East Crawford & Fourth Street Crossing ImprovementsUNION PACIFIC RAILROAD
1400 Douglas Street Omaha, Nebraska 68179
February 24, 2015
David Kohart
City of Salina
300 W Ash
P.O. Box 736
Salina, KS 67402-0736
Subject:
City / State
Subdivision
Street
DOT
MP
Salina, KS
Sid Industrial Lead
E. Crawford / FAS 1
815057E
549.98
Dear David:
Enclosed is a fully executed agreement(s) for the above referenced location(s).
Sincerely,
Alisa Rangel
Sr. Engineering Services Admin
Enclosures
cc: Michael Benjamin
WWW uPcom BUILDING AMERICK
Public Road Improvements 08/24/07
Estimated Costs
Form Approved -AVP Law
IMPROVEMENTS TO EXISTING PUBLIC ROAD AT GRADE CROSSING
FOR EAST CRAWFORD STREET, DOT 815057E
M.P. 549.98 SID INDUSTRIAL LEAD
SALINA, KANSAS
THIS AGREEMENT, executed in duplicate thisff/4 of by and between
UNION PACIFIC RAILROAD COMPANY, a Delaware corporation ("Railroad4). and CITY OF
SALINA, a municipal corporation of the State of KANSAS ("Political Body").
RECITALS:
Political Body has requested Railroad to improve the existing East Crawford Street crossing, at
grade, along, over and across Railroad's track and right of way at Railroad Mile Post 54998, on Railroad's
SID hidustrial Lead, DOT No. 815057E, in City of Salina, Saline County, State of Kansas (the
"Crossing"), to which Railroad is agreeable, but solely upon terms and conditions hereinafter set forth.
The location of the Crossing is generally shown on the print marked Exhibit A, attached hereto
and hereby made a part hereof.
AGREEMENT:
NOW THEREFORE, in consideration of the premises and of the promises and conditions
hereinafter set forth, the parties hereto agree as follows:
1. Railroad shall furnish all labor, material, equipment and supervision for, and shall (a)
remove the existing timber crossing, (b) install 1 - 88 ft. precast concrete crossings, (c) field weld rail, (d)
relay track at the Crossing with 136 pound rail, (e) renew the crossties, and (f) surface the track with rleNv
ballast.
2. Political Body agrees to reimburse the Railroad for sixty five percent (65%) of Railroad's
actual labor and material costs associated with the work and materials described in Section I above.
Railroad estimates such cost to be Seventy Three Thousand Eight Hundred and Sixty Five Dollars
($73,865) , as set forth in Estimate of Material and Force Account dated January 30, 2015 marked Exhibit
B, hereto attached and hereby made a part hereof. During the performance of such work Railroad will
provide progressive billing to Political Body based on Railroad's actual costs. Actual costs to Railroad
shall include customary additives (which includes its overhead and indirect construction costs) to
materials, services and labor provided by Railroad. Within One Hundred Twenty (120) days after
Railroad has completed its work, Railroad will submit a final billing to Political Body for any balance
owed. Political Body shall pay Railroad within thirty (30) days of its receipt of progressive and final bills
submitted by Railroad.
3. Railroad, at its cost, shall maintain the Crossing between the track tie ends and Political
Body, at its cost, shall maintain all other portions of the Crossing. If, in the future, Political Body elects
to have the surfacing material between the track tie ends replaced with paving or some surfacing material
other than timber planking, Railroad, at the Political Body's expense, shall install such replacement
surfacing.
4. Political Body, at its cost, shall provide all labor, material and equipment associated with
traffic control, barricades, detour signing, advanced warning signs pavement markings and roadway
approach work. All such work shall be in compliance with the current Manual on Uniform Traffic
Control Devices.
RIKS PUBLIC PROIECTb &4t. Eaa C—NdSM37E Av..tad-
7
Public Road Improvements 08/24/07
Estimated Costs
Form Approved -AVP Law
5. If Political Body's contractor(s) is/are performing any work described in Section 4 above,
then Political Body sliall require its contractor(s) to execute Railroad's standard and current form of
Contractor's Right of Entry Agreement. Political Body acknowledges receipt of a copy of the
Contractor's Right of Entry Agreement and understanding of its terms, provisions, and requirements, and
will inform its contractor(s) of the need to execute the Agreement and to obtain and provide to Railroad
the insurance policies, binders, certificates and endorsements that are required in the Contractor's Right of
Entry Agreement. Under no circumstances will the Political Body's contractor(s) be allowed onto the
Railroad's premises without first executing the Contractor's Right of Entry Agreement and providing the
aforesaid insurance documents.
6. Fiber optic cable systems may be buried on Railroad's property. Protection of the fiber
optic cable systems is of extreme importance since any break could disrupt service to users resulting in
business interruption and loss of revenue and profits. Political Body or its contractors) shall telephone
Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Time, Monday through Friday,
except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for emergency calls) to
determine if fiber optic cable is buried anywhere on Railroad's premises to be used by Political Body or
its contractor(s). If it is, Political Body or its contactor(s) will telephone the telecommunications
company(ies) involved, arrange for a cable locator, and make arrangements for relocation or other
protection of the fiber optic cable prior to beginning any work on Railroad's premises.
