THIS AGREEMENT is made as of the �4day of rr �c,rc , 201 g„ by and
between UNION PACIFIC RAILROAD COMPANY, a Delaware corporation, or its predecessor
in interest, with a mailing address at 1400 Douglas Street, MS 1690, Omaha, Nebraska, 68179-1690
("Railroad"), and THE CITY OF SALINA, with a mailing address at 300 West Ash Street, PO Box
736, Salina KS 67402-0736 ("Political Body").
RECITALS:
Presently, the Political Body utilizes the Railroad's property for the existing Walnut Street at -
grade public road crossing, DOT No. 429 014X, at Railroad's Mile Post 496.15 on it's Trigo
Industrial Lead, in or near Salina, Saline County, Kansas (hereinafter the "Roadway").
The Political Body now desires to undertake as its project (the "Project") the reconstruction
by upgrading the surface to concrete to include the two existing sidewalks with the Political Body
providing all work zone traffic control and all of the concrete approach work for the roadway and
sidewalks including all of the public notifications of the existing Roadway. The existing
aforementioned roadway, as reconstructed is hereinafter the "Roadway" and where the Roadway
crosses the Railroad's property is the "Crossing Area" in the location shown on the Railroad
Location Print marked Exhibit A, attached hereto and hereby made a part hereof.
The right of way right used by the Political Body is sufficient to allow for the reconstruction
of the road crossing and such right of way is hereinafter referred to as the "Crossing Area."
AGREEMENT:
NOW THEREFORE, in consideration of the premises and of the promises and conditions
hereinafter set forth, the parties hereto agree as follows:
SECTION 1.
The exhibits below are attached hereto and hereby made a part hereof.
Exhibit A Railroad Location Print
Exhibit B Railroad's Material and Force Account Estimate
Exhibit C Railroad's Form of Contractor's Right of Entry Agreement
SECTION 2.
The Railroad, shall furnish all labor, material, equipment and supervision for the Roadway
Supplemental Public Road Xing Page 1 of 4 Date
Form Approved, AVP -Law
Uhion Pacific Railroad Company BUILDING AMERICA°
PUBLIC HIGHWAY AT -GRADE CROSSING
IMPROVEMENT AGREEMENT
Form Approved: AVP -Law
improvements with the Railroad paying thirty five percent (35%) of the cost and the Political Body
paying sixty five percent (65%) of the cost per the attached Railroad's Material and Force Account
Estimate dated 1/18/2012, in the amount of Sixty Eight Thousand One Hundred Sixty Eight Dollars
($68,168), marked Exhibit B.
SECTION 3.
A. The Political Body, at its expense, shall prepare, or cause to be prepared by others, the
detailed plans and specifications and submit such plans and specifications to the Railroad's
Assistant Vice President Engineering — Design, or his authorized representative, for review
and approval. The plans and specifications shall include all Roadway layout specifications,
cross sections and elevations, associated drainage, and other appurtenances.
B. The final one hundred percent (1001/6) completed plans that are approved in writing by the
Railroad's Assistant Vice President Engineering—Design, or his authorized representative, are
hereinafter referred to as the "Plans". The Plans are hereby made a part of this Agreement by
reference.
C. No changes in the Plans shall be made unless the Railroad has consented to such changes in
writing.
D. Notwithstanding the Railroad's approval of the Plans, the Railroad shall not be responsible
for the permitting, design, details or construction of the Roadway.
SECTION 4.
The Railroad, at the Political Body's expense, shall maintain the crossing between the track
tie ends. If, in the future, the Political Body elects to have the surfacing material between the track
tie ends replaced with paving or some surfacing material other than timber planking, the Railroad, at
Political Body's expense, shall install such replacement surfacing.
SECTION 5.
A. The Political Body, at its sole cost and expense, shall provide traffic control, barricades, and
all detour signing for the crossing work, provide all labor, material and equipment to install
concrete or asphalt street approaches, and if required, will install advanced warning signs,
and pavement markings in compliance and conformance with the Manual on Uniform Traffic
Control Devices.
B. The Political Body, at its expense, shall maintain and repair all portions of the Roadway
approaches that are not within the track tie ends.
SECTION 6.
If Political Body's contractor(s) is/are performing any work described in Section 4 above,
then the Political Body shall require its contractor(s) to execute the Railroad's standard and current
form of Contractor's Right of EntrAQreement attached hereto as Exhibit C. Political Body
acknowledges receipt of a copy of the Contractor's Right of Entry Agreement and understanding of
its terms, provisions, and requirements, and will inform its contractor(s) of the need to execute the
Agreement. Under no circumstances will the Political Body's contractor(s) be allowed onto the
Supplemental Public Road Xing Page 2 of 4 Date
Form Approved, AVP -Law
S Union Pacific Railroad Company
PUBLIC HIGHWAY AT -GRADE CROSSING
IMPROVEMENT AGREEMENT
Form Approved: AVP -Law
BUILDING AMERICA° 40
Railroad's premises without first executing the Contractor's Right of Entry Agreement.
SECTION 7.
Fiber optic cable systems may be buried on the Railroad's property. Protection of the fiber
optic cable systems is of extreme importance since any break could disrupt service to users resulting
in business interruption and loss of revenue and profits. Political Body or its contractor(s) shall
telephone the Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Time, Monday
through Friday, except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for
emergency calls) to determine if fiber optic cable is buried anywhere on the Railroad's premises to be
used by the Political Body or its contractor(s). If it is, Political Body or its contractor(s) will
telephone the telecommunications company(ies) involved, arrange for a cable locator, and make
arrangements for relocation or other protection of the fiber optic cable prior to beginning any work
on the Railroad's premises.
SECTION 8.
The Political Body, for itself and for its successors and assigns, hereby waives any right of
assessment against the Railroad, as an adjacent property owner, for any and all improvements made
under this agreement.
SECTION 9.
Covenants herein shall inure to or bind each party's successors and assigns; provided, no right
of the Political Body shall be transferred or assigned, either voluntarily or involuntarily, except by
express prior written consent of the Railroad.
SECTION 10.
The Political Body shall, when returning this agreement to the Railroad (signed), cause same
to be accompanied by such Order, Resolution, or Ordinance of the governing body of the Political
Body, passed and approved as by law prescribed, and duly certified, evidencing the authority of the
person executing this agreement on behalf of the Political Body with the power so to do, and which
also will certify that funds have been appropriated and are available for the payment of any sums
herein agreed to be paid by Political Body.
