s. industrial area water 12/15/1969SOUTH INDUSTRIAL AREA WATER
Property owners other than Coleman Company will pay upon receiving water
service $1,000.00 plus $1.90 per foot the following:
DOYLE AND DOROTHY YOCKERS
428
FEET
GRISWOLD SEED CO.
100
"
FRISBY CONSTRUCTION CO.
400
"
DUANE PATTERSON
400
"
RAY GRUBER
100
"
RICH WOREL
100
"
E.. W. BLAIR, INC.
100
to
GUYS NUTS & POTATO CHIPS
100
"
LORENSONS
200
It
MAI STEEL CO.
740
"
HARBIN CONSTRUCTION CO.
100
"
LEE HAWORTH� 1 /
60
"
GENERAL AIRrnun—w,.P4410o"mita
100
n
NORTH KANSAS SAVINGS /
344
It
THELMA HOGERFY
75
is
SALINA CONCRETE PRODUCTS
263
It
TOTAL: 3,610
@ $1.90 $ 813.20
" "
190.00
"
760.00
"
760.00
it "190.00
It 11190.00
it it
190.00
" it
190.00
It
380.00
Itto
1,406.00
it190.00
to "114.00
11 It
190.00
It 11653.60
It 11142.50
It to
499.70
CITY ENG
DECEMBER
, 1969
$6,859.00
DISTRIBUTION OF COST
WATER MAIN
JOB 517
Property to pay $100.00 per acre or a minimum of $1,000.00 plus their pro -rata
share of a 6" water main based on front footage.
SHARE OF
BLOCK 1 - SOUTH FRONT COST FOR LINE.
INDUSTRIAL AREA OWNER FOOTAGE ACRES ACREAGE PRO -RATA TOTAL
LOT 1, 2, W. h 3
YOCKER
427.86
1.84
$1,000.00
$1,073.29
$ 2,073.29
E� LOT 3
GRISWOLD
100.00
0.43
1,000.00
250.86
1,250.86
LOTS 4 AND 5
FRISBY
400.00
1.72
1,000.00
1,003.41
.2,003.41
LOTS 6 AND 7
PATTERSON
400.00
1.72
1,000.00
19003.41
2,003.41
W.h LOT 8
GRUBER
100.00
0.43
1,000.00
250.86
1,250.86
E.h LOT 8
WARD
100.00
0.43
1,000.00
250.86
1,250.86
W.; LOT 9
BLAIR
100.00
0.43
11000.00
250.85
1,250.85
E.k LOT 9
GUYS
100.00
0.43
11000.00
250.85
1,250.85
LOT 10
LORENSON
200.00
0.86
1,000.00
501.70
1,501.70
LOTS 13 AND 14
COLEMAN
327.76
1.97
1,000.00
822.19
1,822.19
LOTS 15, 16, 17
W. 140' LOTS 18
MIA
740.00
4.46
1,000.00
1,856.30
2,856.30
E. 60' LOT 18,
W. 40' LOT 19
HARBIN
100.00
0.60
1,000.00
250.85
1,250.85
E. 60' OF W.
100' LOT 19
E.;5 LOT 19
HAWORTH/
60.00
0.36
1,000.00
150.51
1,150.51
ENER,-A-IR�h`•
100.00
0.60
1,000.00
250.85
1,250.85
E. 125' -LOT 20
AND LOT 21
N.K.S.
344.00
2.07
11000.00
862.93
1,862.93
W. 75' LOT 20
HOGERFY
75.00
0.45
1,000.00
188.14
1,188.14
LOT 22
SALINA,CONCRETE
262.50
3.04
%000.00
658.49
1,658.49
TOTAL:
3,937.12
21.84
$17,000.00
$9,876.35
$26,876.35
D. W. BASSETT, ASSISTANT CITY ENGINEER
SUBSCRIBED AND.SWORN 70 BEFORE ME THIS DAY OF 19
D. L. HARRISON, CITY CLERK