Loading...
5.1 Levy Utility Assessments CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 12/02/02 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 5 ITEM NO. Page 1 1 & 1a Engineering and General Services BY: Shawn o'Lear6 BY: / ~ ... 11 ~ 'J'- ITEM: Public hearing and second reading Ordinance No. 02-10115 levying special assessments for utility improvements to serve North Ohio Street, Project No. 01-1264. BACKGROUND: On November 18, 2002, the City Commission received the final breakdown of costs for a public improvement project, which involved special assessment financing and scheduled a public hearing for December 2,2002. This project was constructed in 2002. A map of the project location and summary of the total project costs are attached for your information. The public hearing is intended to receive input from interest parties and particularly property owners within the special assessment benefit district. The primary issue is not whether the special assessments should be levied against the properties, but rather that the final costs have been properly calculated and distributed. Other key dates in the process are as follow: Dec. 5,2002 Publish assessment ordinance. Mail final statements to property owners; begin pre-payment period. 30-day pre-prepayment period ends. Scheduled date for bond closing. Jan. 6,2002 May 2003 RECOMMENDATION: It is recommended that the City Commission adopt Ordinance No. 02-10115 on second reading after conducting the public hearing. NORTH OHIO STREET UTILITY IMPROVEMENTS PROJECT NO. 01-1264 TOTAL PROJECT COST (Including Water and Sanitary Sewer) 1 CONSTRUCTION STAKING 2 GRAVITY SEWER IN TRENCH, 8. 3 GRAVITY SEWER IN TRENCH, 10. 4 GRAVITY SEWER IN TRENCH, 12. 5 C-900 PVC GRAVITY SEWER IN TRENCH, 8. 6 C-900 PVC GRAVITY SEWER IN TRENCH, 10. 7 C-900 PVC GRAVITY SEWER IN BORE HOLE, 8. 8 C-900 PVC GRAVITY SEWER IN BORE HOLE, 10. 13 BORE HOLE, 12. 14 BORE HOLE, 14. 15 BORE HOLE, 16. 16 MANHOLE (0-6') 17 EXTRA DEPTH MANHOLE 19 WASTEWATER PUMP STATION 20 WATER PIPELINE IN TRENCH, 12" 21 WATER PIPELINE IN BORE HOLE, 12" 24 FIRE HYDRANT & VALVE ASSEMBLY 25 RECONNECTION OF EXISTING FH & V ASSEMBLY 29 COMPACTED BACKFILL SUBTOTAL: CITY ADMINISTRATION: ENGINEERING & CONTINGENCY: TEMPORARY NOTE INTEREST, BONDING, ISSUING: UTILITY EASEMENT & RfW ACQUISITION: TOTAL: 1.00 LS. 358.00 LF. 680.00 LF. 425.00 LF. 220.00 LF. 190.00 LF. 70.00 LF. 240.00 LF. 70.00 LF. 240.00 LF. 235.00 LF. 7.00 EA. 26.65 LF. 1.00 LS. 2,034.70 LF. 235.00 LF. 5.00 EA. 1.00 EA. 120.00 LF. @ $ 1,988.00 @ $ 28.00 @ $ 25.00 @ $ 27.00 @ $ 26.00 @ $ 28.00 @ $ 30.00 @ $ 27.00 @ $ 110.00 @ $ 100.00 @ $ 70.00 @ $ 2,900.00 @ $ 195.00 @ $116,500.00 @ $ 17.30 @ $ 23.00 @ $ 1,835.00 @ $ 870.00 @ $ 4.00 Shawn O'Leary, Director Engineering and Ge e I Services ~O Subscribed and Sworn to before me this ~t2tvJ1e/L- Î g day, 2002. ~ûu~lliMw $ 1,988.00 $ 10,024.00 $ 17,000.00 $ 11,475.00 $ 5,720.00 $ 5,320.00 $ 2,100.00 $ 6,480.00 $ 7,700.00 $ 24,000.00 $ 16,450.00 $ 20,300.00 $ 5,196.75 $ 116,500.00 $ 35,200.31 $ 5,405.00 $ 9,175.00 $ 870.00 $ 480.00 S 301,384.06 S 15,069.20 $ 39,919.13 $ 11,482.73 $ 75,397.00 $ 443,252.12 Lieu Ann Nicola, City Clerk