Audit Report - 1975
IH)\KI1 01 !)IKH !"l<'
'. í D \
--1 ,-, \
,- '
,
- ;'! C~-;~) ,
W'1 f' lI"n,,~ ; ",,<em."
HEN E VI)R ( KSEN Va, Chwm.w
IOHN I Zl'1MERMAN, S,-, -hoc
DEAN 11" IER C J WERT!
S.ALIN.A .AIRFOR T .A. UTHORJ:T"Y
SALIN A MUNICIPAL AIRPORT
I' 'i I', I " \ '-1\ '-
,,-,V,
TFR\1INAl Bl'lLlJlN(' "O 120
f \1 I ,. IV\ I I
SALlNA- KA""AS 67401
,.co' ".-..,,;
"'I"" S1.",,~'-'
February 24, 1976
Gentlemen:
The Salina Airport Authority submits an accounting of its operations for the
calendar year 1975, as reported by A. H. Leckband & Co., its independent
Certified Public Accountants.
In general, 1975 was a very good year with increased air operations, increased
construction, and increased employment at the Salina Airport IndustTial Center.
Air operations increased 38% over 1974. This was due in large part to the
increased operation of Aircraft Services Inc. including their pilot training
school; also TWA pilot training in Lockheed 1011, conducted at Salina for
All Air Nippon Airline, which was considerable last year.
Construction continued at Tony's Pizza facility. A two-story addition was
built on the northwest side of the plant. The top floor will house the
executive offices and the bottom floor will give them increased warehouse
space. Schwan's Sales Enterprises Inc. purchased the B & B Flight Inc. hangar
on the ramp southwest of Fire Station #3 and leased a total of 5.9 acres of
ramp space for a truck repair and distribution center for their fleet of
refrigerated trucks.
Beech Aircraft Corporation leased the 50,000 sq.ft. ElDorado Motor Home Plant
building and remodeled it for aircraft manufacturing. This will provide space
for complete manufacture of the pressurized Baron, and this operation will be
complete sometime this spring and will increase Beech employment at Salina
by 125 personnel. The former E1Dorado Building will also accommodate another
manufacturing space for another aircraft at a later date. The Beech pressurized
Baron was moved to Salina from Wichita and an assembly line installed in the
big hangar along with the Beech Duke.
The Airport Aid Development Project (ADAP) construction was completed; con-
sisting of an overlay of Runway 4-22 and Taxiway #10; remarking of all runways
and Taxiway #10 to conform to new FAA criteria; lighted wind socks at each
end of Primary Runway 17-35; Omni Directional lead-in lights at the north end
of Primary Runway 17-35; and some additional lighting controls. Completion of
this work has resulted in considerable improvement to the runway facilities.
The Authority received title to three blocks of barracks which were turned back
to the U.S. Government by Kansas Technical Institute--two blocks east of the
red and white water tower and the 200 block presently housing the ](ansas Military
Page 2
Academy. The KMA has leased their present 200 block and the first block of
barracks just east of the water tower from Salina Airport Authority and will
start rehabilitating the block by the water tower in March of this year. The
other block has been leased to Jarvis Construction Company and construction is
underway to convert the barracks to an apartment complex.
The Authority is working with the Salina Chamber of Commerce to get Jet service
into Salina. This would be a Frontier Airlines Boeing 737 Jet and would service
Salina, Topeka, Lincoln and Chicago. Frontier needs to finalize plans to go
into O'Hara at Chicago with Civil Aeronautics Board.
A planned and executed maintenance program for all Salina Airport Authority
buildings, property, and the airfield facilities has been carried on during
the year. We believe all properties are in good condition.
The Salina Airport Authority appreciates the cooperation it has received from
all segments of the Salina community during the past year, and pledges its
efforts toward continued progress in its area of responsibility.
