Loading...
6.3 Award contract for 2016 Mill & InlayCITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 2/8/2016 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: FISCAL APPROVAL: NO: 6 BY: ITEM PUBLIC WORKS DEPARTMENT FINAL APPROVAL: NO: 3 Page 1 BY: Daniel R. Stack BY: , ITEM: Award of contract for the 2016 Asphalt Mill & Inlay, Project No. 63095. BACKGROUND: This 2016 sub-CIP Street Repair major maintenance project consists of approximately 6.1 miles of pavement milling and asphalt replacement on City arterial, collector and local streets, as shown on the attached map. The top 1.5 inches of the existing asphalt pavement will be rehabilitated to preserve the pavement section. When used with periodic crack sealing, microsurfacing, and chip seal, mill and inlay helps to preserve and extend the life of asphalt pavement. Included in this project are parking lot improvements at UaKdale Park (780 s.y.) at a cost of $27,159.50. Also included is Iron Avenue from Delaware to Marymount, which was microsurfaced with disappointing results last year. The Iron Avenue work is proposed to cost $145,053.70. On Tuesday, January 26, 2016, bids for this project were received and are as follows: Bidder Bid APAC-Kansas, Salina, KS $1,097,428.65 Engineer's Estimate $975,373.88 The asphalt unit price of $65.00 per ton is a 7% increase from last year. As shown in the following table, world oil prices are not a pure indicator of asphalt emulsion prices, but they do have some correlation with the asphalt bid price. 2011 2012 2013 2014 2015 2016 Asphalt price/ton $73.50 $80.40 $70.70 $74.25 $60.75 $65.00 Oil rice/barrel $95.00 $103.00 $91.00 $101.12 $48.66 i $31.45 Staff expected the asphalt unit price to be less than last year. Following the bid opening, staff contacted an asphalt contractor in Wichita who purchased plans but chose not to bid due to other commitments. They stated that much of the asphalt price is in transportation and installation and their proposed bid costs will not be significantly different from last year's. This is consistent with APAC's explanation of their bid price being similar to last year's. Staff prepared a larger project than the proposed budget might cover in the event that prices were significantly better than last year. Staff proposes to remove Ninth Street from the project to get the project closer to the budgeted amount, resulting in a $963,024.09 project. Ninth Street will be reassigned to a future year. FISCAL NOTE: The 2016 sub-CIP budget allocates $800,000 of sales tax funds for asphalt mill and inlay and $30,000 of gas tax funds for parking lot repairs. Staff proposes that the remaining funds for the project be accounted for by savings from the Pavement Sealing ($12,679) and Microsurfacing ($120,405) projects, which is shown on the attached Sub-CIP summary. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 2/8/2016 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: FISCAL APPROVAL: NO: BY: ITEM PUBLIC WORKS DEPARTMENT FINAL APPROVAL: NO: Page 2 BY: Daniel R. Stack BY: COMFORMANCE WITH STRATEGIC PLAN: Goal 3 Action Item: Maintain a stable operating budget for the delivery of core public services, while investing as many financial resources as practically possible into maintaining and developing the public infrastructure. RECOMMENDATION: Staff has identified the following options and recommends Option 1: Option 1. Award the contract for the 2016 Asphalt Mill & Inlay, Project No. 63095, to APAC-Kansas, in the amount of $963,024.09, plus a 5% construction contingency of $48,151.20. Option 2. Reject the APAC bid and give staff further direction. Attachments: Location Map and 2016 sub-CIP street repair budget Cc: APAC-Kansas N 5 th St.: Harsh Ave. to Euclid Ave. L__� 08 December 201 Ave .. -� Antrim Ave �l n I. ---� North St.: 260' east of +� Harsh . , _ EAve }MILL e BroadwayBlvd. to BarneySt. �caa Woodland' r---------------- Ave : I � I ye Stet I------ ---�; -AOtys 0�0 worth St _ Iron Ave.: Delaware Ave. _ to Marymount Rd. 1 j n a :Elm St ♦. South St.: Santa Fe Ave to 4 th St. "' z a poplar St ! ! Ash St a' +� i c =ate` /I ! 1 state St o a Mo Country -Club -1114 r' Marietta AYe _ Iron Ave . 4Crestview Dr L South St.: 9 th St. to Santa. Ave. � walnut s Pa ark Gypsum` Ave a �a 'Qq Meadow Ln E I . Oakdale Park Parking Lot Edgehill Rd o r o j Spruce St X .. i =: e ' m h E ; ^ Greeley Ave Glen` Ave a o ! _— J Queep o t -100 T' 1 a a Presro4 Stratford Dr Rd $ ° it E , I 1'St.LouisSt Beverly Dr 0 Q s Q a Ave G` ,moi_-- . 5 th St.: Crawford St. to Prescott Ave. N Charles St f a Q v cc i Armory Rd.: 5$0' west Crawford St a �Crawvford St Far � '� i 04 of Broadway Blvd. L i - Brown St€ m � Bond ' IlAillwood dr O^� Franklin. m c St Plum Dr gI sr'z''� 5 th St.: Republic Ave. to Crawford St. v�,Wilson-St Martin Ade: 9 th St.: Cloud St. to Republic Ave, i `Rept li` ---- p1:: Claflin Ave.: 9 th St. to railroad tracks east of 4 th St. Cheyenne Ave _ gSunset Dr t Jewell Kirwin C� Ave Acorn Cr G I Ave tela Cloud St.: Highland Ave. to Ohio St. �• _ 'n Ave .oma ; iv 3 Russel Ave 9 th St.: Broadway Blvd, to Cloud St. Ted st �+ t !� oo _- ftlohliiiiiiiiiI n Lynn Dr i Talley;' a . N's in !Ave 1 j I *oxin r' 1' o� ` o ! j Dr C ' Albe Ave '. v Ci L_.x o. a ' R ' ' j Quincy Cr . «: Albert Ave.:' Quincy St. to Roach St. ail a J• ♦ :Wayne Ave C j � Q I � Belmont Blvd.: Roach St. to 00. 267' east of Oxford Dr, S I _a a ' �F x I l % Sierra ♦ ` ' Magnolia RCI Ma nol11a Rd ysil la nalia_Rd\sr !. Beechcraft — �_ Dr _—=-- ----=' = Q�----- IQ RdI gyah`/aha Oxford Dr,: Belmont Blvd. Garden Ave.: Hageman Ave. to Maple Ave. a� to Ohio St. , Maple Ave.: Yale Ave. to Hageman Ave. 4.p '1 Colonial PI Purdue Ave.: Yale Ave. to Hageman Ave. eaiQ Mike Dr c q _------- —_ 1 �__—a Tulane Ave.: 367' south of Yale Ave. toy� o Hageman Ave. '^ Ave. to Maple Ave. CIO Linda Ln.: Arrowhead Ln. to Neal Ave. Yale Ave-: Hageman Schilling Rd . ) 9 c m Mid►angst Me Dustin Rd 5 a Kingston Dr , is Yodd,G[------- - D-1 CL Al u YI a V LL U. I�w LUH F— W H N ci enl I I I I�I Ipl I N N r O 47 1� � O 01 r N c 44 lh N9 0 N N as c_ CL p °D ao ci enl I I I I�I Ipl I N Nl"lo1010l0 010 l011 l O O O O O p 0 0 0 0 O c M to 0 A It 1I+ R v tOo m owlY91ullUI-lv►lw,,l4&lfAlMlt*l N c c av o CL 0 co OL s0V Y 06 ILa 00 e U m a to 'p0 m Z tq Val w nL-7..1- m 9 FI H 10-W,9i M N MN YF LOU 0000� 0 o Q z W N r O 47 1� O 01 r N 44 lh N9 0 N N Nl"lo1010l0 010 l011 l O O O O O p 0 0 0 0 O c M to 0 A It 1I+ R v tOo m owlY91ullUI-lv►lw,,l4&lfAlMlt*l N c c av o CL 0 co OL s0V Y 06 ILa 00 e U m a to 'p0 m Z tq Val w nL-7..1- m 9 FI H 10-W,9i M N MN YF LOU 0000� 0 o Q z W