mayfair add. wastewater extension 12/5/1989 (2)March 12, 1990
Engineering Department
300 West Ash Street
P.O. Box 736
.
Salina, KS 67402-0736
Mr. Robert Marietta
Telephone (913) 827-9481
148 South Seventh Street
Salina, Kansas 67401
Re: Sanitary Sewer Extension
Mayfair Addition
Dear Mr. Marietta:
All of the necessary permits and approvals have been received
by our office for the construction/installation of a sanitary
sewer extension to serve a majority of Block 5, Mayfair
Addition. You may, therefore, proceed to have your contractor
commence construction work.
The contractor will be required to furnish the normal
certifications for the clay pipe, manholes, castings, etc.
If you have any questions concerning this project, please
contact me.
Sincerely,
]� /Z�� -
Don Ho�.`E.
DH/mp
cc: ZAF & Associates
Stevens Contractors, Inc.
Salina
hr**2d
ALL -AMERICA CRY
'
Ing
DIRECTOR
-
OF ENGINEERING
DONALD E. HOFF, P.E.
MEMBER ... LEAGUE OF KANSAS MUNICIPALITIES NATIONAL LEAGUE OF CITIES
State of Kansas
Mike Hayden, Governor
Department of Health and Environment
a
t
Division of Environment (913) 296.1535
Stanley C. Grant, Ph.D., Secretary Forbes Feld, Bldg. 740, Topeka, KS 666200002 FAX (913) 2966247
March 19, 1990
Mr. Elmer Zerr, PE
ZAF & Associates
PO Drawer M
Colby, Kansas 67701
Re: Water Distribution System for Mayfair Addition
Salina, Kansas
KDHE Project #21234
Dear Mr. Zerr:
The plans and specifications for the referenced project have been reviewed and
approved. The city may proceed with construction. One set of plans and
specifications will be retained for our files. The remaining sets and/or cover
sheets are being returned herein bearing the approval stamp of the Division of
Environment.
Please notify us in writing when the work is finished and reference KDHE Project
No. 21234. Your notification must include a statement that the work was
completed in conformance with the approved plans and specifications. Neither
post -construction inspection by the State nor issuance of a public water supply
permit will be necessary.
Please direct any questions or remarks pertaining to this project to me at (913)
296-5505.
Sincerely yours,
Steve Gyorog, Envir7ecgtrion .
Public Water Supply
Bureau of Water
SG:lw
PC: North Central District
off, City of Salina
as Konigsberg, Jr., M.D., M.P.H., James Power, P.E, Lome Phillips, Ph.D., Roger Carlson, Ph.D.,
for of Health Director of Environment Director of Information Director of the Kansas Health
2961343 (913) 296.1538 Systems and Environmental Laboratory
(913) 2961415 (913) 2961819
President:
ELMER G. ZERR, P.E.
P. 0. Drawer M
Colby, Kansas 67701
(913) 462-6992
ENGINEERING • SURVEYING • MAPPING • PLANNING
March 9, 1990
Don Hoff, P.E.
City Engineer
City of Salina
P.O. Box 736
Salina, Kansas 67402-0736
RE: Wastewater Collection System Improvements
Mayfair Addition
Salina, Kansas
Project No. 89-099
Dear Don,
Vice -President
GALEN L. FORGY, R.L.S.
1043 Greeley
Salina, Kansas 67401
(913) 827-9710
As per our telephone conversation, we submit this correspondence as verification
of the sewer pipe type on the above referenced project. The Contractor, Stevens
Contractors, Inc., will install Vitrified Clay Pipe on the above referenced
project. As per our specifications, Manufacturer's Certifications will be
provided to the City of Salina in order to meet the quality assurance requirement.
Thank you.
Yours truly,
Ger
President
EGZ/1
copy to Stevens Contractors, Inc.
Fbrgy Surveying
UTILITIES CONTRACTORS
SALINA, KANSAS 67401-0197
March 22, 1990
Mr. Don Hoff, P.E.
City of Salina
P.O. Box 736
Salina, Kansas 67402-0736
Cc
� irii �'
(913) 827.4458
Dear Don:
Enclosed are ductile iron pipe certifications for the 12" DIP line on Waterwell
Road and 6" DIP for Mr. Marietta's Mayfair Addition.
Sincerely,
STEVENS CONTRACTORS, INC.
Charles E. Stevens, Jr.
President
CES/maa
Enclosures
GRIFFIN PIPE PRODUCTS CON
CERTIFICATE OF COMPLIANCE
Plant COUNCIL BLUFFS, IOWA
Date MARCH 12, 1990
NAME STEVENS CONTRACTING INC
P. 0. BOX 6197
SALINA, KANSAS 67402
PROJECT CITY OF SALINA, KANSAS
OUR ORDER NO.