Sincerely,
SALINA AIRPORT, tU~~OI~ITY
().ß ~A~
W. P. Horton
Chairman
WPH:ks
SALINA AIRPORT AUTHORITY
Salina, Kansas
AUDIT REPORT
Year 1975
A. H. LECKBAND & CO.
Certified Public Accountants
Accounting Bldg., 719 East Crawford
Salina, Kansas 67401
EXHIBIT A
Schedule A-l
Schedule A-2
Schedule A-3
EXHIBIT B
Schedule B-1
Schedule B-2
Schedule B-3
Schedule B-4
Schedule B-5
EXHIBIT C
EXHIBIT D
EXHIBIT E
SALINA AIRPORT AUTHORITY
TABLE OF CONTENTS
Page
Auditor's Report
1
Comments
2
Statement of Receipts, Disbursements, and
Composition of Ending Cash Balances
Operating Revenues
Operating Expenditures
Capital Expenditures
3
4
5
6
Bonds of Indebtedness
General Obligation Bonds
Building Revenue Bonds - Series 1971
Building Revenue Bonds - Series 1972
Building Revenue Bonds - Series 1973
Building Revenue Bonds - Series 1973-2
7
8
9
10
11
12
Reconcilement of Fiscal Agency Account
13
Schedule of Investments
14
Insurance in Force
15
February 3, 1976
To the Directors
Salina Airport Authority
Salina, Kansas 67401
Gentlemen:
We have examined the financial and related general records of the
Salina Airport Authority for the year ended December 31, 1975.
Our examination was performed in accordance with the provisions of
the Minimum Standard Audit Program approved by the State Municipal
Accounting Board September 28, 1963, and subsequent amendments thereto,
and accordingly included such tests of the accounting records and such
other auditing procedures as we considered necessary in the circumstances.
The Salina Airport Authority has not maintained a record of its
general fixed assets, and accordingly a statement of general fixed assets,
required by generally accepted accounting principles, is not: included in
this report.
In our opinion, the accompanying exhibits and schedules reflect
fairly the cash position of the Salina Airport: Authority at: December
31, 1975, and the results of its cash transactions for the year then
ended on a basis consistent with that of the preceding year.
// II, /;'_.::/1:( ;¡n,"-
I (,;"
I ,'-
CERTIFIED PUBLIC ACCOUNTANTS
L'
( : -
't;¿",--, (/, (,1/""""
Euge~e O. Harrison, Certified Public
Accountant, Certificate No. 1401, in
charge of and actively engaged on
this audit.
COMMENTS
1.
The Salina Airport Authority is governed by a board of five directors
appointed by the Ci ty Commiss ion of the City of Salina, KanSélS. The
following directors served during the period of our examination:
William P. Horton, Chairman
Ben Vidricksen, Vice-Chairman
C.F. Heath, Secretary-Treasurer-term
John Zimmerman, Secretary-Treasurer
Dean Tinkler
C.J. Wertz-appointed April 26, 1975
expired April 26, 1975
2.
The following officials, appointed by the Salina Airport: Authority
Board of Directors, served during the period of our examination:
John F. Scanlan, Executive Vice-President
Paul Wall, General Manager and Airport Manager
3.
The Salina Airport Authority is exempt from the cash basis law
under the provisions of K.S.A. 10-1116 as stated in the audit
reports of prior years.
4.
We recommend that a determination of the values of the capital assets
be recorded on the books and that a realistic depreciation charge be
computed and recorded annually.
5.
