Rehabilitation of a Federal Flood Control Work (2)ATTENTION OF:
Civil Branch
DEPARTMENT OF THE ARMY
KANSAS CITY DISTRICT, CORPS OF ENGINEERS
635 FEDERAL BUILDING
KANSAS CITY, MISSOURI 64106-2896
November 25, 2014
SUBJECT: Transmittal of Executed Cooperation Agreement for the Salina Flood Control Works
Rehabilitation Project
City of Salina
Attn: Mr. Wayne Nelson
300 West Ash
Salina, Kansas 67402-0736
Dear Mr. Nelson:
Enclosed is your executed copy of the Cooperation Agreement as sponsor for the Salina
Flood Control Works Rehabilitation project,
Thank you for your cooperation in this matter. If you have any questions, please telephone
Karl Mueller at 816-389-3764.
Sincerely,
Patty Richardson
Team Leader, Civil Branch
Real Estate Division
Enclosure
COOPERATION AGREEMENT
BETWEEN
THE UNITED STATES OF AMERICA
and
THE CITY OF SALINA, KANSAS
for
REHABILITATION OF A FEDERAL FLOOD CONTROL WORK
THIS AGREEMENT, entered into this 2191day of NA0\/e_VV6Ef- , 2014 by and
between THE DEPARTMENT OF THE ARMY (hereinafter referred to as the
"Government") represented by the District Engineer, Kansas City District, U.S. Army
Corps of Engineers, and the CITY OF SALINA, KANSAS, (hereinafter referred to as the
"Public Sponsor"), represented by the CITY MANAGER.
WITNESSETH THAT:
WHEREAS, the Government constructed a flood control project (hereinafter
referred to as the project) authorized by the Flood Control Act of 1954 and governed by
an Agreement of Local Assurances dated May 8th, 1956, and entitled Resolution
Number 1687, and which remains in full effect;
WHEREAS, pursuant to 33 U.S.C. 701 n, the Government is authorized to assist
in the repair or restoration of flood control improvements threatened or destroyed by
floods;
WHEREAS, via written correspondence, the Public Sponsor has requested that
the Government repair or restore the project, which was damaged by recent flooding or
coastal storms, in accordance with 33 U.S.C. 701 n and established policies of the U.S.
Army Corps of Engineers; and,
WHEREAS, Public Sponsor hereby represents that it has the authority and legal
capability to furnish the non -Federal cooperation hereinafter set forth and is willing to
participate in the rehabilitation effort of the authorized project in accordance with the
terms of this Agreement;
NOW, THEREFORE, the Government and the Public Sponsor agree as follows:
Page 1 of 12
ARTICLE I - DEFINITIONS AND GENERAL PROVISIONS
For purposes of this agreement:
A. The term "Rehabilitation Effort" shall mean to construct a new reinforced
concrete cutoff wall upstream of the existing scour key and to stabilize the bank at the
intersection of Gypsum Avenue and Iowa Avenue with a combination of soil nail
reinforced slope and riprap, as generally described in the Project Information Report,
Rehabilitation of the Salina, Kansas, Flood Protection Project, dated 18 March, 2014,
and approved by the Division Engineer on 20 May, 2014. See attached Exhibit "A" for a
complete listing of repair work to be done.
B. The term "Rehabilitation Effort costs" shall mean all costs incurred by the
Public Sponsor and the Government, in accordance with the terms of this Agreement,
directly related to implementation of the Rehabilitation Effort. The term shall include,
but is not necessarily limited to: actual construction costs, including supervision and
inspection costs; costs of contract dispute settlements or awards; and the cost of
investigations to identify the existence of hazardous substances as identified in Article
XIIA. The term shall not include any costs for operation and maintenance; any costs to
correct deferred or deficient maintenance; any costs for betterments; any costs for
Public Sponsor -preferred alternatives; or the costs of lands, easements, rights-of-way,
relocations, or suitable borrow and dredged or excavated material disposal areas
required for the Rehabilitation Effort.
C. The term "betterment" shall mean the design and construction of a feature
accomplished on behalf of, or at the request of, the Public Sponsor in accordance with
standards that exceed the standards that the Government would otherwise apply for
accomplishing the Rehabilitation Effort.
