usps mail facility 8/12/1982ILS O N
COMPANY11
ENGINEERS 6
ARCHITECTS
T./.x... 41730a WILC06 SAL
0133 627-04333
Off/c. Loo.fbn... 631 EAST CRAWFORO AVE. ■ SALIN^. KANSAS 67401
M.11inp Actor...... P.O. BOX 1645 ■
12 August 1982
Union Pacific Railroad
Attn: Mr. W.A. Ridge
Superintendent
P.O. Box 2309
Kansas City, Kansas 66110
Re: United States Postal Service
General Mail Facility
Salina, Kansas
WCEA File: 82-053
Mr. Ridge:
SALIN^. KANSAS 67401
ENOIN66RS
ARCHITECTS
PLANNERS
An Equal Opportunity ■
Empby.r
Our Company has been retained to prepare plans and specifications for the
new Post Office in Salina. The site for this facility is the block bounded
by Fifth Street on the west, Fourth Street on the east, Elm Street on the
north and Ash Street on the south. All existing buildings on this site
will be demolished. The entire block will be occupied by the new Post
Office.
Construction on this site will require relocation of an existing 24 -inch
sanitary sewer. Constructing the new sewer along the east edge of the site
appears to provide the most space for construction. From a maintenance
�y7 standpoint, the better route would be approximately ten feet east of the
lLi( east property line. Construction along this route would require abandoning
an existing spur track as shown on the enclosed print.
At this time the United States Postal Service foresees no need for rail
service at .this site.
We would appreciate you reviewing the proposed construction and notifying
us if this is acceptable to the Union Pacific. If the proposed route is
acceptable, we would appreciate knowing of any special requirements for
removal and salvage of the rails, ties and ballast.
SALIN^. KS 0 KANSAS CITY. KS ■ WICHITA. KS ■ ALBUQUERQUE. NM
Union Pacific Railroad
12 August 1982
Page 2
For your information, we are enclosing a copy of a letter from L.F. Hower
regarding ownership of the proposed sewer route.
If you have any questions regarding this request, please contact us.
WILSON & COMPANY
James C. Dowell, P.E.
Enc.
cc: Herb Schmeltz, USPS
Mr. Walling, Union Pacific Railroad
Mr. Don Hoff, Salina City Engineering Dept.
Q
-ciw
IP
0
Ta
ILS L P ly
COMPANY
ws�heaa.a 1
AecMITaeTf
UNION PACIFIC CORPORATION
P.O. BOX 2500 — BROOMFIELD. COLORADO 80020 — (303) 469.7721
P. J. EMANUEL
REGIONAL MANAGER OF PROPERTY TAXES
D. J REIFF -
REGIONAL SVS*EM TAX AGENT
i
July 22, 1982
420
Mr. Darrel Lemon
Assistant Saline County Appraiser
300 West Ash St.
Salina, KS 67401
Dear Mr. Lemon:
I am attaching a copy of Union Pacific Railroad
Company's right of way map in the City of Salina on
our McPherson Branch with owned parcels outlined. As
mentioned yesterday on the telephone, Union Pacific
does not own the land underlying trackage on Fourth
Street north of Prescott Street. Taxes are paid, how-
ever, on the basis of an assessment per mile as deter-
mined on the Kansas Department of Revenue. Therefore,
taxes have been paid on the railroad facilities along
Fourth Street. The 1982 assessed value per mile of
main track of the McPherson Branch is $35,796.72 and
$4,687.57 per mile for side track.
Please contact me if you have any further
questions.
Very truly your s,
L. F. ower
Senior Tax Agent
LFH/bw
Attachment
L I. SHIRLEY
D. R. DeBAR
R. D. FREDERICKS
SENIOR TAX AGENT
L F. HOWER
TAX AGENT
e
ILSON
COMPANY
417303 WILCOE SAL
ENGINEERS
ARCHITECTS 913 327-0433
Office Location... 631 EAST CRAWFORO AVE. ■ SALINA. KANSAS 67401
Mailing Adcf a.a... P.O. Box 1646 ■
Dean Boyer, P.E.
City Engineer
City of Salina, Kansas
300 West Ash
Salina, KS 67401
Attn: Don E. Hoff, P.E.