A Bond Reserve Account and a Replacement and Depreciation Account
were established during 1971 in accordance with the Building Revenue
Bond issues. The requirements and balances of these accounts are
as follows:
Balances required as of December 31, 1975
Actual balances as of December 31, 1975
Bond Reserve
Account
$19,000.00
19,000.00
Replacement and
pepreciation Account
$12,000.00
12,000.00
:>
S,;LI~A AIRPORT AUTHORITY
GENERAL OPERATING F~~
EXHIBIT A
STATE~ŒNT OF RECEIPTS, DISBL~SEME~ìS}_ABD COMPOSITION OF ENDING CASH BALANCES
January 1 to December 31, 1975 January 1 to December 31, 1974
Airport Build ing General Airport Building General
Revolving Revenue Operating Revolving Revenue Operating
Account Account Fund Totals Account Account Fund Totals
CASH AND INVESTMENTS - January 1 $296,801.80 $199,477 .61 $ 496,279.41 $210,162.01 $180,261.60 $ 390,423.61
RECEIPTS
Operating revenues-Schedule A-I $410,603.72 $314,870,42 $ 725,474.14 $297,381.97 $307,678.11 $ 605,060.08
Proceeds from sale of Building
Revenue Bonds - - - - 350,000.00 350,000.00
Accrued interest on sale of bonds - - - - 3,194.52 3,194.52
Proceeds of Airport Development Aid
Program Grant 261,577 .33 - 261,577 .33 - - -
TOTAL RECEIPTS $672,181.05 $314,870.42 $ 987,051.47 $297,381,97 $660,872.63 $ 958,25"'-.60
RECEIPTS AND BEGINNING BALANCE $968,982.85 $514,348,03 $1,483,330.88 $507,543,98 $841,134.23 $1,348,678.21
DISBURSEMENTS
Operating expenditures-Schedule A-2 $264,541.01 $226,444.56 $ 490,985.57 $209,342.18 $236,604.09 $ 445,946.27
Capital expenditures-Schedule A-3 1,535.25 61,000.00 62,535.25 1,400.00 222,052.53 223,452.53
Loan repayment-Planters State Bank
and Trust Co. - - - - 183,000.00 183,000.00
Airport Development Aid Program
project expenditures 347,061.53 - 347,061.53
Overpayment to Kansas Public
Employees Retirement Fund 2,062.61 - 2,062.61
TOTAL DISBURSEMENTS $615,200.40 $287,444.56 $ 902,644.96 $210,742,18 $641,656.62 $ 852,398.80
CASH AND INVESTMENTS-December 31 $353.782.45 $226,903.47 $ 580,685.92 $296,801.80 $199,477 .61 $ 496,279.41
AVAILABLE CASH AND INVESTMENTS-December 31
First National Bank & Trust Co. $ - $ 25,163,35 $ L5,163.35 $ - $ 37,356.64 $ 37,356,64
Planters State Bank & Trust Co. 53,873.46 - 53,873.46 10,527.36 - 10,527,36
National Bank of America - 90,740.12 90,740,12 - 129,120.97 129,120.97
First State Bank & Trust Co. 3,934.67 - 3,934.67 29,877.71 - 29,877.71
Certificates of Deposit 300,000.00 80,000.00 380,000.00 260,000.00 15,000.00 275,000.00
Certificates of Deposit-Bond Reserve - 19,000.00 19,000.00 - 11 ,000 .00 11,000.00
Certificates of Deposit-Replacement
and Depreciation Reserve - 12,000.00 12,000.00 - 7,000.00 7,000.00
TOTAL $357,808.13 $226,903.47 $ 584,711.60 $300,405.07 $199,477 .61 $ 499,882.68
DEDUCT - Amounts withheld from payroll 4,025.68 - 4,025.68 3,603.27 - 3,603.27
TOTAL CASH M~ INVESr::D.ìS-December 31 ~353.782.45 ~J26.903.47 $n 580,685.92 $296,801.80 $199.477 .61 $ 496,279.41
3
January 1 ro December 31, 1975
Airport Building General
Revolving Revenue Operating
Account Account Fund Totals
$186,983.99 $281,391.48 $468,375.47
6,721.83 5,185.00 11,906.83
5,975.00 1,090.00 7,065.00
14,380.00 14,380.00
4,677.50 4,777.50
58,867.64
67,384.59
77 5 .94
24,743.80
484.12
1,327.16
165.00
7,777.93
55,585.16
1,858.00
SALINA AIRPORT AUTHORITY
GENERAL OPERATING FUND
OPERATING REVENUES
Building rents
Agricultural land rents
Other land rents
Hangar rents