7. Political Body, for itself and for its successors and assigns, hereby waives any right of
assessment against Railroad, as an adjacent property owner, for any and all improvements made under
this Agreement.
8. Covenants herein shall inure to or bind each party's successors and assigns; provided, no
right of Political Body shall be transferred or assigned, either voluntarily or involuntarily, except by
express written agreement acceptable to Railroad.
9. Political Body hereby confirms that funds have been appropriated for the work set forth
in this Agreement.
10. The person signing this Agreement on behalf of Political Body hereby confirms that
he/she is authorized under Political Body policies and procedures to execute this Agreement and to bind
Political Body to the obligations under this Agreement.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date
first herein written.
UNION PACIFIC RAILROAD COMPANY
Tit *:4hn By
•• -n
• •
H 1XS PUBLIC PAOOCTSMh'a Fut 0.,fo d3I5P5IF. AS+K_Y E.�c
EXHIBIT "B"
DATE: 2015-01-30
ESTIMATE OF MATERIAL AND FORCE ACCOUNT
WORK
BY THE
UNION PACIFIC RAILROAD
THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION
DATE IS
:2015-07-31
DESCRIPTION OF WORK:
2015 RECOLLECT PROGRAM
SID INDUSTRIAL LEAD
MP 549.98 DOT Y 815057E E CRAW FORD / FAS 1
INSTALL 88 TF OF CROSSING SURFACE INCLUDING
TIES,RAIL,OTM
PROJECT TO BE FUNDED 65% CITY
OF SALINA AND
356 UPRR
PID: 90621 AWO:
MP,SUBDIV:
549.97, SID
SERVICE UNIT: 14 CITY: WESLEYAN
STATE:
KS
DESCRIPTION QTY UNIT LABOR MATERIAL RECOLL-
UPRR-
TOTAL
ENGINEERING WORK
3994
2596
1398
3994
ENGINEERING
9345
6074
3271
9345
LABOR ADDITIVE 234%
--------
--------
----
TOTAL ENGINEERING
-------
13339
8670
4669
13339
SIGNAL WORK
1889
1227
662
1889
LABOR ADDITIVE 2348
807
5
527
285
812
SIGNAL
--------
------
TOTAL SIGNAL
2696
5
1754
947
2701
TRACK & SURFACE WORK
7
1833
1196
644
1840
BALAST 2.00
CL
900
585
315
900
BILL PREP FEE
19000
12350
6650
19000
CONTRACT APPROCH WORK
6
4
10
ENVIRONMENTAL PERMIT
10
3
2
5
FIELD WELD
5
1342
872
470
1342
FOREIGN LINE FREIGHT
900
585
315
900
HOMELINE FREIGHT
16964
11029
5935
16964
LABOR ADDITIVE 234%
785
509
276
785
14ATL STORE EXPENSE
816
11736
8158
4394
12552
OTT
240.00
LF 2681
4706
4802
2585
7387
RAIL
88.00
TF 963
20222
13770
7415
21185
RDXING
1748
1136
612
1748
SALES TAX
66.00
EA 3093
4505
4939
2659
7598
SWTIE
3337
2169
1168
3337
TRK-SURF,LIN
912
757
1084
585
1669
WELD
EA 381
248
133
381
XTIE
--------
--------
TOTAL TRACK & SURFACE
-29159
68444
63441
34162
97603
LABOR/MATERIAL EXPENSE
45194
68449--------
RECOLLECTIBLE/UPRR EXPENSE
73865
39778 --1136--
ESTIMATED PROJECT COST
113643
EXISTING REUSEABLE MATERIAL
CREDIT
0
SALVAGE NONUSEABLE MATERIAL
CREDIT
0
RECOLLECTIBLE LESS CREDITS
THE ABOVE FIGURES ARE ESTIMATES
ONLY AND SUBJECT
TO FLUCTUATION. IN THE
EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY
OF MATERIAL
OR
LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS
AT THE CURRENT
EFFECTIVE RATE.
RESOLUTION NUMBER 15-7176
A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT WITH
UNION PACIFIC RAILROAD TO PERFORM AT -GRADE PUBLIC ROAD CROSSING
IMPROVEMENTS ON EAST CRAWFORD STREET.
BE IT RESOLVED by the Governing Body of the City of Salina, Kansas:
Section 1. The Mayor is hereby authorized to execute an agreement with Union Pacific Railroad to
perform at -grade public road crossing improvements on East Crawford Street, subject to the terms and
conditions of the agreement.
Section 2. The City Clerk is hereby directed to file the original agreement and retain according to the
City of Salina Records Management Policy.
Section 3. That this resolution shall be in full force and effect from pid'aX its adoption.
Adopted by the Board of Commissioners and signed by the lwyor JXfs 9`h day of February, 2015.
/Aaron. Householter, Mayor
(SEAL)
ATTEST:
Shandi Wicks, CMC, City Clerk
I hereby certify that the above and foregoing is a true
and correct copy of Resolution No. 15-7176 that was
adopted by the Governing Body of the City of Salina
at heir r ular meeting on February 9, 2015.
no,"OFV
Miki rr-Muths.
Administrativc Assistant III '� �