We received final plans and specifications on the above subject
project at 4:00 P.M. today. These plans were for the Santa Fe Avenue
improvements from Ash Street to Mulberry Street, which we shall refer
to as Phase I. We will have these documents reviewed and be ready to
report on our findings at the City Commission Meeting on June 9, 1975.
As you know, the detailed plans and specifications for the
improvements to be made on Fifth Street and Seventh Street, which we
shall refer to as Phase II, have not been prepared. I have received
three (3) copies, attached hereto, of a proposed contract from
White', Hamele, and Hunsley to prepare these plans and specifications.
This company is the engineering consultants that prepared the Phase I,
Santa Fe Avenue plans. This proposed contract contains the same fee
schedule as the Phase I contract, except with a reduced maximum fee.
I see nothing wrong with this contract and would suggest its approval
on Monday so the plans and specifications can be completed for the
Downtown Beautification Project.
We are in the process of checking the validity of the petition
submitted on the above subject project. This report will also be
completed in time for the City Commission Meeting on June 9, 1975.
Respectfully submitted,
Dean Boyer .' ~
DB:MKP
ENC: (3)
DOWNTOWN BEAUTIFICATION PROJECT
PHASE II
AGREEMENT FOR ENGINEERING SERVICES
THIS CONTRACT, herein called the "CONTRACT", dated the day of June,
1975, by and between the City of Salina, State of Kansas, herein called the
"CITY", and White, Hamele & Hunsley, a partnership consisting of Kenneth N.
White and Harry L. Hunsley, doing business as consulting engineers and plan-
ners of the City of Salina, State of Kansas, herein called the "CONSULTANT".
WHEREAS, the CITY desires to engage the CONSULTANT to render certain engi-
neering services to the CITY.
NOW, THEREFORE, the parties mutually agree.
SCOPE OF SERVICES: The CONSULTANT shall perform the following
services in order to prepare and complete the plans and speci-
fications for improvements on Fifth Street and Seventh Street
from Mulberry Street to Ash Street in Salina, Kansas, including
coordination of utility improvements as follows:
item I. All necessary survey, topography and location of existing
conditions shall be performed by the CONSULTANT. The survey will
be taken to insure all existing conditions are taken into consid-
eration in final design.
Item II. Final Design~ Final 'plans and specifications shall be
prepared by the CONSULTANT ready 'for bid letting. Final plans
will include street improvements, landscaping and the related
incidentals such as lighting, benches, planters, etc., which
will be proposed for construction by the CITY.
The CONSULTANT shall perform additional services following com-
pletion of the plans and specifications, as follows:
Item III. Upon completion of final plans, the CONSULTANT shall
assist the CITY in developing the contract documents and supply
necessary information to obtain and evaluate bids.
Item IV. Construction Staking. The Contractor shall be respon-
sible for laying out and setting stakes for construction. The
city engineering department shall provide for inspection of the
construction. The CONSULTANT shall advise and coordinate with
the CITY on problems, changes or revisions required during con-
struction.
-1-
COMPENSATION: For the aforesaid services the CONSULTANT shall be
compensated in a sum not to exceed $9,500 in accordance with the
following schedule.
$ 0 - $ 29,999 --- 12.0%
30,000 - 49,999 --- 11.0%
50,000 - 99,999 --- 9.5%
100,000 - 149,999 --- 9.0%
150,000 - 174,999 --- 8.7%
175,000 - 199,999 ---'8.5%
200,000 - 249,999 --- 8.3%
250,000 - 300,000 --- 8.0%
The fee shall be based upon the construction cost of the improve-
ments, for which the CONSULTANT provided the design; and, shall
be paid 90% upon completion of the plans and specifications and
5% upon completion of letting of bids and 5% upon final inspec-
tion of the completed project by the CONSULTANT hereunder.
e
TIME OF PERFORMANCE: The services are to commence forthwith and
to be completed within 30 days from the date of this contract.
PREVAILING SALARIES: Not less' than the respective salaries in
the locality as determined pursuant to the attached "Determina-
tion of Prevailing Salaries of Technical Positions" shall be paid
to persons in the respective occupations listed therein employed
in the performance of work under this CONTRACT.
.5.
NON-DISCRIMINATION: During the performance of this CONTRACT, the
CONSULTANT agrees that he will not discriminate against any em-
ployee or applicant for employment because of race, creed, color
or.national origin. The CONSULTANT will take affirmative action
to ensure that applicants are employed, and that employees are
treated during employment without regard to their race, creed,
color or national origin. Such'action shall include, but not
be limited to the following: Employment, upgrading, demotion,
or transfer, recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and
selecting for'training, including apprenticeship. The CONSULTANT
agrees to post in conspicuous places, available to employees; and
applicants for employment, notices to be provided by the CITY
setting forth the provision of this non-discrimination clause.
The CONSULTANT will, in all solicitations or advertisements
for employees placed by or on behalf of the CONSULTANT, state
that all qualified applicants will receive consideration for
· employment without regard to race, creed, color or national
origin.
The CONSULTANT will cause the foregoing provisions to be in-
serted in all subcontracts for any work covered by this con-
tract so that such provisions will be binding upon each sub-
contract.
e
EFFECTIVE DATE OF CONTRACT: The CONTRACT shall be effecttve~UPO~ ~''
the date of the execution of this agreement.
IN WITNESS WHEREOF, the AGENCY and the CONSULTANT have executed this agreement
as of the date first above written~
THE CITY OF SALINA, KANSAS
ATTEST: By . Mayor
City C1 e'rk
WHITE, HAMELE & HUNSLEY
By ~ . Kenne~'h N. White
-3-