sewer ext. airport auth 6/1980State of Kansas
Division of Environment
APPLICATION FOR SEWER EXTENSION PEM41T
u L
Salina Airport Authority hereby uis application for a permit
(Name of Municipality, Public Sewer District or Person)(,�i9�
JUL 1
to extend its system of sanitary sewers served by a wastewater treatment'�j}t0yiow operating
Cit yy• D�IVV��a�l(�rfr111�
under Kansas Nater Pollution Control Permit Number M-SA20-I002 � &PV'IUne
19 80, in the manner indicated by the plans, specifications, and other data attached hereto.
Any municipality, township, county, or legally constituted sewer district, etc., wishing to
extend its sanitary sewer system is required by K.S.A. 65-165 and R.S.A. 65-166 to submit an
Application for Sewer Extension Permit and plans and specifications for the proposed sewer
extension for review by the Division of Environment. Plans and specifications submitted mus'
..nww.1.....4*7. n4v4e4,- ,.f 9....,4� .....e..*,e MM4..4..e.w. C*.nAarAa ,.f nne4,... fnr Lla*ur Dn1ln*inn rnnf_tr
1. What are the conditions and e-apacity of the existing receiving sewer system:
a. Do surcharge or bypass conditions exist in the receiving sewer line(s)?
If so, what is the location(a)?
No
b. What steps are being taken to eliminate the conditions identified in I.e.? N/A
c. Do bypass conditions exist at downstream receiving pump stations? No
if so, what is the location?
d. What steps are being taken to eliminate the conditions identified in 1.c.7
e. Are combined sewers used for transporting wastewater flows to the treatment facility?_
No
2. Please provide the following information concerning the waste treatment facility which will
receive the flow from the proposed extension:
a. What is the present average daily flow at the facility?
0.5 MGD
b. Does the facility have a bypass? N0 , Type
Estimated Frequency of Bypass , Estimated Volume of Bypass
3. What is the legal name of the addition, subdivision, benefit district, etc., which will be
directly served by the sewer extension? Schilling Addition
4. What is the name and certificate number of the certified operator and the name of the legal
jurisdiction which will treat the wastes? City of Salina, Kansas
5. What are the lengths and sizes of the sewer line to be built? 5,400 L.F. 4" C.I.
6. Now many manholes and cleanouts will be built? N/A
7. If wastewater pumping facilities are included in the project, provide the following informa-
tion:
a. Number of Pumps 2 , b. Capacity and Head0O gpm @43; c. TypeCentrifugal
d. Method of Control—Mercury Tip Switch , e. Type of Alarm Li"ght
f. Control Eelvations: Low Level On 1266 High Level on 1267 , Alarm 1268
Pumps Off 1265
g. Type of alternative power or bypass prevention provided? None (Line Storage)
S. Are any of the proposed sewer lines or other facilities within a flood plain? No
Are any new service connections located in a flood plain? No
9. Provide the following information concerning the estimated use of the proposed extension:
a. Per capita design flow N/A gpd.
b. Capita per single family dwelling unit N/A
Capita per multifamily dwelling unit
c. Probable number of single family dwellings connected first year N/A , maximum
number , in what time span
d. Probable number of multi -family dwellings connected first year N/A
number , in what time span
e. Probable number and estimated flow of office or light commercial units connected first
year 2 unit;.Olmgd maximum number 5 unit;.05mgd, in what time span 5 Years
f. Probable number of commercial and industrial plants to be connected. Specify for each:,_,
estimated flow gpd, pounds of SODS , major activity
Number of employees , and number of shifts (Attach separate sheet if -
necessary).
10. Give the name of the firm responsible for engineering. White, Hunsley & Associate
11. Who will provide full time engineering observation of the construction?
12. The information contained above is accurate to the best of my knowledge.
(Signed) / ` / / ��` 7? ler•
Mailing Address: R. R. 4, Box 26
Salina, Kansas 67401
in making application for "a sewer extension permit, I hereby certify that continuous engineering
observation of the constriction of the proposed improvements, including building connections,
shall be provided in accordance with Kansas Department of $ealth and Environment Regulation
28-16-55. /
(Signed)
Title: Mayor
Mailing Address: City -County Building
Salina, Kansas 67401