SECTION 11. SPECIAL PROVISIONS PERTAINING TO AMERICAN RECOVERY
AND REINVESTMENT ACT OF 2009.
If the Political Body will be receiving American Recovery and Reinvestment Act ("ARRA")
funding for the Project, the Political Body agrees that it is responsible in performing and completing
all ARRA reporting documents for the Project. The Political Body confirms and acknowledges
that Section 1512 of the ARRA provisions applies only to a "recipient" receiving ARRA funding
directly from the federal government and, therefore, (i) the ARRA reporting requirements are the
responsibility of the Political Body and not of the Railroad and (ii) the Political Body shall not
delegate any ARRA reporting responsibilities to the Railroad. The Political Body also confirms and
acknowledges that (i) the Railroad shall provide to the Political Body the Railroad's standard and
customary billing for expenses incurred by the Railroad for the Project including the Railroad's
Supplemental Public Road Xing Page 3 of 4 Date
Form Approved, AVP -Law
L Union Pacific Railroad Company
PUBLIC HIGHWAY AT -GRADE CROSSING
IMPROVEMENT AGREEMENT
Form Aooroved: AVP -Law
BUILDING AMERICA°
standard and customary documentation to support such billing and (ii) such standard and customary
billing and documentation from the Railroad provides the information needed by the Political Body
to perform and complete the ARRA reporting documents. The Railroad confirms that the Political
Body and the Federal Highway Administration shall have the right to audit the Railroad's billing and
documentation for the Project as provided in Exhibit B of this Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this Supplemental Agreement to
be executed as of the day and year first hereinabove written.
UNION PACIFIC RAILROAD COMPANY
(Federal Tax ID #94-6001323)
B.
y Nesser
nior Manager Contracts
WITNESS:
City of Salina
X
�4w
Title: ' " & `fl Dr
Supplemental Public Road Xing Page 4 of 4 Uate
Form Approved, AVP -Law
UPRR FOLDER NO.2718-86
PUBLIC HIGHWAY AT -GRADE CROSSING
IMPROVEMENT AGREEMENT
BETWEEN
UNION PACIFIC RAILROAD COMPANY
AND
THE CITY OF SALINA
COVERING
WALNUT STREET RESURFACING
AT
RAILROAD MILE POST 496.15 - TRIGO INDUSTRIAL
LEAD
AT OR NEAR
SALINA,
SALINE COUNTY,
KANSAS
RAILROAD LOCATION PRINT OF A
PUBLIC ROAD CROSSING
CONSTRUCTION PROJECT
RAILROAD WORK TO BE PERFORMED:
1. See the attached Railroad estimate to the agreement
EXHIBIT "A"
UNION PACIFIC RAILROAD COMPANY
Trigo Industrial Lead
MILE POST 496.15
GPS: N 38° 50.287', W 97° 37.312'
Salina, Saline County, Kansas
Location print of a road and sidewalk resurfacing project with the
City of Salina
Folder No. 2718-86 Date: January 31, 2012
WARNING
IN ALL OCCASIONS, U.P. COMMUNICATIONS DEPARTMENT MUST BE CONTACTED IN ADVANCE
OF ANY WORK TO DETERMINE EXISTENCE AND LOCATION OF FIBER OPTIC CABLE.
PHONE: 1-(800) 336-9193
Exhibit A
Railroad Location Print
EXHIBIT B
To Public Highway At -Grade Crossing
Improvement Agreement
Cover Sheet for the
Estimate of Material and Force Account Work
0
DATE: 2012-01-05
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD
THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2012-07-05
DESCRIPTION OF WORK:
2012 RECOLLECTABLE ROAD CROSSING
PROJECT
TRIGO IND LD/ M.P. 496.15/ WALNUT
ST. SALINA KS./
DOT## 429014X
INSTALL 72 TF OF CONCRETE CROSSING SURFACE
WITH RAIL, TIES
AND OTM
UNLOAD BALLAST AND SURFACE TRACK
SIGNAL AS NEEDED
65% RECOLLECTABLE FROM THE CITY OF
SALINA
ESTIMATED USING FEDERAL ADDITIVES
WITH OVERHEAD AND INDIRECT - 205%
PID: 77221 AWO: 12770
MP,SUBDIV: 496.15, TRIGO
SERVICE UNIT: 14 CITY: SALINA
STATE: KS
DESCRIPTION QTY UNIT
----------- --- ----
LABOR MATERIAL
-------------
RECOIL
-------
UPRR
-----
TOTAL
-----
ENGINEERING WORK
ENGINEERING
1750
1137
613
1750
LABOR ADDITIVE 205%
3587
2331
1256
3587
-------
TOTAL ENGINEERING
--------
5337
-------- --------
3468
--------
1869
5337
TRACK & SURFACE WORK
BALAST 2.00 CL
460
1653
1373
740
2113
ENVIRONMENTAL - PERMITS
10
6
4
10
EQUIPMENT RENTAL W/OPER
5000
3250
1747
5000
LABOR ADDITIVE 205%
14861
9663
5201
14861
MATL STORE EXPENSE
342
223
119
342
OTM
360
4455
3131
1684
4815
RAIL 160.00 IF
490
3355
2500
1345
3845
RDXING 72.00 TF
2214
16289
12027
6476
18503
SALES TAX
1178
763
415
1178
SAW CUT STREET APPROACH
500
325
175
500
SWTIE 56.00 EA
3527
3608
4637
2498
7135
TRK-SURF,LIN
2253
1464
789
2253
WELD
1712
137
1201
648
1849
XTIE EA
427
278
149
427
TOTAL TRACK & SURFACE
26304 36527
40841 21990 62831
---------------
LABOR/MATERIAL EXPENSE 31641 36527----------------
RECOLLECTIBLE/UPRR EXPENSE 44309 23859 --------
ESTIMATED PROJECT COST 68168
EXISTING REUSEABLE MATERIAL CREDIT
SALVAGE NONUSEABLE MATERIAL CREDIT
RECOLLECTIBLE LESS CREDITS
0
0
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
EXHIBIT C
To Public Highway At -Grade Crossing
Improvement Agreement
Cover Sheet for the Form of
Contractor's Right of Entry Agreement
C'ontractor's ROE (Generic) 06-23-2011
Form Approved - AVP Law
January 31, 2012
UPRR Folder No.: 2718-86
To the Contractor:
BUILDING AMERICA°
Before Union Pacific Railroad Company can permit you to perform work on its property for
the City of Salina on Walnut Street, it will be necessary for you to complete and execute two
originals of the enclosed Contractor's Right of Entry Agreement. Please:
1. Fill in the complete legal name of the contractor in the space provided on Page 1 of the
Contractor's Right of Entry Agreement. If a corporation, give the state of incorporation. If a
partnership, give the names of all partners.
2. Fill in the date construction will begin and be completed in Article 5, Paragraph A.
3. Fill in the name -of the contractor in the space provided in the signature block at the end of
the Contractor's Right of Entry Agreement. If the contractor is a corporation, the person
signing on its behalf must be an elected corporate officer.
4. Execute and return all copies of the Contractor's Right of Entry Agreement together with
your Certificate of Insurance as required in Exhibit B, in the attached, self-addressed
envelope.
5. Include a check made payable to the Union Pacific Railroad Company in the amount of
$500.00 for a non-refundable application and processing fee. If you require formal billing,
you may consider this letter as a formal bill. In compliance with the Internal Revenue
Services' new policy regarding their Form 1099, I certify that 94-6001323 is the Railroad
Company's correct Federal Taxpayer Identification Number and that Union Pacific Railroad
Company is doing business as a corporation.
Under Exhibit B of the enclosed Contractor's Right of Entry Agreement, you are required to
procure Railroad Protective Liability Insurance (RPLI) for the duration of this project. As a service
to you, Union Pacific is making this coverage available to you. If you decide that acquiring this
coverage from the Railroad is of benefit to you, please contact Mr. Bill Smith of Marsh USA @ 800-
729-7001, e-mail: william.i.smith e,marsh.com.
This agreement will not be accepted by the Railroad Company until you have returned all of
the following to the undersigned at Union Pacific Railroad Company:
1. Executed, unaltered duplicate original counterparts of the Contractor's Right of Entry
Agreement;
2. Your check in the amount of $500.00 to pay a non-refundable application and processing fee.
(The Folder Number and the name "Kathy Nesser" should be written on the check to insure
proper credit). If you require formal billing, you may consider this letter as a formal bill;
3. Copies of all of your up-to-date General Liability, Auto Liability & Workman's
Compensation Insurance Certificates (yours and all contractors), naming Union Pacific
Railroad Company as additional insured;
4. Copy of your up-to-date Railroad Protective Liability Insurance Certificate (yours and all
contractors ), naming Union Pacific Railroad Company as additional insured.
Contractor's ROE (Generic) 06-23-2011 Page 1 of 4 Date
Form Approved - AVP Law
Cbntractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law BUILDING AMERICA'
RETURN ALL OF THESE REQUIRED ITEMS TOGETHER IN ONE ENVELOPE.
DO NOT MAIL ANY ITEM SEPARATELY.
If you have any questions concerning this agreement, please contact me as noted below. Have
a safe day!
Sincerely,
z
KATHY NESSER
Senior Manager Contracts
Phone: (402) 544-8549
e-mail: klnesser@yp.com
Contractor's ROE (Generic) 05-01-2010 Page 2 of 4 Date
Form Approved - AVP Law
Cbntractor's ROE (Generic) 06-23-2011
Form Approved - AVP Law
Folder No.:
UPRR Audit No.:
CONTRACTOR'S
RIGHT OF ENTRY AGREEMENT
BUILDING AMERICA°
THIS AGREEMENT is made and entered into as of the day of
, 20 , by and between UNION PACIFIC RAILROAD
COMPANY, a Delaware corporation ("Railroad"); and ("Contractor").
RECITALS:
Contractor has been hired by the City of Salina ("Agency") to perform work relating to the
resurfacing of the road and sidewalk on Walnut Street (the "work"), with all or a portion of such
work to be performed on property of Railroad in the vicinity of the Railroad's Mile Post 496.15 on
the Railroad's Trigo Industrial Lead in or near Salina, Saline County, Kansas, as such location is in
the general location shown on the Railroad Location Print marked Exhibit A attached hereto and
hereby made a part hereof, which work is the subject of a Crossing Improvement Agreement dated
between the Railroad and the Agency.
The Railroad is willing to permit the Contractor to perform the work described above at the
location described above subject to the terms and conditions contained in this Agreement.
AGREEMENT:
NOW, THEREFORE, it is mutually agreed by and between Railroad and Contractor, as
follows:
ARTICLE I - DEFINITION OF CONTRACTOR.
For purposes of this Agreement, all references in this agreement to Contractor shall include
Contractor's contractors, subcontractors, officers, agents and employees, and others acting under its
or their authority.
ARTICLE 2 - RIGHT GRANTED; PURPOSE.
Railroad hereby grants to Contractor) the right, during the term hereinafter stated and upon
and subject to each and all of the terms, provisions and conditions herein contained, to enter upon
and have ingress to and egress from the property described in the Recitals for the purpose of
performing the work described in the Recitals above. The right herein granted to Contractor is
limited to those portions of Railroad's property specifically described herein, or as designated by the
Railroad Representative named in Article 4.
Contractor's ROE (Generic) 06-23-2011 Page 1 of 4 Date
Form Approved - AVP Law
Contractor's ROE (Generic) 06-23-2011
Form Approved - AVP Law BUILDING AMERICA°
ARTICLE 3 - TERMS AND CONDITIONS CONTAINED IN EXHIBITS B, C & D.
The General Terms and Conditions contained in Exhibit B, the Insurance Requirements
contained in Exhibit C, and the Minimum Safety Requirements contained in Exhibit D, each
attached hereto, are hereby made a part of this Agreement.
ARTICLE 4 - ALL EXPENSES TO BE BORNE BY CONTRACTOR; RAILROAD
REPRESENTATIVE.
A. Contractor shall bear any and all costs and expenses associated with any work performed by
Contractor, or any costs or expenses incurred by Railroad relating to this Agreement.
B. Contractor shall coordinate all of its work with the following Railroad representative or his
or her duly authorized representative (the "Railroad Representative"):
MICHAEL L. BENJAMIN
MGR SPEC PROJ IND &
6455 E COMMERCE AVE SUITE 200
KANSAS CITY, MO 64120
Work Phone: 816 399-1703
Fax: 816 399-1709
Cell Phone: 816 835-8399
C. Contractor, at its own expense, shall adequately police and supervise all work to be
performed by Contractor and shall ensure that such work is performed in a safe manner as set
forth in Section 7 of Exhibit B. The responsibility of Contractor for safe conduct and
adequate policing and supervision of Contractor's work shall not be lessened or otherwise
affected by Railroad's approval of plans and specifications involving the work, or by
Railroad's collaboration in performance of any work, or by the presence at the work site of a
Railroad Representative, or by compliance by Contractor with any requests or
recommendations made by Railroad Representative.