Other rents
Fixed base operator
Landing fees
Commissions
Interest on investments
Interest on sale of property
Sale of property
Reimbursement-FAA mowing
Reimbursement-Airport security
Insurance proceeds
Miscellaneous income
100.00
58,867.64
67,384.59
77 5 . 94
18,511.64
165.00
7,777.93
55,585.16
1,755.00
TOTAL OPERATING REVENUES
$410,603.72
Schedule A-l
6,232.16
484.12
1,327.16
103.00
lli3~870 .42
$725,474.14
~
January 1 to December 31, 1974
Airport Building General
Revolving Revenue Operating
Account Account Fund Totals
$184,480.15 $253,068.52 $437,548.67
5,365.00 5,185.00 10,550.00
3,96J.00 1,000.00 4,980.00
8,820.00 8,820.00
7,056.15 7,156.15
50,411.60
33,186.61
77 5 . 54
26,391.51
730 .26
22 , 513 . 84
180.00
100.00
5(,411.60
33,186.61
77 5 . 54
17,187.17
180.00
1, 715 .90
i297,381.97
9,204.34
730.26
22 , 513 . 84
100.00
$307_,678.11
1,815.90
$60.5,060.08
SALI~A AIRPORT AllHORITY
GE~ERAL OPE~~TING FU~~
OPERATING EXPE~~ITL~ES
OFFICE AND ADMINISTRATION
Office salaries
Office supplies
Postage
Car expense
Travel expense
Legal and auditing
Insurance
Interest on note
Appraisal and abstract fees
Engineering
Social security tax
Employees retirement
Telephone
Reimbursable charges
Airport security
Other office and administration
TOTALS
MAINTENANCE
Building maintenance
Runways, taxiways and ramps
Equipment, gas, oil & repairs
Utilities
Grounds maintenance
Janitor supplies
Maintenance salaries
Snow removal
Airfield lighting equipment
Signs
Other maintenance expense
TOTALS
BOND AND INTEREST
Bond principal redemmed
Bond interest expense
Bond commission and postage
Expense relating to bond issue
TOTALS
TOTAL OPERATING EXPENDITURES
Schedule A-2
January 1 to December 31, 1975
Airport Building General
Revolving Revenue Operating
Account Account Fund Totals
$ 50,460.00
0/'\ 0 /'\ C
;JV7.V'"
277 .60
2,799.28
802.08
5 , 177 . 40
25,087.19
6,589.61
5,817.73
1,752.66
(9.30)
5,211.38
2,943.53
$107,818.21
$ 17,987.43
10,912.88
5,407.70
14,079.68
11,6"1.07
1,033.88
79,368.59
149.32
16,182.25
$156,722.80
$
$
$264~541.01
January 1 to December 31, 1974
Airport Building General
Revolving Revenue Operating
Account Account Fund Totals
$
$50,460.00 $ 45,665.07 $
909.05 614.32
277 .60 244.60
2,799.28 3,263.96
802.08 1,290.52
5,177 .40 6,419.09
25,087.19 23,841.43
1,052.72
147.50
268.98
6,589.61 5,482.86
5,817.73 4, 320 .71
1,752.66 1,601.93
(9.30) 22.27
5,211.38 3,551.78
2,943.53 2,576.23 1.00
$107,818.21 $ 99,163.75 1-L201.22
$ 17,987.43 $ 9,419.12 $
10,912.88 6,928.87
5,407.70 5,388,60
14,079.68 10,535.89
11,601.07 7,233.75
1,033,88 1,014.82
79,368.59 63,905.83
- 248.10
149.32 849.44
- 1.69
16,182.25 4,652.32 -
$156,722.80 $110,178.43 $
$
$
$
$140,000.00 $140,000.00
86,109.41 86,109.41
35.15 35.15
300.00 300.00
$226,444.56 $226,444.56
$226,444.56 $490,985.57
5
$
$140,000.00
92,678.16
36.67
2,688.04
$
$235,402.87
~1~,342 .18
i.236. 604 .09
$ 45,665,07
614.32
244.60
3,263.96
1,290.52
6,419.09
23,841,43
1,052.72
147.50
268.98
5,482.86
4,320,71
1,601.93
22.27
3,551.78
2,577 ,23
$100,364,97
$
9,419.12
6,928.87
5,388.60
10,535.89
7,233.75
1,014.82
63,905,83
248,10
849.44
1.69
4,652.32
$110,178.43
$140,000.00
92,678.16
36.67
2,688.04
$235,402.87
~42.. 946.27
SALINA AIRPORT AUTHORITY
GENERAL OPERATING FUND
CAPITAL EXPENDITURES
Equipment
Self-propelled paint striper
1965 Ford truck
Building improvements
Building 1021-Rickel Manufacturing
Corporation
Building 266-Schwan's Sales
Enterprises, Inc.
