Loading...
headwall structure westport add 11/23/1987DEAN BOYER, P.E. CITY ENGINEER November 23, 1987 Mr. Jerry L. Fowler, P.E. Vice President Stevens Contractors, Inc. Box 6197 Salina, Kansas 67402-6197 Re: Headwall Structure Westport Addition Dear Jerry: ENGINEERING DEPARTMENT 300 WEST ASH STREET P.O. BOX 736 1 LINA K?NSAS 6740.0]]6 'PEA CODE 9 � 3 827-9181 DONALD E. HOFF, P.E. ASST CITY ENGINEER D.W. BASSETT TRAFFIC ENGINEER This letter will serve as your authorization to begin construction of the headwall structure on the Dry'Creek Channel - Salina Flood Protec- tion System adjacent to the Westport Addition. We accept your proposal, dated November 5, 1987, which states your firm will provide all material and labor to complete the headwall structure in accordance with the enclosed detailed drawing (dated 10-87). The lump sum bid for this work is $7,800.00 with a completion date of April 1, 1988. Thank you for your assistance. Sincerely, Don Hof ,' .E. DI Enc: (3) drawings MEMBER ... KANSAS LEAGUE OF MUNICIPALITIES - NATIONAL LEAGUE OF CITIES