Loading...
mprr north and front improvements 6/3/1977(Tory ®r SAILANA �y� emua. :I r ._ .. ✓ ENGINEERING DEPARTMENT DEAN BOYER. P. E. 300 WEST ASN STREET - D. W. BASSETT CITY ENGINEER P. O. DOK 746 ASST. CITY ENGINEER SALINA. KANSAS 67401 ARCA CODE 913 827 9461 June 3, 1977 ) District Engineer Missouri Pacific Railroad Co. 6400 Martin Avenue Kansas City, Missouri 64120 �[ . C Attention: Mr. T. L. Gibson Dear Mr. Gibson: We plan to begin actual construction on street improvements, in Salina, on North Street and on Front Street in approximately 60 days. This work will involve the construction of concrete headers adjacent to your railroad roadway at the above locations. Enclosed are copies of drawings showing the general construction details of proposed improvements and limits of construction. We hope a meeting could be arranged, in our office, in the near future to discuss your specific requirements, time schedules, construction methods, etc. If you have questions regarding this project, please call us. Sincerely, ZZA` -Don- Hoff, P.E. Design Engineer DH:MKP ENC: (2) MEMBER ... KANSAS LEAGUE OF MUNICIPALITIES - NATIONAL LEAGUE OF CITIES