Hangar-Nelson Aviation
Building 986-Hastings Dynamold
TOTAL CAPITAL EXPENDITURES
Schedule A-3
January 1 to December 31, 1975
Airport Building General
Revolving Revenue Operating
Account Account Fund Totals
$1,535.25
$
25,000.00
36,000.00
~535.25
$61,000.00
$ 1,535.25
25,000.00
36,000.00
$R535.25
6
January 1 to December 31, 1974
Airport Building General
Revolving Revenue Operating
Account Account Fund Totals
$
1,400.00
~.L400 .00
$
51,955.88
142,096.65
28~000.00
$222.. 052.53
$
1,400.00
51,955.88
142,096.65
28,000.00
.t21.l.. 45 2 .53
SALINA AIRPORT AUTHORITY
BONDS OF INDEBTEDNESS
December 31, 1975
EXHIBIT B
Original Principal Outstanding
Issue Paid Balance
--
General Obligation Bonds
Schedule B-1 $ 790,000.00 $235,000.00 $ 555,000.00
Building Revenue Bonds - Series 1971
Schedule B-2 250,000.00 70,000.00 180,000.00
Building Revenue Bonds - Series 1972
Schedule B-3 500,000.00 105,000.00 395,000.00
Building Revenue Bonds - Series 1973
Schedule B-4 350,000.00 50,000.00 300,000.00
Building Revenue Bonds - Series 1973-2
Schedule B-5 350,000.00 50,000.00 300,000.00
$2,240,000.00 $510,000.00 $1,730,000.00
7
SALINA AIRPORT AUTHORITY
GENERAL OBLIGATION BONDS
December 31, 1975
Schedule B-1
Date of Issue:
Amount of Issue:
Interest Rate:
Maturity Date:
Principal Paid:
Outstanding Balance:
February 1, 1967
$790,000.00
4.25, 3.375, 3.4%
February 1, 1988
$235,000.00
$555,000.00
Schedule of Payments
Due in Bond Bond
Year Principal Int:erest
1976 $ 35,000.00 $ 18,196.91
1977 40,000.00 16,931.29
1978 40,000.00 15,581.29
1979 40,000.00 14,231.29
1980 40,000.00 12,881.29
1981 45,000.00 11 ,446.92
1982 45,000.00 9,928.17
1983 45,000.00 8,409.42
1984 45,000.00 6,885.00
1985 45,000.00 5,355.00
1986 45,000.00 3,825.00
1987 45,000.00 2,295.00
1988 45,000.00 765.00
$555.000.00 $126,731.58
p,
SALINA AIRPORT AUTHORITY
BUILDING REVENUE BONDS - SERIES 1971
December 31, 1975
Date of Issue:
Amount of Issue:
Interes t Ra te:
Maturity Date:
Principal Paid:
Outstanding Balance:
January 1, 1971
$250,000.00
5/0
January 1, 1981
$70,000.00
$180,000.00
Schedule of Payments
Due in Bond Bond
Year Principal Interest
1976 $ 25,000.00 $ 8,375.00
1977 25,000.00 7,125.00
1978 30,000.00 5,750.00
1979 30,000.00 4,250.00
1980 35,000.00 2,625.00
1981 35,000.00 875.00
$ 180.000.00 $ 29.000.00
Schedule B-2
9
SALINA AIRPORT AUTHORITY
BUILDING REVENUE BONDS - SERIES 1972
December 31, 1975
Date of Issue:
Amount of Issue:
Interest Rate:
Maturity Date:
Principal Paid:
Outstanding Balance:
July 1, 1972
$500,000.00
4.5, 5%
July 1, 1984
$105,000.00
$395,000.00
Schedule of Payments
Due in Bond Bond
Year Principal Interest
1976 $ 35,000.00 $ 18,750.00
1977 40,000.00 17,175.00
1978 40,000.00 15,375.00
1979 40,000.00 13,575.00
1980 45,000.00 11, 77 5.00
1981 45,000.00 9,750.00
1982 50,000.00 7,500.00
1983 50,000.00 5,000.00
1984 50,000.00 2,500.00
$395,000.00 $101,400.00
Schedule B-3
10
SALINA AIRPORT AUTHORITY
BUILDING REVENUE BONDS - SERIES 1973
December 31, 1975
Date of Issue:
Amount of Issue:
Interest Rate:
Maturity Date:
Principal Paid:
Outstanding Balance:
January 1, 1973
$350,000.00
5.25%