ARTICLE II - OBLIGATIONS OF THE GOVERNMENT AND PUBLIC SPONSOR
A. The Government, subject to receiving funds appropriated by the Congress of
the United States, and using those funds shall expeditiously implement the
Rehabilitation Effort, applying those procedures usually followed or applied in
Government construction of Federal projects, pursuant to Federal laws, regulations,
and policies. The Public Sponsor shall be afforded the opportunity to review and
comment on solicitations for all contracts, including relevant plans and specifications,
prior to the issuance of such solicitations. The Contracting Officer will, in good faith,
consider the comments of the Public Sponsor, but award of contracts, modifications or
change orders, and performance of all work on the Rehabilitation Effort (whether the
work is performed under contract or by Government personnel), shall be exclusively
within the control of the Contracting Officer.
Page 2 of 12
B. As further specified in Article III, the Public Sponsor shall provide all lands,
easements, and rights-of-way, including suitable borrow and dredged or excavated
material disposal areas, and perform all relocations determined by the Government to
be necessary for construction, operation, and maintenance of the Project and the
Rehabilitation Effort.
C. As further specified in Article IV, the Public Sponsor shall contribute, in cash,
in-kind services, or a combination thereof, a contribution toward construction of the
Rehabilitation Effort in an amount equal to $00.00 towards the total Rehabilitation Effort
costs.
D. The Public Sponsor shall not use Federal funds to meet its share of total
Rehabilitation Effort costs under this Agreement unless the Federal granting agency
verifies in writing that the expenditure of such funds is authorized by statute.
.E. The Public Sponsor shall hold and save the Government free from all
damages arising from the construction, operation, and maintenance of the
Rehabilitation Effort and any authorized project -related betterments, except for
damages due to the fault or negligence of the Government or the Government's
contractors.
F. The Public Sponsor agrees to continue to participate in and comply with the
policies and procedures of the U.S. Army Corps of Engineers Rehabilitation and
Inspection Program, and of Title 33, Code of Federal Regulations, Part208.10 (33 CFR
208.10).
G. The Public Sponsor may request the Government to accomplish betterments.
The Public Sponsor shall be solely responsible for any increase in costs resulting from
the betterments and all such increased costs will be paid in advance by the Public
Sponsor in accordance with Article IV.
ARTICLE III - LANDS, RELOCATIONS, DISPOSAL AREAS, AND
PUBLIC LAW 91-646
A. The Government shall provide the Public Sponsor with a description of the
anticipated real estate requirements and relocations for the Rehabilitation Effort.
Thereafter, the Public Sponsor shall furnish all lands, easements, and rights-of-way,
including suitable borrow and dredged or excavated material disposal areas, and
perform any relocations, as may be determined by the Government in that description,
or in any subsequent description, to be necessary for the construction, operation, and
maintenance of the Rehabilitation Effort and the authorized project. The necessary
lands, easements, and rights-of-way may be provided incrementally for each
Page 3 of 12
construction contract. All lands, easements, and rights-of-way determined by the
Government to be necessary for work to be performed under a construction contract
must be furnished prior to the advertisement of that construction contract.
B. The Public Sponsor shall comply with the applicable provisions of the Uniform
Relocation Assistance and Real Property Acquisitions Policy Act of 1970, Public Law
91-646, as amended by Title IV of the Surface Transportation and Uniform Relocation
Assistance Act of 1987 (Public Law 100-17), and the Uniform Regulations contained in
49 CFR Part 24, in acquiring lands, easements, and rights of way, required for
construction, operation, and maintenance of the Rehabilitation Effort, including those
necessary for relocations, borrow materials, and dredged or excavated material
disposal, and shall inform all affected persons of applicable benefits, policies, and
procedures in connection with said Act.
ARTICLE IV - METHOD OF PAYMENT
A. The Public Sponsor shall provide, during the period of construction, cash
payments, in-kind services, or a combination thereof, required to meet the Public
Sponsor's obligations under Article II of the Agreement. Rehabilitation Effort costs are
currently estimated to be $883,344.00 and the Public Sponsor's share (cash and
services in kind) of total Rehabilitation Effort costs is currently estimated to be $00.00.
In order to meet Public Sponsor's cash payment requirements, the Public Sponsor must
provide a cash contribution estimated to be $00.00. The dollar amounts set forth in this
paragraph are based upon the Government's best estimates that reflect projections of
costs, price level changes, and anticipated inflation. Such cost_ estimates are subject to
adjustments based upon costs actually incurred and are not to be construed as the total
financial responsibilities of the Government and the Public Sponsor.
B. The required cash contribution shall be provided as follows: At least ten
calendar days prior to the award of the first construction contract, the Government shall
notify the Public Sponsor of the Public Sponsor's estimated share of the total
Rehabilitation Effort costs including the Public Sponsor's estimated share of the costs
attributable to the Rehabilitation Effort incurred prior to. the initiation of construction.
