Certificate of Substantial Completion
Document G7047M — 2000 Certificate of Substantial Completion PROJECT: PROJECT NUMBER: 14-1622/ OWNER (Name and address) CONTRACT FOR:General Construction Salina Fire Station No. 1 CONTRACT DATE:December 1,2014 ARCHITECT:❑ Phase 11 Addition CONTRACTOR:❑ 222 W. Elm Street Salina Kansas.67401 FIELD:❑ TO OWNER: TO CONTRACTOR: OTHER:❑ (Name and address) (Name and address) City of Salina Busboom&Rauh Construction Company 300 W.Ash 145 1/2 S.Santa Fe Avenue Salina,Kansas 67401 Salina Kansas 67401 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Entire project is'ready for Owner's intended use The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate,Which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement As outlined in the specifications. December 21,2015 Gravity::Works Architecture, P.A. . ��41111/ December 21,2105 ARCHITECT BY DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective:$5,000.00 The Contractor will complete or correct the Work on the list of items attach-, ereto within Fourteen(14)days from the above date of Substantial Completion. 10P Busboom&Rauh Construction / Company / ► . .. ` ♦/ December 21,2015 CONTRACTOR r DATE The Owner accepts the Work or designated portion as substantially complete and will assume full possession at Noon(time)on December 21,2015(date). City of Salina azaa— - A s December 21,2015 OWNER BY DATE The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) AIA Document G704TM—2000.Copyright©1963,1978,1992 and 2000 by The American Institute of Architects.All rights reserved.WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 14:21:52 on 01/05/2016 under Order No.4805211877_1 which expires on 05/13/2016,and is not for resale. User Notes: (1145383760)