Assistant City Engineer
SALINA. KANSAS 67401
Re: Width of Driveway for New Post Office at
Fifth and Ash Streets
WCEA File: 82-053
Dear Sir:
ENGIN EERS
ARCHITECTS
PLANNERS
An Equal Opportunity ■
Employer
We respectfully request exceptions to the maximum of 30 feet for driveways
as noted in Section 35-132 of the Salina Code effective January 1, 1983.
The requested exceptions are:
1. The access off Ash Street for the public parking area south of the new
postal building. The proposed width of this driveway is 33 feet back
to back of curb. Ingress and egress to this parking area without
encroaching on the other driveway traffic lane requires this width.
2. The access off Fifth Street for the mail trucks. The proposed width
of this driveway is 41'-4" back to back of curb. Ingress and egress
of the tractor -trailer mail trucks for the loading dock area require
extra width. If the proposed width is not provided, encroachment into
the opposing traffic lane on Fifth Street will result.
The proposed driveway widths are the same as those discussed with you in
November 1982.
Enclosed is a print of the paving, grading and drainage plan for your use
during review of this request.
We appreciate your consideration of this request.
WILSON & COMPANY
Charles D. May, P.E.
Enclosure
-slw
SALINA, KS • ALBUQUERQUE, NM • COLORADO SPRINGS, CO • HAYS, KS • KANSAS CITY, KS • PHOENIX, AZ • WICHITA, KS
iCITY OF SALINA
DEAN BOYER. P. E.
CITY ENGINEER
ENGINEERING DEPARTMENT
300 WEST ASH STREET
P. O. BOX 798
SALINA. KANSAS 87901
AREA CODE 913 827.9981
February 18, 1983
Mr. Charles D. May, P.E.
Wilson & Company
P.O. Box 1648
Salina, Kansas 67401
Re: Driveway Approach Widths
New Post Office Site
Dear Sir:
DONALD E. HOPP. P. E.
ASST. CIT' ENGINEER
D. W. BASSETT
TRAFFIC ENGINEER
We have reviewed your request to allow the construction of an
approach on Ash Street (33 feet wide) and of an approach on 5th Street
(41.33 feet wide).
It is our determination that the wide driveway approaches, as
shown on your drawing (G-2), will not create additional hazards to the
general public. Therefore, we grant a special exception to Section
35-132 of the Saline Code and will allow the two (2) driveway approaches
to be constructed as shown on the drawing (G-2).
DH:as
Sincerely,
Don Hoff, P.E.
MEMBER ... KANSAS LEAGUE OF MUNICIPALITIES • NATIONAL LEAGUE OF CITIES
VYI LS ON
COMPANY
417303 WILCOE SAL
ENGINEERS
A R C H I T E C T S 913 827-0433
Offioa LCCaf/On... 631 EAST CRAWFOR0 AVE. ■ SALINA. KANSAS 87401
Admit ,Q Adcf aev... P.O. BOX 1648 ■ SALINA. KANSAS 67401
8 September 1983
Bob Albers
Bob Albers Construction, Inc.
1624 E. Cloud
Salina, KS 67401
Re: General Mail Facility
USPS Project No. K-10-081
Salina, Kansas
WCEA File: 82-053A
Bob:
ENGINEERS
ARCHITECTS
PLANNERS
An Equa/ Opportunity 0 ■
Emp/oyer L
This is a follow-up of our telephone conversation on 8 September 1983.
OExcavation has started on Ash Street for the sanitary sewer line. This
trench is approximately 22 feet deep and it is our opinion that established
safety procedures are not being followed for personnel protection.
Paragraph 10, Page IA -2 in the Contract Documents requires that the Contrac-
tor is to comply with the safety provisions of applicable laws and building
construction codes.
Your follow-up action on this item will be appreciated by all parties.
