8.4 Approve 2011 Sub-C.I.P. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 12/13/2010 TIME 4:00 P.M. AGENDA SECTION NO: 8 ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: ITEM NO. Page 1 FINANCE DEPARTMENT 4 BY: BY: Rodney Franz ITEM: Approval of the 2011 Sub-CIP. BACKGROUND: During the City's annual budget process, funding allocations are established to finance the routine smaller scale capital items that are typically paid for from cash resources. In order to meet vendor timing requirements for provision of vehicles and equipment for the 2011 year, those must soon be scheduled for bid award. The attached sheet shows the detailed list of projects to be undertaken and equipment to be acquired in 2011. Upon approval, staff will proceed to develop specifications/detailed proposals for purchase or implementation. For any items (or groups of items) exceeding $10,000 the City Commission will be requested to authorize each specific purchase, pursuant to our purchasing policy. Typically, implementation of the entire plan will occupy the bulk of the year. However, Phase I of the Vehicles and Equipment purchase is scheduled for bid award in early 2011 in order to meet model year schedules for the manufacturers. FISCAL NOTE: All requests are within budgeted amounts, with the exception of the General Fund Vehicles and Equipment Component, which shows a slight over-run. Staff recommendation is to defer acquisition of one of the two Fire Department's SUVs on the list, to determine if budget savings on the other items are sufficient to cover the additional vehicle. RECOMMENDED ACTION: Accept and authorize the 2011 Sub-CIP, authorizing staff to implement the plans and solicit bids and proposals as required by City policy. We anticipate that recommendations on the first phase of vehicles and equipment bid awards will be considered in early February, 2011. City of Salina 2011 Sub-C1P 12/912010 BUilDINGS & FACiliTIES Estimated Fund DeptJDiv. Proj. # Description Cost General Fund Police Administration Women's Locker Room $103,000 General Fund Building Maintenance Heaters in Memorial Hall $17,000 General Fund Building Maintenance Roof Repair-Building Maintenance offices and Cambell $24,500 plaza Stage General Fund Museum $14,000 Close and seal window wells General Fund Building Maintenance $10,100 Electrical Upgrades for the Concession Building General Fund Health Department $9,500 Fire Alarm system General Fund Fire $10,000 Kitchen Cabinets for Station # 4 General Fund Fire Concrete Replacement at Station #1 $8,000 BUDGET: $ 200,000 TOTAL GENERAL: $196,100 Sales Tax Sales Tax Sales Tax Museum Police Administration Fire Tuckpoint and Seal exterior and windows Women's Locker Room Generator for Station # 4 $74,900 $103,000 $22,000 Water/Wastewat WTP Water/Wastewat WTP Administration Building HVAC Control System Concrete one section of sludge drying beds $11,000 $50,000 BUDGET: $ 100,000 TOTAL WATER/WW: $11,000 TOTAL BUDGET: $ ESTIMATED COST TOTAL: YTD/BID COST TOTAL: REMAINING BUDGET: REMAINING FUNDS: $ 500,000 $407,100 $0 $92,900 500,000 City of Salina, Kansas 2011 Capital Budget 15 12/9/2010 City of Salina 2011 Sub-CIP PARK IMPROVEMENTS 12/9/2010 Estimated Fund DeptlDiv. Proj. # Description Cost Special Parks Parks Annual debt service, Burke Soccer fields $30,000 Special Parks Parks Special Parks portion of Smoky Hill Master Plan $100,000 Special Parks Parks Second year of new park sign installation $12,000 Special Parks Parks Walking path in "River Trail Park" $10,000 Special Parks Parks Recreation facility sign replacement $19,200 Special Parks Parks Ornamental fence, Oakdale Park $28,000 Special Parks Parks Lakewood earth fishing pier repair $4,500 Special Parks Parks New interactive display at Lakewood science room $2,500 Special Parks Parks Canoeing equipment at Lakewood $3,500 Special Parks Parks Lakewood Discovery Center painting and parking lot $5,000 repair Special Parks Parks Floating fishing pier extension $2,400 Special Parks Parks Prairie tree chipping $2,000 Special Parks Parks Roll cap for ECRA fields 1-4 & Matson $1 ,550 Special Parks Parks Two baseball pitcing mounds @ ECRA 3 and 4 $5,900 BUDGET: $ 230,000 TOTAL SPECIAL PARKS: $226,550 TOTAL CITY BUDGET: PRIVATE DONATIONS: ESTIMATED COST TOTAL: YTD/BID COST TOTAL: REMAINING BUDGET: REMAINING FUNDS: $230,000 $226,550 $0 $3,450 $230,000 17 City of SaUna 2011 Sub-CIP 12/9/2010 STREET REPAIR Estimated Fund DeptlDiv. Proj. # Description Cost Gas Tax Street Railroad Crossing $100,000 Gas Tax Street Mill and Inlay $550,000 Gas Tax Street Crack Sealing $300,000 Gas Tax Street Pavement Condition Inventory $40,000 Gas Tax Street Concrete Rehabilitation $250,000 Gas Tax Street Crawford and Ohio Intersection $350,000 Gas Tax Street East Cloud Street Design $200,000 Gas Tax Street BUDGET: $ 1,790,000 TOTAL GAS TAX: $1,790,000 Sales Tax Street Microsurfacing $700,000 BUDGET: $ 700,000 TOTAL SALES TAX: $700,000 TOTAL BUDGET: $ ESTIMATED COST TOTAL: $ YTD/BID COST TOTAL: $ REMAINING BUDGET: $ REMAINING FUNDS: $ 2,490,000 2,490,000 2,490,000 2,490,000 19 City of Salina 2011 Sub-CIP 12/9/2010 SIDEWALK & RAMPS Estimated Fund DeptJDiv. Proj. # Description Cost Gas Tax Streets ADA Ramp Construction $50,000 BUDGET: $ 50,000 TOTAL GAS TAX: $ 50,000 TOTAL BUDGET: ESTIMATED COST TOTAl: YTD/BID COST TOTAl: REMAINING BUDGET: REMAINING FUNDS: $50,000 $50,000 $0 $0 $50,000 20 City of Salina 2011 Sub-CIP 12/9/2010 TRAFFIC SIGNALS I INTERSECTIONS Estimated Fund DeptlDiv. Project # Description Cost Gas Tax Street Traffic Cameras at two Intersections $35,000 Gas Tax Street Retroreflectivity Sign upgrades $51,000 Gas Tax Street Battery Backups and LED Lights $51,340 BUDGET: $ 140,000.00 TOTAL GAS TAX: $137,340 TOTAL BUDGET: $ 140,000 ESTIMATED COST TOTAL: $ 137,340 YTD/BID COST TOTAL: $ REMAINING BUDGET: $ 2,660 REMAINING FUNDS: $ 140,000 21 City of Salina 2011 Sub-CIP VEHICLES & EQUIPMENT F d 0 t1o. 0 . t. Estimated un ep IV. escnp Ion Cost General Fire/Operations $35,000 General Fire/Operations $35,000 General Fire/Operations Ambulance unit (484) $188,000 General Fire/Operations Fire Station Alert System--Station 1 $35,000 Backbone General Fire/Operations Breathin Air Com ressor $22,000 General Fire Prevention Fire Marshall SUV $40,000 General EMS Zoll E Series Monitor Defibrillator $40,000 General EMS Stryker Power Cots (2) $24,000 General Police Operations Investigations Vehicle (1) $28,000 General Police Operations Police Patrol Units (4) $112,000 General Police Administratiom Phone System $15,384 General Public Works/Streets Salt Spreaders (2) $14,000 General Recreation ATV (3) $12,000 General Recreation Bannerman Diamond Master Groomer $5,500 BUDGET: $160,000 TOTAL SALES TAX: $160,000 Bicentennial Office/Adm Bicentennial Office/Adm Bicentennial All Bicentennial Operations Bicentennial Operations Telephone System PhotoCopier Mobile Radios and Base Unit Replace 500 Tables Snow Blower/Sweepster . . $12,500 $12,500 $24,000 $110,000 $4,000 WaterlWW WaterlWW WaterlWW WaterlWW WaterlWW WaterlWW WaterlWW Water/WW $45,000 $70,000 $13,500 $15,000 $45,000 $32,000 $30,000 $25,000 WD WD WTP WTP WWTP WWC WWC WWC BUDGET: $708,000 TOTAL WATER/WW: $275,500 TOTAL BUDGET: ESTIMATED COST TOTAL: Phase 1 Estimate: Phase 1 Total Bids Phase I Budget Savings YTD/BID COST: REMAINING BUDGET: $1,614,000 $1,176,384 $0 $0 $0 $1,614,000 22 12/9/2010 City of Salina 2011 Sub-CIP 12/9/2010 System Enhancements Estimated Fund DepUDiv. Project # Description Cost Solid Waste Solid Waste Perimeter Fencing $32,000 BUDGET: $ 32,000 TOTAL Solid Waste SUBTOTAL: $32,000 Utilities WTP Gypsum Hill Water Tower Painting $200,000 Utilities WTP Key Acres Water Tower Painting $270,000 Utilities WWC Sanitary Sewer Line Replacement $40,000 Utilities WWC Sanitary Sewer Point Repairs $65,000 Utilities WD Water Distribution Leak Detection $85,000 Utilities WWC Clean and Repair Sanitary Sewer from Pacific to Pine on Front Street $75,000 Utilities WWC Wastewater Pump Rehabilitation, Station # 5 and 24 $265,000 I BUDGET: $ 1,000,000 TOTAL WATERlWASTEWATER SUBTOTAL: $1,000,000 WWTP WWTP UV System Upgrade Repaint Three Final Clarifiers $100,000 $200,000 BUDGET: $ 1,030,000 EPASUBTOTAL: $300,000 TOTAL BUDGET: $ 2,062,000 ESTIMATED COST TOTAL: $ 1,332,000 YTD/BID COST TOTAL: REMAINING BUDGET: $ 730,000 REMAINING FUNDS: $ 730,000 23