Within five calendar days thereafter, the Public Sponsor shall provide the Government
the full amount of the required contribution by wire transfer, Electronic Funds Transfer,
or by delivering a check payable to "FAO, USAED-Kansas City" to the Contracting
Officer representing the Government. The Government shall draw on the funds
provided by the Public Sponsor such sums as the Government deems necessary to
cover contractual and in-house fiscal obligations attributable to the Rehabilitation Effort
as.they are incurred, as well as Rehabilitation Effort costs incurred by the Government.
In the event that total Rehabilitation Effort costs are expected to exceed the estimate
given at the outset of construction, the Government shall immediately notify the Public
Sponsor of the additional contribution the Public Sponsor will be required to make to
meet the Public Sponsor's share of the revised estimate. Within ten calendar days
Page 4 of 12
thereafter, the Public Sponsor shall provide the Government the full amount of the
additional required contribution.
C. During the period of construction, the Government will provide periodic
financial reports on the status of the total Rehabilitation Effort costs and status of
contributions made by the Public Sponsor. Upon completion of the Rehabilitation Effort
and resolution of all relevant contract claims and appeals, the Government shall
compute the total Rehabilitation Effort costs and tender to the Public Sponsor a final
accounting of the Public Sponsor's share of Rehabilitation Effort costs.
1. In the event the total contribution by the Public Sponsor is less than the
Public Sponsor's required share of total Rehabilitation Effort costs, the Public Sponsor
shall, no later than 90 calendar days after receipt of written notice, make a cash
payment to the Government of whatever sum is required to meet the Public Sponsor's
required share of the total Rehabilitation Effort costs.
2. In the event total contribution by the Public Sponsor is more than the Public
Sponsor's required share of total Rehabilitation Effort costs, the Government shall, no
later than 90 calendar days after the final accounting is complete, subject to the
availability of funds, return the excess to the Public Sponsor; however, the Public
Sponsor shall not be entitled to any refund for in-kind services. In the event the existing
funds are not available to repay the Public Sponsor for excess contributions provided,
the Government shall seek such appropriations as are necessary to repay the Public
Sponsor for excess contributions provided.
ARTICLE V — CREDITING OF IN-KIND SERVICES
The Government has approved a credit for In -Kind Services, compatible with the
Rehabilitation Effort, in the estimated amount of $0.00 for implementation of such
services by the Public Sponsor. The affording of such credit shall be subject to an
onsite inspection by the Government to verify that the work was accomplished in a
satisfactory manner and is suitable for inclusion in the Rehabilitation Effort. The actual
amount of such credit shall be subject to an audit conducted to determine
reasonableness, allocability, and allowability of costs. The Government shall apply the
credit amount toward any additional cash contribution required under this Agreement.
The Public Sponsor shall not receive credit for any amount in excess of such additional
cash contribution, nor shall the Public Sponsor be entitled to any reimbursement for any
excess credit amount.
ARTICLE VI - OPERATION AND MAINTENANCE
A. After the Contracting Officer has determined that construction of the
Rehabilitation Effort is complete and provided the Public Sponsor with written notice of
such determination, the Public Sponsor shall continue to operate and maintain the
Page 5 of 12
completed Rehabilitation Effort as part of the project, at no cost to the Government, in
accordance with specific directions prescribed by the Government in Title 33, Code of
Federal Regulations, Part 208.10, Engineer Regulation 500-1-1, and any subsequent
amendments thereto.
B. The Public Sponsor hereby gives the Government a right to enter, at
reasonable times and in a reasonable manner, upon land that the Public Sponsor owns
or controls for access to the Project for the purposes of inspection, and, if necessary,
for the purpose of completing, operating, and maintaining the Project. If an inspection
shows the Public Sponsor for any reason is failing to fulfill the Public Sponsor's
obligations under this Agreement without receiving prior written approval from the
Government, the Government will send a written notice to the Public Sponsor. If, after
30 calendar days from receipt of such notice, the Public Sponsor continues to fail to
perform, then the Government shall have the right to enter, at reasonable times and in
a reasonable manner, upon lands the Public Sponsor owns or controls for access to the
authorized project for the purposes of completing, operating, and maintaining the
project. No action by the Government shall operate to relieve the Public Sponsor of
responsibility to meet the Public Sponsor obligations as set forth in this Agreement, or
to preclude the Government from pursuing any other remedy at law or equity to assure
faithful performance pursuant to this Agreement.
