Loading...
8.2 Levy Subdiv Assessments CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 11/25/02 TIME 4:00 P.M. AGENDA SECTION: NO. ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 8 Engineering & General Services BY: Shawn O'Leary ~ BY: - .,v ~~ " ITEM NO. 2 ITEM First reading of the ordinance levying special assessments for utility improvements to serve North Ohio Street, Project No. 01-1264. BACKGROUND On November 18, 2002, the City Commission received the final breakdown of costs for a public improvement project which involved special assessment financing. Following a review of the project, the City Commission scheduled a public hearing for December 2, 2002 and instructed the City Clerk to publish a notice of the public hearing and to mail a notice of the public hearing to each property owner in the benefit districts. This project was constructed in 2002. A map of the project location and summary of the total project costs are attached for your information. The public hearing, to be held next week, is intended to receive input from interested parties and particularly property owners within the special assessment benefit district. The primary issue at this point in the process is not whether the special assessments should be levied against the properties, but rather that the final costs have been properly calculated and distributed. To be in compliance with public notice requirements, staff is recommending that the City Commission approve the special assessment ordinance on first reading today and then conduct the public hearing as well as the second reading of the ordinance on December 5, 2002. Other key dates in the process are as follow: Dec. 5,2002 Publish assessment ordinance Mail final statements to property owners; begin pre-payment period 30-day pre-payment period ends Jan. 6, 2003 May, 2003 Scheduled date for bond closing RECOMMENDATION It is recommended the City Commission adopt Special Assessment Ordinance Number 02-10115 on first reading. NORTH OHIO STREET UTILITY IMPROVEMENTS PROJECT NO. 01-1264 TOTAL PROJECT COST (Including Water and Sanitary Sewer) 1 CONSTRUCTION STAKING 2 GRAVITY SEWER IN TRENCH, 8" 3 GRAVITY SEWER IN TRENCH, 10" 4 GRAVITY SEWER IN TRENCH, 12" 5 C-900 PVC GRAVITY SEWER IN TRENCH, 8" 6 C-900 PVC GRAVITY SEWER IN TRENCH, 10" 7 C-900 PVC GRAVITY SEWER IN BORE HOLE, 8" 8 C-900 PVC GRAVITY SEWER IN BORE HOLE, 10" 13 BORE HOLE, 12" 14 BORE HOLE, 14" 15 BORE HOLE, 16" 16 MANHOLE (0-6') 17 EXTRA DEPTH MANHOLE 19 WASTEWATER PUMP STATION 20 WATER PIPELINE IN TRENCH, 12" 21 WATER PIPELINE IN BORE HOLE, 12" 24 FIRE HYDRANT & VALVE ASSEMBLY 25 RECONNECTION OF EXISTING FH & V ASSEMBLY 29 COMPACTED BACKFILL SUBTOTAL: CITY ADMINISTRATION: ENGINEERING & CONTINGENCY: TEMPORARY NOTE INTEREST, BONDING, ISSUING: UTILITY EASEMENT & RNJ ACQUISITION: TOTAL: 1.00 loS. 358.00 loF. 680.00 loF. 425.00 loF. 220.00 . loF. 190.00 loF. 70.00 loF. 240.00 loF. 70.00 loF. 240.00 loF. 235.00 loF. 7.00 EA. 26.65 loF. 1.00 loS. 2,034.70 loF. 235.00 loF. 5.00 EA. 1.00 EA. 120.00 loF. ~O @ $ 1,988.00 @ $ 28.00 @ $ 25.00 @ $ 27.00 @ $ 26.00 @ $ 28.00 @ $ 30.00 @ $ 27.00 @ $ 110.00 @ $ 100.00 @ $ 70.00 @ $ 2,900.00 @ $ 195.00 @ $116,500.00 @ $ 17.30 @ $ 23.00 @ $ 1,835.00 @ $ 870.00 @ $ 4.00 Shawn O'Leary, Director Engineering and Ge e I Services Subscribed and Sworn to before me this í1JJUi2tvJrJe,fL I g day, 2002. ~Û1A lliMftLJ $ 1,988.00 $ 10,024.00 $ 17,000.00 $ 11,475.00 $ 5,720.00 $ 5,320.00 $ 2,100.00 $ 6,480.00 $ 7,700.00 $ 24,000.00 $ 16,450.00 $ 20,300.00 $ 5,196.75 $ 116,500.00 $ 35,200.31 $ 5,405.00 $ 9,175.00 $ 870.00 $ 480.00 $ 301,384.06 $ 15,069.20 $ 39,919.13 $ 11,482.73 $ 75.397.00 $ 443,252.12 Lieu Ann Nicola, City Clerk