Unit I Material
6" SUPER BELL -TITS DUCTILE -IR)N PRESSURE PIPE, CLASS 52 C/L
8" SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
12" SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
We certify that the material listed above was manufactured and tested in accordance with the following
specifications, where applicable, and meet the requirements of these specifications.
Ductile Iron Pipe: ANSI/AWWA C151/A21.51 Latest Revision
Super Bell -Tito and Mechanical Joints: ANSI/AWWA C111/A21.11 Latest Revision
Standard Gray -Iron and Ductile -Iron Fittings: ANSI/AWWA C11C/A21.10 Latest Revision
Compact Ductile -Iron Fittings: ANSI/AWWA C153/A21.53 Latest Revision
Cement -Mortar Lining: ANSI/AWWA C104/A21.4 Latest Revision
Subscribed and sworn to before me
>Is hlay
of CH , 1890
1 Notary P.bli.
My Commission expires -9-90
AMSTED INDUSTRIES INCORPORATED
�GRIFFIN PIPE PRODUCTS CO. DIVISION
Title REGIONAL SALES SUPERVISOR
Form #1842 - Rev. 2/85 ........ AUnsted
GRIFFIN PIPE PRODUCTS CO.
CERTIFICATE OF COMPLIANCE
Plant COUNCIL BLUFFS, IOWA
Date MARCH 12, 1990
NAME STEVENS CONTRACTING INC
P. 0. BOX 6197
SALINA, KANSAS 67402
PROJECT CITY OF SALINA, KANSAS
OUR ORDER NO.
it
Unit I Material
6" SUPER BELL -TITS DUCTILE IR)N PRESSURE PIPE, CLASS 52 C/L
8" SUPER BELL-TITE DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
12" SUPER BELL-TITE DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
We certify that the material listed above was manufactured and tested in accordance with the following
specifications, where applicable, and meet the requirements of these specifications.
Ductile Iron Pipe: ANSI/AWWA C151/A21.51 Latest Revision
Super Bell -rite and Mechanical Joints: ANSI/AWWA C111/A21.11 Latest Revision
Standard Gray -Iron and Ductile -Iron Fittings: ANSI/AWWA C11O/A21.10 Latest Revision
Compact Ductile -Iron Fittings: ANSI/AWWA C153/A21.53 Latest Revision
Cement -Mortar Lining: ANSI/AWWA C104/A21.4 Latest Revision
Subscribed and sworn to before me
=:2r
iay of CH , 1890
Nanry Public
My Commission expire• -9-90
AMSTED INDUSTRIES INCORPORATED
%GRIFFIN PIPE PRODUCTS CO. DIVISION
Title REGIONAL SALES SUPERVISOR
Form 01842 - Rev. 2/85 ........ Ainl8hd
..........
GRIFFIN PIPE PRODUCTS CO.
CERTIFICATE OF COMPLIANCE
Plant COUNCIL BLUFFS, IOWA
Date MARCH 12, 1990
NAME STEVENS CONTRACTING INC
P. 0. BOX 6197
SALINA, KANSAS 67402
PROJECT CITY OF SALINA, KANSAS
OUR ORDER NO.
it
Unit I Material
6" SUPER BELL -TITS DUCTILE I10 N PRESSURE PIPE, CLASS 52 C/L
8" SUPER BELL-TITE DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
1211 SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
We certify that the material listed above was manufactured and tested in accordance with the following
specifications, where applicable, and meet the requirements of these specifications.
Ductile Iron Pipe: ANSI/AWWA C151/A21.51 Latest Revision
Super Bell-Tite and Mechanical Joints: ANSI/AWWA C111/A21.11 Latest Revision
Standard Gray -Iron and Ductile -Iron Fittings: ANSI/AWWA C110/A21.10 Latest Revision
Compact Ductile -Iron Fittings: ANSI/AWWA C153/A21.53 Latest Revision
Cement -Mortar Lining: ANSI/AWWA C104/A21.4 Latest Revision
Subscribed and sworn to before me
ffiia ? lkley of r CH ,1990
1 Notary PubHe
My Commission expires__ -g-90
AMSTED INDUSTRIES INCORPORATED
GRIFFIN PIPE PRODUCTS CO. DIVISION
0
Title REGIONAL SALES SUPERVISOR
Form #1842 - Rev. 2/85 ,,,,,,-, A>alibat
GRIFFIN PIPE PRODUCTS CON
CERTIFICATE OF COMPLIANCE
Plant- COUNCIL BLUFFS, IOWA
Date MARCH 12, 1990
NAME STEVENS CONTRACTING INC
P. 0. BOX 6197
SALINA, KANSAS 67402
PROJECT CITY OF SALINA, KANSAS
OUR ORDER NO.
a
Unit I Material
6" SUPER BELL -TITS DUCTILE I10 N PRESSURE PIPE, CLASS 52 C/L
8" SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
12" SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
We certify that the material listed above was manufactured and tested in accordance with the following
specifications, where applicable, and meet the requirements of these specifications.