February 1, 1985
$50,000.00
$300,000.00
Schedule of Payments
Due in Bond Bond
Yeélr Principal Interest
1976 $ 25,000.00 $ 15,093.75
1977 25,000.00 13,781.25
1978 25,000.00 12,468.75
1979 25,000.00 11,156.25
1980 25,000.00 9,843.75
1981 25,000.00 8,531.25
1982 40,000.00 6,825.00
1983 40,000.00 4,725.00
1984 35,000.00 2,756.25
1985 35,000.00 918.75
$300,000.00 $ 86,100.00
Schedule B-4
11
SALINA AIRPORT AUTHORITY
BUILDING REVENUE BONDS - SERIES 1973-2
December 31, 1975
Schedule B-5
Date of Issue:
Amount of Issue:
Interest Rate:
Maturity Date:
Principal Paid:
Outstanding Balance:
December 31, 1973
$350,000.00
6, 6.5/0
December 1, 1985
$50,000.00
$300,000.00
Schedule of Payments
Due in Bond Bond
Year Principal Interest
1976 $ 25,000.00 $ 19,000.00
1977 25,000.00 17,500.00
1978 25,000.00 16,000.00
1979 25,000.00 14,500.00
1980 25,000.00 13 ,000.00
1981 25,000.00 D,375.00
1982 40,000.00 9,750.00
1983 40,000.00 7,150.00
1984 35,000.00 4,550.00
1985 35,000.00 2,275.00
$300,000.00 $115,100.00
12
SALINA AIRPORT AUTHORITY
RECONCILEMENT OF FISCAL AGENCY ACCOUNT
December 31, 1975
BALANCE WITH FISCAL AGENCY - January 1, 1975
REMITTANCES
Matured bonds
Interest coupons
Commission and postage
TOTAL REMITTANCES AND BEGINNING BALANCE
RETURNS
Cancelled bonds
Interest coupons paid
Commission and postage retained
BALANCE WITH FISCAL AGENCY - December 31, 1975
$35,000.00
19,378.16
35.15
$35,000.00
18,871.94
35.15
ANALYSIS OF BALANCE WITH FISCAL AGENCY
UNREDEMMED MATURED INTEREST COUPONS
Bond No.
73
74
75
76
77
78
Coupon No.
16
16
16
16
16
16
EXHIBIT C
$
54 ,413 .31
$54,413 .31
53,907.09
$
506.22
Amount
$ 84.37
84.37
8¿¡. 3 7
84.37
84.37
84.37
$506.22
n
SALINA AIRPORT AUTHORITY
SCHEDULE OF INVESTMENTS
December 31, 1975
Balance
1-1-75
AIRPORT REVOLVING ACCOUNT
Certificates of deposit $260,000.00
BUILDING REVENUE ACCOUNT
Certificates of deposit
TOTAL -
GENERAL OPERATING FUND
33,000.00
$293,000.00
Purchases
Year 1975
$1,580,000.00
323,000.00
$1.903,000.00
Redemptions
Year 1975
$1,540,000.00
245,000.00
$1. 785,000.00
EXHIBIT D
Balance
17. -31-75
$300,000.00
111 ,000 .00
$411 ,000.00
14
Workmen's Compensation and
Employer's Liability
Comprehensive General
Liability
Owners, Landlords, and
Tenants Liability
Rental Building 266
Rental Buildings -
Industrial
Rental Buildings -
Dwe 11 ings
Airport Terminal and
Rental Buildings
Vehicles
SALINA AIRPORT AUTHORITY
INSURANCE IN FORCE
December 31, 1975
Type of Coverage
Bodily injury and
property damage
Fire and lightning,
extended coverage,
vandalism and mali-
cious mischief
Fire and lightning,
extended coverage,
vandalism and mali-
cious mischief-rental
value insurance
Fire and lightning,
extended coverage
Fire and lightning,
extended coverage,
vandalism and mali-
cious mischief
Bodily injury,
Property damage
Fire, lightning, or
transportation, theft,
combined additional
coverage
Medical payments
Uninsured motorists
Amount of
Coverage
$
100,000.00
5,000,000.00
1,000,000.00
1,821,500.00
301,930.00
37,000.00
1,824,000.00
100/300,000.00
50,000.00
31,300.00
2,000.00
15/30,000.00
EXHIBIT E
Co-Insurance
Percentage
90/0
15