406
4047
38619
31507
45587
24539
70126
LABOR/MATERIAL EXPENSE 51385 32052-Y-------
RECOLLECTIBLE/UPRR EXPENSE 54230 29199 --------
ESTIMATED PROJECT COST 83437
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE 1VENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.