ARTICLE VII - FEDERAL AND STATE LAWS
In the exercise of the Public Sponsor's rights and obligations hereunder, the
Public Sponsor agrees to comply with all applicable Federal and state laws and
regulations.
ARTICLE VIII - RELATIONSHIP OF PARTIES
The Government and the Public Sponsor act in an independent capacity in the
performance of their respective functions under this Agreement, and neither party is to
be considered the officer, agent, nor employee of the other.
ARTICLE IX - OFFICIALS NOT TO BENEFIT
No member of or delegate to the Congress, or resident commissioner, shall be
admitted to any share or part of this Agreement, or to any benefit that may arise
therefrom.
ARTICLE X - COVENANT AGAINST CONTINGENT FEES
The Public Sponsor warrants that no person or selling agency has been
employed or retained to solicit or secure this Agreement upon agreement or
understanding for a commission, percentage, brokerage, or contingent fee, excepting
Page 6 of 12
bona fide employees or bona fide established commercial or selling agencies
maintained by the Public Sponsor for the purpose of securing business. For breach or
violation of this warranty, the Government shall have the right to annul this Agreement
without liability, or, in the Government's discretion, to add to the Agreement or
consideration, or otherwise recover, the full amount of such commission, percentage,
brokerage, or contingent fee.
ARTICLE XI - TERMINATION OR SUSPENSION
If at any time the Public Sponsor fails to carry out its obligations under this
Agreement, the District Engineer shall terminate or suspend work on the Rehabilitation
Effort, unless the District Engineer determines that continuation of work on the
Rehabilitation Effort is in the interest of the United States or is necessary in order to
satisfy agreements with any other non -Federal interests in connection with this
Rehabilitation Effort. However, deferral of future performance under this Agreement
shall not affect existing obligations or relieve the parties of liability for any obligation
previously incurred. In the event that either party elects to terminate this Agreement
pursuant to this Article, both parties shall conclude their activities relating to the
Rehabilitation Effort and proceed to a final accounting in accordance with Article IV of
this Agreement. In the event that either party elects to defer future performance under
this Agreement pursuant to this Article, such deferral shall remain in effect until such
time as either the Government or Public Sponsor elects to proceed with further
construction or terminates this Agreement.
ARTICLE XII - HAZARDOUS SUBSTANCES
A. After execution of this Agreement and upon direction by the Contracting
Officer, the Public Sponsor shall perform, or cause to be performed, such investigations
for hazardous substances as are determined necessary by the Government or the
Public Sponsor to identify the existence and extent of any hazardous substances
regulated under the Comprehensive Environmental Response, Compensation, and
Liability Act (CERCLA) 42 U.S.C. Sections, 9601-9675, on lands necessary to
Rehabilitation Effort construction, operation, and maintenance. All actual costs incurred
by the Public Sponsor that are properly allowable and allocable to performance of any
such investigations for hazardous substances shall be included in Rehabilitation Effort
costs and cost shared as a construction cost.
B. In the event it is discovered through an investigation for hazardous
substances or other means that any lands, easements, rights-of-way, or disposal areas
to be acquired or provided for the Rehabilitation Effort contain any hazardous
substances regulated under CERCLA, the Public Sponsor and the Government shall
provide prompt notice to each other, and the Public Sponsor shall not proceed with the
acquisition of lands, easements, rights-of-way, or disposal areas until mutually agreed.
Page 7 of 12
C. The Government and the Public Sponsor shall determine whether to initiate
construction of the Rehabilitation Effort, or, if already in construction, to continue with
construction of the Rehabilitation Effort, or to terminate construction of the
Rehabilitation Effort for the convenience of'the Government in any case where
hazardous substances regulated under CERCLA are found to exist on any lands
necessary for the Rehabilitation Effort and the authorized Project. Should the
Government and the Public Sponsor determine to proceed or continue with the
construction after considering any liability that may arise under CERCLA, the Public
Sponsor shall be responsible, as between the Government and the Public Sponsor, for
any and all necessary clean up and response costs, to include the costs of any studies
and investigations necessary to determine an appropriate response to the
contamination. Such costs shall not be considered a part of the total Rehabilitation
Effort costs as defined in this Agreement. In the event the Public Sponsor fails to
provide any funds necessary to pay for clean up and response costs or to otherwise
discharge the Public Sponsor's responsibilities under this paragraph upon direction by
the Government, the Government may either terminate or suspend work on the
Rehabilitation Effort, or proceed with further work as provided in Article XI of this
Agreement.
