Loading...
6.4 Purchase Wastewater PumpsCITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 07/09/2012 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: FISCAL APPROVAL: 6 NO: RY- ITEM UTILITIES DEPARTMENT FINAL APPROVAL: NO: 4 Page 1 BY: Martha Tasker BY: ITEM: Approve the purchase of two (2) wastewater pumps for Wastewater Collection BACKGROUND: The City currently operates and maintains 59 wastewater pump stations (22 submersible and 37 dry pit type) within the Wastewater Collection System. Preventative and routine maintenance is completed yearly, which tends to increase the life of the pumping equipment. The life expectancy of wastewater pumps operating in this type of service has proven to be 10 years when proper maintenance is performed. Two wastewater pumps (one operating and one standby) are utilized to pump the raw wastewater at Wastewater Pump Station No. 35. Wastewater Pump Station No. 35 was installed in 1999. The two existing wastewater pumps have failed and require replacement. A spare pump from Wastewater Pump Station No. 13 is being utilized at Station No. 35. In addition, Station No. 35 has an overflow to Station No. 58. In 1993, Flygt and ABS were selected as acceptable manufactures to provide submersible type wastewater pump stations for the City of Salina. Utilizing these two manufactures, allows the City to maintain a reduced parts inventory; the ability to interchange pumps and parts between wastewater pump stations; allows staff to be familiar with standard maintenance procedures and allows for a competitive bidding process. The proposed wastewater pumps will mount into place without making any piping changes or modifications to the electrical system. City staff will install the pumps. Delivery time for the pumps is three months. Quotations were received as follows: Company Price Environmental & Process Systems, Inc. $197968.00 11419 Strang Line Road Lenexa, KS 66215 J C 1 $267586.70 1335 S. Young Wichita, KS 67209 FISCAL NOTE: A budget allocation of $222,000 for Maintenance Pump Stations is included in the 2012 Wastewater Collection Operating Budget under line item 690 - 390 - 220 - 772.187, and currently has a balance of $96,508.01. Funds ($19,968.00) are available for the replacement of the two (2) wastewater pumps. CONFORMANCE WITH THE STRATEGIC PLAN: Related Strategic Plan goals may include: GOAL #3: The City will provide the highest quality of services, consistent with governing body direction, available resources and staff commitment to quality. Action Item: The City Commission will maintain its commitment to the municipal organization by providing direction and resources that will allow them to meet established expectation. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 07/09/2012 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: FISCAL APPROVAL: 6 NO: BY- ITEM UTILITIES DEPARTMENT FINAL APPROVAL: NO: 4 Page 2 BY: Martha Tasker BY: COMMISSION ACTION: Authorize the purchase of two (2) wastewater pumps for Wastewater Collection from Environmental & Process Systems, Inc., Lenexa, Kansas in the amount of $19,968.00.