ARTICLE 5 - SCHEDULE OF WORK ON A MONTHLY BASIS.
The Contractor, at its expense, shall provide on a monthly basis a detailed schedule of work
to the Railroad Representative named in Article 4B above. The reports shall start at the execution of
this Agreement and continue until this Agreement is terminated as provided in this Agreement or
until the Contractor has completed all work on Railroad's property.
ARTICLE 6 - TERM; TERMINATION.
A. The grant of right herein made to Contractor shall commence on the date of this Agreement,
and continue until , unless sooner terminated as herein
Contractor's ROE (Generic) 06-23-2011 Page 2 of 4 Date
Form Approved - AVP Law
Contractor's ROE (Generic) 06-23-2011
Form Approved - AVP Law
BUILDING AMERICA' a
(Expiration Date)
provided, or at such time as Contractor has completed its work on Railroad's property,
whichever is earlier. Contractor agrees to notify the Railroad Representative in writing when
it has completed its work on Railroad's property.
B. This Agreement may be terminated by either party on ten (10) days written notice to the other
party.
ARTICLE 7 - CERTIFICATE OF INSURANCE.
A. Before commencing any work, Contractor will provide Railroad with the (i) insurance
binders, policies, certificates and endorsements set forth in Exhibit C of this Agreement, and
(ii) the insurance endorsements obtained by each subcontractor as required under Section 12
of Exhibit B of this Agreement.
B. All insurance correspondence, binders, policies, certificates and endorsements shall be sent
to:
Union Pacific Railroad Company
Real Estate Department
1400 Douglas Street, MS 1690
Omaha, NE 68179-1690
UPRR Folder No.: 2718-86
ARTICLE 8 - DISMISSAL OF CONTRACTOR'S EMPLOYEE.
At the request of Railroad, Contractor shall remove from Railroad's property any employee of
Contractor who fails to conform to the instructions of the Railroad Representative in connection.with
the work on Railroad's property, and any right of Contractor shall be suspended until such removal
has occurred. Contractor shall indemnify Railroad against any claims arising from the removal of
any such employee from Railroad's property.
ARTICLE 9 - CROSSINGS.
No additional vehicular crossings (including temporary haul roads) or pedestrian crossings
over Railroad's trackage shall be installed or used by Contractor without the prior written permission
of Railroad.
Contractor's ROE (Generic) 06-23-2011 Page 3 of 4 Date
Form Approved - AVP Law
Contractor's ROE (Generic) 06-23-2011
Form Approved - AVP Law BUILDING AMERICA'
ARTICLE 10 - EXPLOSIVES.
Explosives or other highly flammable substances shall not be stored or used on Railroad's
property without the prior written approval of Railroad.
IN WITNESS WHEREOF, the parties hereto have duly executed this agreement in
duplicate as of the date first herein written.
UNION PACIFIC RAILROAD COMPANY
(Federal Tax ID #94-6001323)
KATHY NESSER
Senior Manager Contracts
LIM
Title:
Contractor's ROE (Generic) 06-23-2011 Page 4 of 4 Date
Form Approved - AVP Law
EXHIBIT A
Exhibit A will be a print showing the general location of the work site.
Exhibit A
Railroad Location Print
N
I
RAILROAD LOCATION PRINT OF A
AD\
W'JW—E
PUBLIC ROAD CROSSING
S
CONSTRUCTION PROJECT
. .......
a
U�1141R 5
ate, "SU Z;'
M
2
k
0-
by
61 W-
4Cv
A
ii jiij
°x`}
44,
VO W
walnut St, Salina Kansas
DOT 429 014X, MP 496.15 Trigo In L ]d
12,
N
3i M
==23 12
7�rMW4� 1�
FFF'U,777.... r -v-a
'�ilN
VP
'n VIM
z
Uj-
-,5 er }&
vi�
V,
'4 "0
A
iZ
iiMW
rJ
fi
1<„YY South 8t
§t.
grl. 5E=
yt JiIF`--��' SRP
RAILROAD WORK TO BE PERFORMED:
EXHIBIT 6(A99
1. See the attached Railroad estimate to the agreement
UNION PACIFIC RAILROAD COMPANY
Trigo Industrial Lead
MILE POST 496.15
GPS: N 38' 50.287', W 97' 37.312'
Salina, Saline County, Kansas
Location print of a road and sidewalk resurfacing project with the
City of Salina
Folder No. 2718-86 Date: January 31, 2012
WARNING
IN ALL OCCASIONS, U.P. COMMMCATIONS DEPARTMENT MUST BE CONTACTED IN ADVANCE
OF ANY WORK TO DETERMINE EXISTENCE AND LOCATION OF FIBER OPTIC CABLE.
PHONE: 1-(800) 336-9193
Exhibit A
Railroad Location Print
Contractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
EXHIBIT B
TO CONTRACTOR'S RIGHT OF ENTRY AGREEMENT
GENERAL TERMS & CONDITIONS
Section 1. NOTICE OF COMMENCEMENT OF WORK - FLAGGING.
BUILDING AMERICA
A. Contractor agrees to notify the Railroad Representative at least thirty (30) working days in advance of Contractor
commencing its work and at least thirty (30) working days in advance of proposed performance of any work by Contractor in
which any person or equipment will be within twenty-five (25) feet of any track, or will be near enough to any track that any
equipment extension (such as, but not limited to, a crane boom) will reach to within twenty-five (25) feet of any track. No work
of any kind shall be performed, and no person, equipment, machinery, tool(s), material(s), vehicle(s), or thing(s) shall be
located, operated, placed, or stored within twenty-five (25) feet of any of Railroad's track(s) at any time, for any reason, unless
and until a Railroad flagman is provided to watch for trains. Upon receipt of such thirty (30) -day notice, the Railroad
Representative will determine and inform Contractor whether a flagman need be present and whether Contractor needs to
implement any special protective or safety measures. If flagging or other special protective or safety measures are performed
by Railroad, Railroad will bill Contractor for such expenses incurred by Railroad, unless Railroad and a federal, state or local
governmental entity have agreed that Railroad is to bill such expenses to the federal, state or local governmental entity. If
Railroad will be sending the bills to Contractor, Contractor shall pay such bills within thirty (30) days of Contractor's receipt of
billing. If Railroad performs any flagging, or other special protective or safety measures are performed by Railroad, Contractor
agrees that Contractor is not relieved of any of its responsibilities or liabilities set forth in this Agreement.
