Loading...
6.9 Order Sidewalk Replacement CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 10/18/1982 4:00 P.M. AGENDA SECT I ON: Con sen t OR I G I NAT I NG DEPARTMENT: AIA°R~ OV~-~D F/~)R NO. 6 City Clerk AG~ND~(~, ,,.// NO. 9 BY: B U Resolution Number 82-3618 - determinin9 necessity of and directin9 that the owner or owners of certain lots construct, in compliance with plans and specifications of the City Engineer, a sidewalk, abuttin9 said lots within 60 days of the adoption and publication hereof and providin9 that in the event the owner or owners fail to do so, that the City of Salina shall proceed to construct, or cause to be constructed, said sidewalk and that the total cost thereof shall be assessed against such lot or lots on which such sidewalk shall abut as other special assessments. (Requested in Petition 38~0, filed by Garlen Howington) COMMISSION ACTION MOTION BY SECOND BY TO: