Loading...
Bridge Repair•-t Agreement No. .14-73M • • PROJECT NO ALT, 81-85 2992 (2) BRIDGE NO, ALT. 81-85-7.71 (5.B,) CITY OF SALINA, KANSAS and STATE HIGHWAY COMMISSION OF KANSAS • A G R E E M E N T ' ' This agreement, made and entered into this i5ott day of 19 Zj , by and between the City of Salina, Kansas, hereinafter ref-dced to as the City, and the State Highway Commission of Kansas, hereinafter referred to as the Commission. R E C I T A L S: WHEREAS, The Commission and the said City are empowered by K.S.A. Chapter 68, Section 169 and Section 412 to enter into agreements for the maintenance and reconstruction and improvement of city connecting links of the State Highway System through said City, and WHEREAS, commitments by the Commission were formulated to repair the structure on the city connecting link of the State Highway System, prior to removal from the system which became effective on January 1 , 1973, and WHEREAS, the City has relied upon the Commission fulfilling its prior commitment, and WHEREAS; the- Commission desires to fulfill its prior commitment by entering into an agreement with the City for a project of major repair and/or partial reconstruction of the above designated bridge, and WHEREAS, the Commission and the said City desire that the following major repair or reconstruction work be done: • Girder Repairs and other miscellaneous repairs as shown on the . approved plans to the bridge designated above which is the structure over Mulberry Creek located about 998 feet south of the centerline of I-70 highway. NOW; THEREFORE, in consideration of the premises and to secure the approval and prosecution of the said project, the parties hereto mutually agree as follows: 1 . That the said project when approved shall be undertaken, prosecuted and may be completed for and on behalf of the said City by the Commission acting in all things as its agent and said City hereby constitutes and • lc No. l4-73M appoints said Commission its agent, and all acts, proceedings, matters and things hereinafter done by the Commission in connection therewith are hereby by said City authorized, adopted, ratified and confirmed to the same extent and with the same effect as though done directly by the said City acting in its own individual corporate capacity instead of by its agent. The plans for the said project, when approved by the City and the State Highway Engineer, are by reference made a part of this agreement. 2. The Commission agrees to let the contract, to perform the work on the project in accordance with the approved plans and specifications for the project, to supervise the work and to administer the payments due the con- tractor, or in the alternative, the Commission may perform the work itself in accordance with the approved specifications for the project. 3. The Commission agrees to do all the work described and pay all the costs thereof whether done by contract or with its own forces. 4. The City agrees to adopt the necessary resolution and to take such legal steps as may be required to give full effect to the terms of this agreement and such traffic regulations as the Commission deems necessary to permit the work to be completed. . IN WITNESS WHEREOF the parties hereto have caused this agreement to be signed by their duly authorized officers on the day and year first above written. ATTEST : THE CITY OF SALINA, NSAS a/0.41.44---1 g 61'./ -10R Gr� u il CITY CLERK M ATTEST: THE STATE HIGHWAY COMMISSION OF KANSAS s0 de,/ ACAmigIr SECRE A.'Y /Assisi T STATE HIGHWAY DIRECTOR . - - PORN APP '/D, al Dna- s.�r.c. - .2 - ROBERT B. DOCKING, Governor ROBERT P. HAGEN ♦S toy Lawrence. Kansas • tor BOB Ii ae Kansas State Highway Commission of Kansas '41 HENRY SCHWALLER Hays. Kansas JOHN D. MONTGOMERY, Director of Highways ? KA jSAK BRUECK H. J. ULRICH, Assistant Director of Highways GALE MOSS JOHN D. McNEAL, State Highway Engineer EI Dorado, Kansas LOUIS KAMPSCHROEDER Garden City. Kansas STATE OFFICE BUILDING TOPEKA, KANSAS 66612 May 18, 1973 Agreement No. 14-73M Alt. 81-85 2992 (2) Alt. 81-85-7.71 (S.B.) City of Salina Saline County Mr. D. L. Harrison City Clerk City Hall • 300 West Ash Salina, Kansas 67401 Dear Mr. Harrison: We are enclosing herewith your fully executed copy of the agreement for the above numbered project. Additional copies of this agreement will be furnished if requested within two weeks of this date. After that period all extra copies will be destroyed. Very truly yours, W. H. Oga , P. E. Engineer of Urban Highways WHO:mj Enclosure • ROBERT B. DOCKING, Governor ROBERT P. HAGEN ,A4$tea.. Lawrence.Kansas at,I\G- BOB KENT EN State Highway Commission of Kansas3 � HENRY SCHWALLER k Hays, Kansas JOHN D. MONTGOMERY, Director of Highways � � KARL A. BRUECK T� Paola, Kansas H. J. ULRICH, Assistant Director of Highways GALE MOSS JOHN D. McNEAL, State Highway Engineer El Dorado, Kansas LOUIS KAMPSCHROEDER Carden City, Kansas STATE OFFICE BUILDING TOPEKA, KANSAS 66612 April 27, 1973 Alt. 81-85 2992 (2) Bridge Repair City of Salina Saline County Mr. N. D. Olson City Manager City Hall 300 West Ash Salina, Kansas 67401 Dear Mr. Olson: The Highway Commission has prepared plans for an improvement project involving bridge repair to the southbound structure over Mulberry Creek located about 998 feet south of the centerline of 1-70 highway on former Alternate US-81 , We are sending you construction plans (Sheets 1-7) indi- cating the scope of the proposed bridge repair. We are also sending you in triplicate the agreement form covering the work to be performed. Will you please handle these forms with the Governing Body for their review and action. If the proposed agreement is satisfactory, two copies should be executed on the part of the City and returned to this office for our handling with the Highway Commission. The third copy may be retained in your files ' for reference pending receipt of your fully executed copy. In connection with executing the agreement the City will no doubt find it necessary to pass a resolution authorizing the City Clerk and Mayor to execute the agreement. For your convenience we are enclosing one copy of a typical resolution frequently used by cities on similar projects. We should be furnished a certified copy of such resolution as the City adopts in order to complete our files for the project. We would appreciate your attention to the execution of this agreement at your earliest convenience. In the event that any questions should arise in connection with the agreement or the plans, please feel free to contact Mr. R. W. Wall , Division Engineer, State Highway Commission, Salina, Kansas, or this office. Very truly yours, Jours W. H. 0 n, P. E. Engineer of Urban Highways WHO:KVS: dmr Enclosures cc: Mr. Robert A. Kent, State Highway Commissioner Mr. R. W. Wall , Division Engineer RESOLUTION NO. 3144 Be it Resolved by the Governing Body of the City of Salina: That the Mayor and City Clerk are authorized and directed to execute for and on behalf of the City of Salina, Kansas, Agreement No. 14-73M between the City and the State Highway Commission of Kansas, setting forth the responsibilities of the City and the State Highway Commission in connection with an improvement project for bridge repairs to the southbound structure over Mulberry Creek located about 998 feet south of the centerline of 1-70 highway on former Alternate US-81 highway, in accord with prior commitments of the State Highway Commission. The improvement project shall be known as Project No. ALT. 81-85 2992 (2) . Passed by the Commission. this it day of 621„* r , 19 73 (Approved) (Signed) i\` �JLL/' eCi ii/f t , , Mayor (SEACkj,N OF ' G 4� J ATtEST: s ',. /CU-�„„) r 03flhI24.'. CITY CLERK 0 1 1070 s - 4/ •