Ductile Iron Pipe: ANSI/AWWA C151/A21.51 Latest Revision
Super Bell -Tito and Mechanical Joints: ANSI/AWWA C111/A21.11 Latest Revision
Standard Gray -Iron and Ductile -Iron Fittings: ANSI/AWWA C110/A21.10 Latest Revision
Compact Ductile -Iron Fittings: ANSI/AWWA C153/A21.53 Latest Revision
Cement -Mortar Lining: ANSI/AWWA C104/A21.4 Latest Revision
Subscribed and sworn to before me
ipb play air CH PubL90,,10
My Commission expire
AMSTED INDUSTRIES INCORPORATED
GRIFFIN PIPE PRODUCTS CO. DIVISION
eti--
Title REGIONAL SALES SUPERVISOR
Forth #1842 - Rev. 2/85 ,-,„,.,pia
GRIFFIN PIPE PRODUCTS COS
CERTIFICATE OF COMPLIANCE
Plant COUNCIL BLUFFS, IOWA
Date MARCH 12, 1990
NAME STEVENS CONTRACTING INC
P. 0. BOX 6197
SALINA, KANSAS 67402
PROJECT CITY OF SALINA, KANSAS
OUR ORDER NO.
Ix
Unit I Material
6" SUPER BELL -TITS DUCTILE IM N PRESSURE PIPE, CLASS 52 C/L
8" SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
12" SUPER BELL -TITS DUCTILE IRON PRESSURE PIPE, CLASS 52 C/L
We certify that the material listed above was manufactured and tested in accordance with the following
specifications, where applicable, and meet the requirements of these specifications.
Ductile Iron Pipe: ANSI/AWWA C151/A21.51 Latest Revision
Super Bell -Tito and Mechanical Joints: ANSI/AWWA C111/A21.11 Latest Revision
Standard Gray -Iron and Ductile -Iron Fittings: ANSI/AWWA C11O/A21.10 Latest Revision
Compact Ductile -Iron Fittings: ANSI/AWWA C153/A21.53 Latest Revision
Cement -Mortar Lining: ANSI/AWWA C104/A21.4 Latest Revision
Subscribed and sworn to before me
this 'Uay of CH 1990
1 N.Wy Pub 1.
My Commission expires__ -9-90
Form 01842 - Rev. 2/85
AMSTED INDUSTRIES INCORPORATED
GRIFFIN PIPE PRODUCTS CO. DIVISION
By Zy "I"',
Title REGIONAL SALES SUPERVISOR SALES SUPERVISOR
........ Alnsbd
...........
President:
ELMER G. ZERR, P.E.
P. O. Drawer M
Colby, Kansas 67701
(913) 462-6992
ENGINEERING • SURVEYING • MAPPING • PLANNING
March 23, 1990
Don Hoff, P.E.
City Engineer
City of Salina
P.O. Box 736
Salina, Kansas 67402-0736
RE: Water Distribution System
Mayfair Addition
Salina, Kansas
Project No. 90-015
L�Sil.:ii1i
Vice -President
GALEN L. FORGY, R.L.S.
1043 Greeley
Salina, Kansas 67401
(913) 827-9710
As per our telephone conversation, we submit this correspondence as verification
of the type of water distribution line pipe for the above referenced project.
The Contractor, Stevens Contractors, Inc., will install Class 52, Ductile Iron
Pipe on the above project. As per our specifications, Manufacturer's
Certifications will be provided to the City of Salina in order to meet the
quality assurance requirement.
Thank you.
Yours truly,
toemer G. Z�� .E.
President
EGZ/l
copy to Stevens Contractors, Inc.
Forgy Surveying
March 26, 1990
Engineering Department
300 West Ash Street
P.O. Box 736
Salina, KS 67402-0736
Telephone (913) 827-9481
Mr. Robert Marietta
148 South Seventh Street
Salina, Kansas 67401
Re: Watermain Extension
Mayfair Addition
Dear Mr. Marietta:
All of the necessary permits and approvals have been received
by our office for the construction/installation of a watermain
extension to serve a portion of Blocks 4 and 5, Mayfair
Addition. You may, therefore, proceed to have your contractor
commence construction work.
The contractor will be required to furnish the normal
certifications for the ductile iron pipe, valves, fittings,
hydrants, etc.
If you have any questions concerning this project, please
contact me.
Sincerely,
C
/
Don Hoff,
DH/mp
cc: ZAF & Associates
Stevens Contractors, Inc.
Salina
Lid
uo-Ar[rcA tm
'III!'
logo
DIRECTOR
OF ENGINEERING
DONALD E. HOFF, P.E.
MEMBER... LEAGUE OF KANSAS MUNICIPALITIES NATIONAL LEAGUEOFCMES