6.4 Repair Secondary DigesterCITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 07/01/2013 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: FISCAL APPROVAL: NO: 6 BY: ITEM UTILITIES DEPARTMENT FINAL APPROVAL: NO: 4 Page 1 BY: Martha Tasker BY ITEM: Authorize the repair of Secondary Digester No. 2 at the Wastewater Treatment Plant (WWTP), Project No. 13 -2992. BACKGROUND: The Wastewater Treatment Plant treats wastewater generated by homes and businesses. The treatment process produces a liquid effluent that is discharged to the Smoky Hill River and a byproduct of solids residue (sewage sludge). With further treatment, sewage sludge is converted to biosolids. The U.S. Environmental Protection Agency defines biosolids as the nutrient -rich organic materials that can be recycled and applied as fertilizer to improve and maintain productive soils and stimulate plant growth. The treatment process takes place in the primary digesters (four total) and the secondary digesters (two total) provide for the storage and settling of the biosolids prior to pumping and hauling for land application. Secondary Digester No. 2 is a 262,000 gallon concrete structure (installed in 1924) with a steel lid (installed in 1993). This disgester was taken out of service for cleaning and inspection in February 2013, and the lid seal was found to be damaged, and sample tubes and bracing were badly corroded or missing. A quote for the removal of the sample tubes and bracing (not required for this digester), and repair of the lid seal was received from Walters Morgan Construction, Inc. (WMCI) in the amount of $19,978. WMCI is currently on site completing the WWTP capital improvements project, and therefore, this repair work can be completed in a timely and cost effective manner. Their work is of good quality. FISCAL NOTE: A budget allocation of $130,000 for the maintenance of equipment is included in the 2013 WWTP operating budget under line item 690 - 390 - 210 - 772.186, and currently has a balance of $76,949.70. Funds ($19,978) are available for the repair of Secondary Digester No. 2. CONFORMANCE WITH STRATEGIC PLAN: Related Strategic Plan goals may include: GOAL #3: The City will provide the highest quality of services, consistent with governing body direction, available resources and staff commitment to quality. Action Item: The City Commission will maintain its commitment to the municipal organization by providing direction and resources that will allow them to meet established expectations. COMMISSION ACTION OR RECOMMENDED ACTION: Authorize the repair of Secondary Digester No. 2, Project No. 13 -2992 by Walters Morgan Construction, Inc. of Manhattan, Kansas in the amount of $19,978.