D. The Public Sponsor and Government shall consult with each other to assure
that responsible parties bear any necessary clean up and response costs as defined in
CERCLA. Any decision made pursuant to paragraph C of this Article shall not relieve
any party from any liability that may arise under CERCLA.
E. As between the Government and the Public Sponsor, the Public Sponsor
shall be considered the operator of the Project (which the Rehabilitation Effort is
repairing and restoring) for purposes of CERCLA liability. To the maximum extent
practicable, the Public Sponsor shall operate and maintain the authorized project in a
manner that will not cause liability to arise under CERCLA.
ARTICLE XIII - NOTICES
A. All notices, requests, demands, and other communications required or
permitted to be given under this Agreement shall be deemed to have been duly given if
in writing and delivered personally or mailed by first-class (postage prepaid), registered,
or certified mail, as follows:
If to the Public Sponsor:
Jason A. Gage, City Manager
City of Salina, Kansas
300 W. Ash St, P.O. 736
Salina, KS 67402-0736
If to the Government:
District Engineer
Kansas City District, Corps of Engineers
601 E. 12th Street, 635 Federal Building
Kansas City, Missouri 64106-2896
Page 8 of 12
B. A party may change the address to which such communications are to be
directed by giving written notice to the other party in the manner provided in this Article.
C. Any notice, request, demand, or other communication made pursuant to this
Article shall be deemed to have been received by the addressee at such time as it is
either personally delivered, or, seven calendar days after it is mailed, as the case may
be.
IN WITNESS HEREOF, the parties hereto have executed this Agreement, which shall
become effective upon the date it is signed by the District Engineer.
THE DEPARTMENT OF THE ARMY THE CITY OF SALINA, KANSAS
or
BY: BY:
Andrew D. Sexton
Colonel, Corps of Engineers
District Commander
DATE: vP I �JOVI!y
Qzz,-O, - .0-
ason A. Gage
City Manager
City of %Salina, Kansas
DATE: L-er I U , 2.01-1
Page 9 of 12
CERTIFICATE OF AUTHORITY
I, Greg A. Bengtson, do hereby certify that I am the principal legal officer of the City of
Salina, Kansas and it is a legally constituted public body with full authority and legal
capability to perform the terms of the Agreement between the Department of the Army
and the City of Salina, Kansas in connection with the Rehabilitation Effort, and to pay
damages, if necessary, in the event of the failure to perform, in accordance with Section
221 of Public Law 91-611, and that the person who has executed this Agreement on
behalf of the City of Salina, Kansas has acted within his statutory authority.
IN WITNES§ HEREOF, I have made and executed this certification this
day of , 2014.
1 4Z
f:
doreA
A. B n tson
Page 10 of 12
CERTIFICATION REGARDING LOBBYING
The undersigned certifies, to the best of his or her knowledge and belief that:
(1) No Federal appropriated funds have been paid or will be paid, by or on
behalf of the undersigned, to any person for influencing or attempting to influence an
officer or employee of any agency, a Member of Congress, an officer or employee of
Congress, or an employee of a member of Congress in connection with the awarding of
any Federal contract, the making of any Federal grant, the making of any Federal loan,
the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any Federal contract, grant, loan, or
cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an officer or employee of
any agency, a Member of Congress, an officer or employee of Congress, or an
employee of a member of Congress in connection with this Federal contract, grant,
loan, or cooperative agreement, the undersigned shall complete and submit Standard
Form -LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
(3) The undersigned shall require that the language of this certification be
included in the award documents for. all subawards at all tiers (including subcontracts,
subgrants, and contracts under grants, loans, and cooperative agreements) and that all
subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was
placed when this transaction was made or entered into. Submission of this certification
is a prerequisite for making or entering into this transaction imposed by Section 1352,
Title 31, U.S. Code. Any person who fails to file the required certification shall be
subject to a civil penalty of not less than $10,000 and not more than $100,000 for each
such failure.
t�
DATED this I 0 day of 40V eve 6e J- , 2014.
Qi,t� . #-al�
J son A. Gage
City Manager
Page 11 of 12
REPAIR WORK DESCRIPTION
Summary of Salina, Kansas Flood Protection Rehabilitation Project:
The recommended course of action is to construct a new reinforced concrete cutoff wall
upstream of the existing scour key and to stabilize the bank at the intersection of
Gypsum Avenue and Iowa Avenue with a combination of soil nail reinforced slope and
riprap. The cost estimate for this repair action is $883,344.00 (including E&D & S&A
costs).
Exhibit "A"
Page 12 of 12