WILSON & COMPANY
u Charli`��y
,b
cc: Herbert Schmeltz
wmh
Don Hoff i� v
1
oel
SALINA, KS • ALBUOUEROUE. NM • COLORADO SPRINGS, CO HAYS. KS KANSAS CITY, KS PHOENIX. AZ WICHITA, KS
V(V I L S ON
E COMPANY
ENGINEERS
ARCHITECTS
Tal�x... 417909 WILCOE SAL
013 627-0433
OfRca Looafio ... 691 EAST CRAWFORC AVE. ■ SALINA. KANSAS 67401
"MIirsp Addrooe... P.O. BOX 1646
13 September 1983
Bob Albers
Bob Albers Construction
1624 East Cloud
Salina, Kansas 67401
■ SALINA. KANSAS 67401
Re: General Nail Facility
USPS - Proj. No. K-10-081
Salina, Kansas
WCEA File: 82-053A
.Bob:
ENGINEERS
ARCHITECTS
PLANNERS
An Equal Opportun/ty ' ■
Emp/oyar L
While we are not responsible for the safety measures on this project, after
consultation with our client, we were directed to call to your attention
O that, in our opinion, your trenching methods do no meet normal construction
practice nor the applicable codes for such work. This includes trenching,
shoring and trench box on-site.
Our opinion is based on observations of the trenching and supports on many
y� other projects.
r We strongly recommend that before you continue with this work you assure
eeesss yourself that the trenching and trench supports do meet required standards.
WILSON & COMPANY
Charlie A. Stanley
cc: Herbert Schmeltz
-ciw
SALINA. KS ALSl1OUEROUE. NM • COLORADO SPRINGS. CO • HAYS. KS • KANSAS CITY. KS • PHOENIX. AZ WICHITA. KS
x
ILSON�_
COMPANY
ENGINEERS
Ta/ax... 417303 WlLC Ez SAL
ARCHITECTS via 827-04s3
Office Locafion... 631 EAST CRAWRORO AVE. ■ SALINA, KANSAS
Mai/inp Addrasa... P.O. BOX 1646 ■
17 November 1983
Don Hoff
300 W. Ash
Salina, KS 67401
Re: USPS Project No. K-10-081
General Mail Facility
Salina, Kansas
WCEA File: 82-053A
Don:
ENpINEERS
ARCHITECTS
PLANNERS
An Equa/ Opportunity � ■
Employer L
SALINA. KANSAS 67402-1646
This letter is written to confirm our telephone conversation today approv-
ing taking the existing 12" waterline in Elm Street out of service for less
than one day to connect the new 12" line.
WILSON & COMPANY
James C. Dowell, P.E.
cc: Herbert S. Schmeltz, USPS, Project Manager
Bob Albers Construction, Inc., Salina
RA Batt/CA Stanley - WCEA
wmh
SALINA, KS • ALBUQUERQUE, NM • COLORADO SPRINGS, CO • HAYS, KS • KANSAS CITY, KS • PHOENIX, AZ • WICHITA, KS
FROM: JC Dowell
i
TO: RA Batt
COPIES TO:
SUBJECT:
MEMORANDUM
Herbert S. Schmeltz, USPS;
LB66 Hoff, Salina Engineering Dept.
USPS - GMF
ILSO Y
COMPANY
ENOIesaAf
A atm H CCT!
DATE: 16 August 1982
FILE NO: 82-053
JC Dowell met with Don Hoff and Dean Boyer, Utilities Director, to discuss
several items regarding the water and sewer relocations. The Pre -Concept
Submittal Preliminary Plan and Site Layout was reviewed in detail. The
following items were discussed:
1. The City will insist that the new 12 -inch waterline be connected to an
existing 12 -inch line rather than the 10 -inch line located in Ash Street.
This will require an additional fifty feet of 12 -inch line, but will elimi-
nate one street crossing as shown on the Pre -Concept Submittal.
2. The City approved the concept of abandoning the existing railroad spur
on the east side of the site for construction of the new sewer line. Mr.
Hoff suggested that Wilson & Company contact Mr. Ray Norvell with Union
Pacific in Kansas City.
3. Mr. Hoff will forward a copy of correspondence from the UPRR that
states the City still owns the 4th Street right-of-way.
4. Mr. Hoff supplied copies of City standard meter setting details. The
Owner will be required to furnish the meter vault and yoke. The City will
furnish and install the meter.
5. Pre -cast concrete manholes are acceptable for sewer construction.
6. All existing easements and alley rights-of-way have been vacated.
wmh