B. The rate of pay per hour for each flagman will be the prevailing hourly rate in effect for an eight-hour day for the class of
flagmen used during regularly assigned hours and overtime in accordance with Labor Agreements and Schedules in effect at
the time the work is performed. In addition to the cost of such labor, a composite charge for vacation, holiday, health and
welfare, supplemental sickness, Railroad Retirement and unemployment compensation, supplemental pension, Employees
Liability and Property Damage and Administration will be included, computed on actual payroll. The composite charge will be
the prevailing composite charge in effect at the time the work is performed. One and one-half times the current hourly rate is
paid for overtime, Saturdays and Sundays, and two and one-half times current hourly rate for holidays. Wage rates are subject
to change, at any time, by law or by agreement between Railroad and its employees, and may be retroactive as a result of
negotiations or a ruling of an authorized governmental agency. Additional charges on labor are also subject to change. If the
wage rate or additional charges are changed, Contractor (or the governmental entity, as applicable) shall pay on the basis of
the new rates and charges.
C. Reimbursement to Railroad will be required covering the full eight-hour day during which any flagman is furnished,
unless the flagman can be assigned to other Railroad work during a portion of such day, in which event reimbursement will not
be required for the portion of the day during which the flagman is engaged in other Railroad work. Reimbursement will also be
required for any day not actually worked by the flagman following the flagman's assignment to work on the project for which
Railroad is required to pay the flagman and which could not reasonably be avoided by Railroad by assignment of such flagman
to other work , even though Contractor may not be working during such time. When it becomes necessary for Railroad to
bulletin and assign an employee to a flagging position in compliance with union collective bargaining agreements, Contractor
must provide Railroad a minimum of five (5) days notice prior to the cessation of the need for a flagman. If five (5) days notice
of cessation is not given, Contractor will still be required to pay flagging charges for the five (5) day notice period required by
union agreement to be given to the employee, even though flagging is not required for that period. An additional thirty (30) days
notice must then be given to Railroad if flagging services are needed again after such five day cessation notice has been given
to Railroad.
Section 2. LIMITATION AND SUBORDINATION OF RIGHTS GRANTED
A. The foregoing grant of right is subject and subordinate to the prior and continuing right and obligation of the Railroad to
use and maintain its entire property including the right and power of Railroad to construct, maintain, repair, renew, use, operate,
change, modify or relocate railroad tracks, roadways, signal, communication, fiber optics, or otherwirelines, pipelines and other
facilities upon, along or across any or all parts of its property, all or any of which may be freely done at any time or times by
Railroad without liability to Contractor or to any other party for compensation or damages.
B. The foregoing grant is also subject to all outstanding superior rights (whether recorded or unrecorded and including
those in favor of licensees and lessees of Railroad's property, and others) and the right of Railroad to renew and extend the
same, and is made without covenant of title or for quiet enjoyment.
Contractor's ROE (Generic) 05-01-2010 Page 1 of 4 Exhibit B
Form Approved - AVP Law General Terms & Conditions
Cont'ractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
BUILDING AMERICA'
Section 3. NO INTERFERENCE WITH OPERATIONS OF RAILROAD AND ITS TENANTS.
A. Contractor shall conduct its operations so as not to interfere with the continuous and uninterrupted use and operation of
the railroad tracks and property of Railroad, including without limitation, the operations of Railroad's lessees, licensees or
others, unless specifically authorized in advance by the Railroad Representative. Nothing shall be done or permitted to be
done by Contractor at any time that would in any manner impair the safety of such operations. When not in use, Contractor's
machinery and materials shall be kept at least fifty (50) feet from the centerline of Railroad's nearest track, and there shall be
no vehicular crossings of Railroads tracks except at existing open public crossings.
B. Operations of Railroad and work performed by Railroad personnel and delays in the work to be performed by
Contractor caused by such railroad operations and work are expected by Contractor, and Contractor agrees that Railroad shall
have no liability to Contractor, or any other person or entity for any such delays. The Contractor shall coordinate its activities
with those of Railroad and third parties so as to avoid interference with railroad operations. The safe operation of Railroad train
movements and other activities by Railroad takes precedence over any work to be performed by Contractor.
Section 4. LIENS.
Contractor shall pay in full all persons who perform labor or provide materials for the work to be performed by
Contractor. Contractor shall not create, permit or suffer any mechanic's or materialmen's liens of any kind or nature to be
created or enforced against any property of Railroad for any such work performed. Contractor shall indemnify and hold
harmless Railroad from and against any and all liens, claims, demands, costs or expenses of whatsoever nature in any way
connected with or growing out of such work done, labor performed, or materials furnished. If Contractor fails to promptly cause
any lien to be released of record, Railroad may, at its election, discharge the lien or claim of lien at Contractor's expense.
Section 5. PROTECTION OF FIBER OPTIC CABLE SYSTEMS.
A. Fiber optic cable systems may be buried on Railroad's property. Protection of the fiber optic cable systems is of
extreme importance since any break could disrupt service to users resulting in business interruption and loss of revenue and
profits. Contractor shall telephone Railroad during normal business hours (7:00 a.m. to 9:00 p.m. Central Time, Monday
through Friday, except holidays) at 1-800-336-9193 (also a 24-hour, 7 -day number for emergency calls) to determine if fiber
optic cable is buried anywhere on Railroad's property to be used by Contractor. If it is, Contractor will telephone the
telecommunications company(ies) involved, make arrangements for a cable locator and, if applicable, for relocation or other
protection of the fiber optic cable. Contractor shall not commence any work until all such protection or relocation (if applicable)
has been accomplished.
B. In addition to other indemnity provisions in this Agreement, Contractor shall indemnify, defend and hold Railroad
harmless from and against all costs, liability and expense whatsoever (including, without limitation, attorneys' fees, court costs
and expenses) arising out of any act or omission of Contractor, its agents and/or employees, that causes or contributes to (1)
any damage to or destruction of any telecommunications system on Railroad's property, and/or (2) any injury to or death of any
person employed by or on behalf of any telecommunications company, and/or its contractor, agents and/or employees, on
Railroad's property. Contractor shall not have or seek recourse against Railroad for any claim or cause of action for alleged
loss of profits or revenue or loss of service or other consequential damage to a telecommunication company using Railroad's
property or a customer or user of services of the fiber optic cable on Railroad's property.
Section 6. . PERMITS - COMPLIANCE WITH LAWS.
In the prosecution of the work covered by this Agreement, Contractor shall secure any and all necessary permits and
shall comply with all applicable federal, state and local laws, regulations and enactments affecting the work including, without
limitation, all applicable Federal Railroad Administration regulations.
