Ninth Street Crossing ImprovementsAugust 15, 2014
Dan Stack, P.E.
City of Salina
300 West Ash Street
P.O. Box 736
Salina, KS 67402-0736
RE: KS
Salina
9th Street
186.31
Salina Sub
818386N
Dear Dan:
Enclosed is a fully executed agreement for the above referenced location.
Sincerely,
Alisa Rangel
Sr. Engineering Services Admin
Enclosures
CC: Michael Benjamin
UNION PACIFIC RAILROAD Engineering Department 1400 Douglas Street Stop 0910 Omaha, Nebraska 68179
Public Road Improvements 08/24%07
Estimated Costs
Form Approved -AVP Law
IMPROVEMENTS TO EXISTING PUBLIC ROAD AT GRADE CROSSING
FOR 9T" STREET, DOT 818386N
M.P. 186.31 SALINA SUBDIVISION
SALINA, KANSAS
THIS AGREEMENT, executed in duplicate this day ofuS� 1�by and between
UNION PACIFIC RAILROAD COMPANY, a Delaware corporation "Railroad"), and CITY OF
SALINA, a municipal corporation of the State of KANSAS ("Political Body").
RECITALS:
Political Body has requested Railroad to improve the existing 9th Street crossing, at grade, along,
over and across Railroad's track and right of way at Railroad Mile Post 186.31, on Railroad's Salina
Subdivision, DOT No. 818386N, in City of Salina, Saline County, State of Kansas (the "Crossing"), to
which Railroad is agreeable, but solely upon terms and conditions hereinafter set forth.
The location of the Crossing is generally shown on the print marked Exhibit A, attached hereto
and hereby made a part hereof.
AGREEMENT:
NOW THEREFORE, in consideration of the premises and of the promises and conditions
hereinafter set forth, the parties hereto agree as follows:
1. Railroad shall furnish all labor, material, equipment and supervision for, and shall (a)
remove the existing timber crossing, (b) install 3 - 80 ft. precast concrete crossings, (c) field weld rail, (d)
relay track at the Crossing with 136 pound rail, (e) renew the crossties, and (f) surface the track with new
ballast.
2. Political Body agrees to reimburse the Railroad for fifty percent (50%) of Railroad's
actual labor and material costs associated with the work and materials described in Section 1 above.
Railroad estimates such cost to be One Hundred Thirty Seven Thousand Five Hundred and Thirty Eight
Dollars (S137,538.00), as set forth in Estimate of Material and Force Account dated May 21, 2014
marked Exhibit B, hereto attached and hereby made a part hereof. During the performance of such work
Railroad will provide progressive billing to Political Body based on Railroad's actual costs. Actual costs
to Railroad shall include customary additives (which includes its overhead and indirect construction
costs) to materials, services and labor provided by Railroad. Within One Hundred Twenty (120) days
after Railroad has completed its work, Railroad will submit a final billing to Political Body for any
balance owed. Political Body shall pay Railroad within thirty (30) days of its receipt of progressive and
final bills submitted by Railroad.
DanavoH 14f�d�o
3. Railroa0;iat,•;fs ostAshall maintain the Crossing between the track tie ends and Political
Body, at its cost, shall maintain all other portions of the Crossing. If, in the future, Political Body elects
to have the surfacing material between the track tie ends replaced with paving or some surfacing material
other than timber planking, Railroad, at the Political Body's expense, shall install such replacement
surfacing.
4. Political Body, at its cost, shall provide all labor, material and equipment associated with
traffic control, barricades, detour signing, advanced warning signs and pavement markings. All such
work shall be in compliance with the current Manual on Uniform Traffic Control Devices.
HAKS PUBLIC PROJECMSalina 9th SvmW8386N Agree mt.dw
Public Road Improvements 08/24/07
Estimated Costs
Form Approved -AVP Law
5. If Political Body's contractor(s) is/are performing any work described in Section 4 above,
then Political Body shall require its contractor(s) to execute Railroad's standard and current form of
Contractor's Right of Entry Agreement. Political Body acknowledges receipt of a copy of the
Contractor's Right of Entry Agreement and understanding of its terms, provisions, and requirements, and
will inform its contractor(s) of the need to execute the Agreement and to obtain and provide to Railroad
the insurance policies, binders, certificates and endorsements that are required in the Contractor's Right of
Entry Agreement. Under no circumstances will the Political Body's contractor(s) be allowed onto the
Railroad's premises without first executing the Contractor's Right of Entry Agreement and providing the
aforesaid insurance documents.
