Loading...
park west add preliminary plat 3/9/1976March 9, 1976 TO: Keith Rawlings, Director of Planning FROM: Don Hoff, Design Engineer SUBJECT: Park West Addition - Preliminary Plat Our department has completed a review of the preliminary plat of the proposed Park West Addition, and we submit the following comments: (1) The drainage plan indicates that surface runoff from the rear of Lots 7-11, Block D, will flow into the old Dry Creek channel, thence southwesterly to the new Dry Creek diversion channel. In order to cause the old channel to reverse it's normal flow direction, some channel regrading will be required. No dedicated right-of-way or easement is shown on the preliminary plat to permit this construction and maintenance work to be accomplished. (2) Will the entrance, shown at the rear of Lot 8, Block 3, remain? If so, will the drainage structure at this entrance need to be re -sized? (3) A drainage structure with control gates will be required to re -open the plug in the old Dry Creek channel west of Lot 7, Block D. Additional construction work will be required to enlarge the existing control structure on the new Dry Creek diversion channel, due to the increased quantity of storm runoff water. Sincerely yours, Don Hoff, P.E. Design Engineer DH:MKP