Section 7. SAFETY.
A. Safety of personnel, property, rail operations and the public is of paramount importance in the prosecution of the work
performed by Contractor. Contractor shall be responsible for initiating, maintaining and supervising all safety, operations and
programs in connection with the work. Contractor shall at a minimum comply with Railroad's safety standards listed in Exhibit
D, hereto attached, to ensure uniformity with the safety standards followed by Railroad's own forces. As a part of Contractor's
safety responsibilities, Contractor shall notify Railroad if Contractor determines that any of Railroad's safety standards are
contrary to good safety practices. Contractor shall furnish copies of Exhibit D to each of its employees before they enter the
job site.
Contractor's ROE (Generic) 05-01-2010 Page 2 of 4 Exhibit B
Form Approved - AVP Law General Terms & Conditions
Contractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
BUILDING AMERICA
B. Without limitation of the provisions of paragraph A above, Contractor shall keep the job site free from safety and health
hazards and ensure that its employees are competent and adequately trained in all safety and health aspects of the job.
C. Contractor shall have proper first aid supplies available on the job site so that prompt first aid services may be provided
to any person injured on the job site. Contractor shall promptly notify Railroad of any U.S. Occupational Safety and Health
Administration reportable injuries. Contractor shall have a nondelegable duty to control its employees while they are on the job
site or any other property of Railroad, and to be certain they do not use, be under the influence of, or have in their possession
any alcoholic beverage, drug or other substance that may inhibit the safe performance of any work.
D. If and when requested by Railroad, Contractor shall deliver to Railroad a copy of Contractor's safety plan for conducting
the work (the "Safety Plan"). Railroad shall have the right, but not the obligation, to require Contractor to correct any
deficiencies in the Safety Plan. The terms of this Agreement shall control if there are any inconsistencies between this
Agreement and. the Safety Plan.
Section 8. INDEMNITY.
A. To the extent not prohibited by applicable statute, Contractor shall indemnify, defend and hold harmless Railroad, its
affiliates, and its and their officers, agents and employees (individually an "Indemnified Party" or collectively "Indemnified
Parties") from and against any and all loss, damage, injury, liability, claim, demand, cost or expense (including, without
limitation, attorney's, consultant's and expert's fees, and court costs), fine or penalty (collectively, "Loss") incurred by any
person (including, without limitation, any Indemnified Party, Contractor, or any employee of Contractor or of any Indemnified
Party) arising out of or in any manner connected with (i) any work performed by Contractor, or (ii) any act or omission of
Contractor, its officers, agents or employees, or (iii) any breach of this Agreement by Contractor.
B. The right to indemnity under this Section 8 shall accrue upon occurrence of the event giving rise to the Loss, and shall
apply regardless of any negligence or strict liability of any Indemnified Party, exceptwhere the Loss is caused by the sole active
negligence of an Indemnified Party as established by the final judgment of a court of competent jurisdiction. The sole active
negligence of any Indemnified Party shall not bar the recovery of any other Indemnified Party.
C. Contractor expressly and specifically assumes potential liability under this Section 8 for claims or actions brought by
Contractor's own employees. Contractor waives any immunity it may have under worker's compensation or industrial insurance
acts to indemnify the Indemnified Parties under this Section 8. Contractor acknowledges that this waiver was mutually
negotiated by the parties hereto.
D. No court or jury findings in any employee's suit pursuant to any worker's compensation act or the Federal Employers'
Liability Act against a party to this Agreement may be relied upon or used by Contractor in any attempt to assert liability against
any Indemnified Party.
E. The provisions of this Section 8 shall survive the completion of any work performed by Contractor or the termination or
expiration of this Agreement. In no event shall this Section 8 or any other provision of this Agreement be deemed to limit any
liability Contractor may have to any Indemnified Party by statute or under common law.
Section 9. RESTORATION OF PROPERTY.
In the event Railroad authorizes Contractor to take down any fence of Railroad or in any manner move or disturb any of
the other property of Railroad in connection with the work to be performed by Contractor, then in that event Contractor shall, as
soon as possible and at Contractor's sole expense, restore such fence and other property to the same condition as the same
were in before such fence was taken down or such other property was moved or disturbed. Contractor shall remove all of
Contractor's tools, equipment, rubbish and other materials from Railroad's property promptly upon completion of the work,
restoring Railroad's property to the same state and condition as when Contractor entered thereon.
Section 10. WAIVER OF DEFAULT.
Waiver by Railroad of any breach or default of any condition, covenant or agreement herein contained to be kept,
observed and performed by Contractor shall in no way impair the right of Railroad to avail itself of any remedy for any
subsequent breach or default.
Section 11. MODIFICATION - ENTIRE AGREEMENT.
No modification of this Agreement shall be effective unless made in writing and signed by Contractor and Railroad. This
Agreement and the exhibits attached hereto and made a part hereof constitute the entire understanding between Contractor
Contractor's ROE (Generic) 05-01-2010 Page 3 of 4 Exhibit B
Form Approved - AVP Law General Terms & Conditions
•' .Contractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
BUILDING AMERICA° (D
and Railroad and cancel and supersede any prior negotiations, understandings or agreements, whether written or oral, with
respect to the work to be performed by Contractor.
Section 12. ASSIGNMENT - SUBCONTRACTING.
Contractor shall not assign or subcontract this Agreement, or any interest therein, without the written consent of the
Railroad. Contractor shall be responsible for the acts and omissions of all subcontractors. Before Contractor commences any
work, the Contractor shall, except to the extent prohibited by law; (1) require each of its subcontractors to include the
Contractor as "Additional Insured" in the subcontractor's Commercial General Liability policy and Business Automobile policies
with respect to all liabilities arising out of the subcontractor's performance of work on behalf of the Contractor by endorsing
these policies with ISO Additional Insured Endorsements CG 20 26, and CA 20 48 (or substitute forms providing equivalent
coverage; (2) require each of its subcontractors to endorse their Commercial General Liability Policy with "Contractual Liability
Railroads" ISO Form CG 24 17 10 01 (or a substitute form providing equivalent coverage) for the job site; and (3) require each
of its subcontractors to endorse their Business Automobile Policy with "Coverage For Certain Operations In Connection With
Railroads" ISO Form CA 20 70 10 01 (or a substitute form providing equivalent coverage) for the job site.