6. Fiber optic cable systems may be buried on Railroad's property. Protection of the fiber
optic cable systems is of extreme importance since any break could disrupt service to users resulting in
business interruption and loss of revenue and profits. Political Body or its contractor(s) shall telephone
Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Time, Monday through Friday,
except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for emergency calls) to
determine if fiber optic cable is buried anywhere on Railroad's premises to be used by Political Body or
its contractor(s). If it is, Political Body or its -contactor(s) will telephone the telecommunications
company(ies) involved, arrange for a cable locator, and make arrangements for relocation or other
protection of the fiber optic cable prior to beginning any work on Railroad's premises.
7. Political Body, for itself and for its successors and assigns, hereby waives any right of
assessment against Railroad, as an adjacent property owner, for any and all improvements made under
this Agreement.
8. Covenants herein shall inure to or bind each party's successors and assigns; provided, no
right of Political Body shall be transferred or assigned, either voluntarily or involuntarily, except by
express written agreement acceptable to Railroad.
9. Political Body hereby confirms that funds have been appropriated for the work set forth
in this Agreement.
10. The person signing this Agreement on behalf of Political Body hereby confirms that
he/she is authorized under Political Body policies and procedures to execute this Agreement and to bind
Political Body to the obligations under this Agreement.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date
first herein written.
UNION PACIFIC RAILROAD COMPANY,
By
Tid
7J
CITY OF SALIN
By
Title:
HAKS PUBLIC PROIGCTS\.Salina 9th Stred\8I8386N Agcemmt.dm 2
—I-
z TI -
o
N
i C
X 2'
Lu
c�
m
co
co
(0�
00 00
�
p
U—UYrn20
z TI -
o
N
i C
X 2'
Lu
f
EXHIBIT
"B"
DATE:
2014-05-21
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD
THIS ESTIMATE GOOD FOR 6 MONTHS
EXPIRATION DATE
IS :2014-11-19
DESCRIPTION OF WORK:
2014 RECOLLECTIBLE PROGRAM
SALINA SUBDIVISION
MP 186.31 DOT # 818386N 9TH STREET
INSTALL 3- 80 TF CROSSING SURFACES INCLUDING
TIES,RAIL,OTM
PROJECT TO BE FUNDED 50% CITY OF
SALINA AND 50% UPRR
PID: 85757 AWO:
MP,SUBDIV: 186.19,
SALINA
SERVICE UNIT: 14 CITY: EAST
SALINA
STATE: KS
DESCRIPTION QTY UNIT
----------- --- ----
LABOR MATERIAL
-------------
RECOLL
-------
UPRR
-----
TOTAL
-----
ENGINEERING WORK
ENGINEERING
9041
4520
4521
9041
LABOR ADDITIVE 211°%
19076
9538
9538
19076
TOTAL ENGINEERING
28117
14058
14059
28117
SIGNAL WORK
LABOR ADDITIVE 211°%
3192
1596
1596
3192
SIGNAL
1512
15
763
764
1527
TOTAL SIGNAL
------- --------
4704
15
-------- --------
2359
--------
2360
4719
TRACK & SURFACE WORK
BALAST 3.00 CL
19
2727
1372
1374
2746
BILL PREP FEE
900
450
450
900
DRAINAGE CONTRACT
6000
3000
3000
6000
ENVIROMENTAL PERMIT
10
5
5
10
EQUIPMENT RENTAL
3000
1500
1500
3000
FIELD WELD
15
7
8
15
FOREIGN LINE FREIGHT
3625
1812
1813
3625
HOMELINE FREIGHT
900
450
450
900
LABOR ADDITIVE 211%
30606
15300
15306
30606
MATL STORE EXPENSE
2375
1186
1189
2375
OTM
1633
36430
19028
19035
38063
RAIL 720.00 LF
5365
15118
10240
10243
20483
RDXING 240.00 TF
1926
56926
29425
29427
58852
ROADWAY APPROACH
30000
15000
15000
30000
SALES TAX
5051
2523
2528
5051
SAW CUT STREET APPROACH
1500
750
750
1500
SWTIE 183.00 EA
6186
12934
9559
9561
19120
TRAFFIC CONTROL
7500
3750
3750
7500
TRK-SURF,LIN
6675
3337
3338
6675
WELD
1824
2268
2046
2046
4092
XTIE EA
762
381
381
762
TOTAL TRACK & SURFACE
------- --------
55011
187264
-------- --------
121121
--------
121154
242275
LABOR/MATERIAL EXPENSE
---------------
87832
187279
-----
RECOLLECTIBLE/UPRR EXPENSE
137538
137573 --------
ESTIMATED PROJECT COST
275111
EXISTING REUSEABLE MATERIAL CREDIT
0
SALVAGE NONUSEABLE MATERIAL CREDIT
0
RECOLLECTIBLE LESS CREDITS
THE ABOVE FIGURES ARE ESTIMATES ONLY
AND SUBJECT
TO
FLUCTUATION.
IN THE
EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY
OF MATERIAL
OR
LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS
AT THE
CURRENT EFFECTIVE
RATE.