Contractor's ROE (Generic) 05-01-2010 Page 4 of 4 Exhibit B
Form Approved - AVP Law General Terms & Conditions
�^ "Contractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
EXHIBIT C
TO CONTRACTOR'S RIGHT OF ENTRY AGREEMENT
INSURANCE REQUIREMENTS
BUILDING AMERICA'
Contractor shall, at its sole cost and expense, procure and maintain during the course of the Project and until all Project work
on Railroad's property has been completed and the Contractor has removed all equipment and materials from Railroad's
property and has cleaned and restored Railroad's property to Railroad's satisfaction, the following insurance coverage:
A. COMMERCIAL GENERAL LIABILITY INSURANCE. Commercial general liability (CGL) with a limit of not less than
$5,000,000 each occurrence and an aggregate limit of not less than $10,000,000. CGL insurance must be written on ISO
occurrence form CG 00 01 12 04 (or a substitute form providing equivalent coverage).
The policy must also contain the following endorsement, which must be stated on the certificate of insurance:
• Contractual Liability Railroads ISO form CG 24 17 10 01 (or a substitute form providing equivalent coverage) showing
"Union Pacific Railroad Company Property" as the Designated Job Site.
• Designated Construction Project(s) General Aggregate Limit ISO Form CG 25 03 03 97 (or a substitute form providing
equivalent coverage) showing the project on the form schedule.
B. BUSINESS AUTOMOBILE COVERAGE INSURANCE. Business auto coverage written on ISO form CA 00 01 10 01 (or a
substitute form providing equivalent liability coverage) with a combined single limit of not less $5,000,000 for each accident and
coverage must include liability arising out of any auto (including owned, hired and non -owned autos).
The policy must contain the following endorsements, which must be stated on the certificate of insurance:
• Coverage For Certain Operations In Connection With Railroads ISO form CA 20 70 10 01 (or a substitute form
providing equivalent coverage) showing "Union Pacific Property" as the Designated Job Site.
• Motor Carrier Act Endorsement - Hazardous materials clean up (MCS -90) if required by law.
C. WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY INSURANCE. Coverage must include but not be limited
to:
• Contractor's statutory liability under the workers' compensation laws of the state where the work is being performed.
• Employers' Liability (Part B) with limits of at least $500,000 each accident, $500,000 disease policy limit $500,000 each
employee.
If Contractor is self-insured, evidence of state approval and excess workers compensation coverage must be provided.
Coverage must include liability arising out of the U. S. Longshoremen's and Harbor Workers' Act, the Jones Act, and the Outer
Continental Shelf Land Act, if applicable.
The policy must contain the following endorsement, which must be stated on the certificate of insurance:
• Alternate Employer endorsement ISO form WC 00 03 01 A (or a substitute form providing equivalent coverage)
showing Railroad in the schedule as the alternate employer (or a substitute form providing equivalent coverage).
D. RAILROAD PROTECTIVE LIABILITY INSURANCE. Contractor must maintain "Railroad Protective Liability" (RPL)
insurance written on ISO occurrence form CG 00 35 12 04 (or a substitute form providing equivalent coverage) on behalf of
Railroad as named insured, with a limit of not less than $2,000,000 per occurrence and an aggregate of $6,000,000. The
definition of "JOB LOCATION" and "WORK' on the declaration page of the policy shall refer to this Agreement and shall
describe all WORK or OPERATIONS performed under this agreement. Contractor shall provide this Agreement to Contractor's
insurance agent(s) and/or broker(s) and Contractor shall instruct such agent(s) and/or broker(s) to procure the insurance
coverage required by this Agreement. A BINDER STATING THE POLICY IS IN PLACE MUST. BE SUBMITTED TO
RAILROAD BEFORE THE WORK MAY COMMENCE AND UNTIL THE ORIGINAL POLICY IS FORWARDED TO UNION
PACIFIC RAILROAD.
E. UMBRELLA OR EXCESS INSURANCE. If Contractor utilizes umbrella or excess policies, these policies must "follow
form" and afford no less coverage than the primary policy.
Contractor's ROE (Generic) 05-01-2010 Page 1 of 2 Exhibit C
Form Approved - AVP Law Insurance Requirements
w. Conitactors ROE (Generic) 05-01-2010
Form Approved - AVP Law
BUILDING AMERICA" (W
F. POLLUTION LIABILITY INSURANCE. Pollution liability coverage must be included when the scope of the work as defined
in the Agreement includes installation, temporary storage, or disposal of any "hazardous" material that is injurious in or upon
land, the atmosphere, or any watercourses; or may cause bodily injury at any time.
If required, coverage may be provided in separate policy form or by endorsement to Contractors CGL or RPL. In any form
coverage must be equivalent to that provided in ISO form CG 2415 "Limited Pollution Liability Extension Endorsement" or CG
28 31 "Pollution Exclusion Amendment" with limits of at least $5,000,000 per occurrence and an aggregate limit of
$10,000,000.
If the scope of work as defined in this Agreement includes the disposal of any hazardous or non -hazardous materials from
the job site, Contractor must furnish to Railroad evidence of pollution legal liability insurance maintained by the disposal site
operator for losses arising from the insured facility accepting the materials, with coverage in minimum amounts of $1,000,000
per loss, and an annual aggregate of $2,000,000.
OTHER REQUIREMENTS
G. All policy(ies) required above (except worker's compensation and employers liability) must include Railroad as "Additional
Insured" using ISO Additional Insured Endorsements CG 20 26, and CA 20 48 (or substitute forms providing equivalent
coverage). The coverage provided to Railroad as additional insured shall, to the extent provided under ISO Additional Insured
Endorsement CG 20 26, and CA 20 48 provide coverage for Railroad's negligence whether sole or partial, active or passive,
and shall not be limited by Contractor's liability under the indemnity provisions of this Agreement.
H. Punitive damages exclusion, if any, must be deleted (and the deletion indicated on the certificate of insurance), unless the
law governing this Agreement prohibits all punitive damages that might arise under this Agreement.
I. Contractor waives all rights of recovery, and its insurers also waive all rights of subrogation of damages against Railroad
and its agents, officers, directors and employees. This waiver must be stated on the certificate of insurance.
J. Prior to commencing the work, Contractor shall furnish Railroad with a certificate(s) of insurance, executed by a duly
authorized representative of each insurer, showing compliance with the insurance requirements in this Agreement.
K. All insurance policies must be written by a reputable insurance company acceptable to Railroad or with a current Best's
Insurance Guide Rating of A- and Class VII or better, and authorized to do business in the state where the work is being
performed.
L. The fact that insurance is obtained by Contractor or by Railroad on behalf of Contractor will not be deemed to release or
diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this Agreement.
Damages recoverable by Railroad from Contractor or any third party will not be limited by the amount of the required insurance
coverage.
Contractor's ROE (Generic) 05-01-2010 Page 2 of 2 Exhibit C
Form Approved - AVP Law Insurance Requirements
w (Conttactor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
EXHIBIT D
TO CONTRACTOR'S RIGHT OF ENTRY AGREEMENT
MINIMUM SAFETY REQUIREMENTS
BUILDING AMERICA'
The term "employees" as used herein refer to all employees of Contractor as well as all employees of any subcontractor or
agent of Contractor.
I. CLOTHING
A. All employees of Contractor will be suitably dressed to perform their duties safely and in a manner that will not interfere with
their vision, hearing, or free use of their hands or feet.
Specifically, Contractor's employees must wear:
(i) Waist -length shirts with sleeves.
(ii) Trousers that cover the entire leg. If flare -legged trousers are worn, the trouser bottoms must be tied to prevent
catching.
(iii) Footwear that covers their ankles and has a defined heel. Employees working on bridges are required to wear safety -
toed footwear that conforms to the American National Standards Institute (ANSI) and FRA footwear requirements.
B. Employees shall not wear boots (other than work boots), sandals, canvas -type shoes, or other shoes that have thin soles or
heels that are higher than normal.
C. Employees must not wear loose or ragged clothing, neckties, finger rings, or other loose jewelry while operating or working
on machinery.
II. PERSONAL PROTECTIVE EQUIPMENT
Contractor shall require its employees to wear personal protective equipment as specified by Railroad rules, regulations, or
recommended or requested by the Railroad Representative.
(i) Hard hat that meets the American National Standard (ANSI) Z89.1 — latest revision. Hard hats should be affixed with
Contractor's company logo or name.
(ii) Eye protection that meets American National Standard (ANSI) for occupational and educational eye and face
protection, Z87.1 — latest revision. Additional eye protection must be provided to meet specific job situations such as
welding, grinding, etc.
(iii) Hearing protection, which affords enough attenuation to give protection from noise levels that will be occurring on the
job site. Hearing protection, in the form of plugs or muffs, must be worn when employees are within:
■ 100 feet of a locomotive or roadway/work equipment
■ 15 feet of power operated tools
■ 150 feet of jet blowers or pile drivers
■ 150 feet of retarders in use (when within 10 feet, employees must wear dual ear protection — plugs and muffs)
(iv) Other types of personal protective equipment, such as respirators, fall protection equipment, and face shields, must be
worn as recommended or requested by the Railroad Representative.
III. ON TRACK SAFETY
Contractor is responsible for compliance with the Federal Railroad Administration's Roadway Worker Protection regulations
49CFR214, Subpart C and Railroad's On -Track Safety rules. Under 49CFR214, Subpart C, railroad contractors are
responsible for the training of their employees on such regulations. In addition to the instructions contained in Roadway Worker
Protection regulations, all employees must:
(i) Maintain a distance of twenty-five (25) feet to any track unless the Railroad Representative is present to authorize
movements.
(ii) Wear an orange, reflectorized workwear approved by the Railroad Representative.
(iii) Participate in a job briefing that will specify the type of On -Track Safety for the type of work being performed.
Contractor must take special note of limits of track authority, which tracks may or may not be fouled, and clearing the
track. Contractor will also receive special instructions relating to the work zone around machines and minimum
distances between machines while working or traveling.
Contractor's ROE (Generic) 05-01-2010 Page 1 of 2 Exhibit D
Form Approved - AVP Law Minimum Safety Requirements
,S;onfractor's ROE (Generic) 05-01-2010
Form Approved - AVP Law
IV. EQUIPMENT
BUILDING AMERICA'
A. It is the responsibility of Contractor to ensure that all equipment is in a safe condition to operate. If, in the opinion of the
Railroad Representative, any of Contractor's equipment is unsafe for use, Contractor shall remove such equipment from
Railroad's property. In addition, Contractor must ensure that the operators of all equipment are properly trained and competent
in the safe operation of the equipment. In addition, operators must be:
■ Familiar and comply with Railroad's rules on lockout/tagout of equipment.
■ Trained in and comply with the applicable operating rules if operating any by -rail equipment on -track.
■ Trained in and comply with the applicable air brake rules if operating any equipment that moves rail cars or any other
railbound equipment.
B. All self-propelled equipment must be equipped with a first-aid kit, fire extinguisher, and audible back-up warning device.
C. Unless otherwise authorized by the Railroad Representative, all equipment must be parked a minimum of twenty-five (25)
feet from any track. Before leaving any equipment unattended, the operator must stop the engine and properly secure the
equipment against movement.
D. Cranes must be equipped with three orange cones that will be used to mark the working area of the crane and the
minimum clearances to overhead powerlines.
V. GENERAL SAFETY REQUIREMENTS
A. Contractor shall ensure that all waste is properly disposed of in accordance with applicable federal and state regulations.
B. Contractor shall ensure that all employees participate in and comply with a job briefing conducted by the Railroad
Representative, if applicable. During this briefing, the Railroad Representative will specify safe work procedures, (including On -
Track Safety) and the potential hazards of the job. If any employee has any questions or concerns about the work, the
employee must voice them during the job briefing. Additional job briefings will be conducted during the work as conditions,
work procedures, or personnel change.
C. All track work performed by Contractor meets the minimum safety requirements established by the Federal Railroad
Administration's Track Safety Standards 49CFR213.
D. All employees comply with the following safety procedures when working around any railroad track:
(i) Always be on the alert for moving equipment. Employees must always expect movement on any track, at any time, in
either direction.
(ii) Do not step or walk on the top of the rail, frog, switches, guard rails, or other track components.
(iii) In passing around the ends of standing cars, engines, roadway machines or work equipment, leave at least 20 feet
between yourself and the end of the equipment. Do not go between pieces of equipment of the opening is less than
one car length (50 feet).
(iv) Avoid walking or standing on a track unless so authorized by the employee in charge.
(v) Before stepping over or crossing tracks, look in both directions first.
(vi) Do not sit on, lie under, or cross between cars except as required in the performance of your duties and only when
track and equipment have been protected against movement.
E. All employees must comply with all federal and state regulations concerning workplace safety.
Contractor's ROE (Generic) 05-01-2010 Page 2 of 2 Exhibit D
Form Approved - AVP Law Minimum Safety Requirements
C
EXHIBIT A
To Public Highway At -Grade Crossing
Improvement Agreement
Cover Sheet for the
Railroad Location Print