oil pipeline repair 12/23/1980� cc DEPARTMENT 300 WEST ASH STREET DEAN BOYER. P. E. P. O. BOX 748 CITY ENGINEER SAUNA. KANSAS 87401 AREA CODE 913 827-9481 December 23, 1980 Mobil Pipeline Co. Regional Claims Department 310 East Second Street - Room 305 Wichita, Kansas 67202 Attention: Mr. Ivan Arick Dear Sir: DONALD E. HOFF. P. E. AW. CITY ENGINEER D. W. BASSETT TRAFFIC ENGINEER On December 1, 1980, your company repaired a broken crude oil pipe- line in Section Eighteen (18), Township Fifteen (15) South, Range Two (2) West and in Section Thirteen (13), Township Fifteen (15) South, Range Three (3) West of the Sixth Principal Meridian in Saline County, Kansas. The excavation required to locate this break was within the "critical area" of our Flood Protection System. Any excavation and backfill within the "critical area" (zone between three hundred feet (300') riverward and five hundred feet (500') landward of the centerline of the levee) shall be in accordance with the Corps of Engineer's requirements. One of their requirements state that the excavated area shall be backfilled with imper- vious materials compacted to 90% of maximum dry density. As shown on the enclosed test report, submitted by Geotechnical Services of Kansas, Inc., the compaction of the backfill material does not meet the Corps of Engineer's requirement. Therefore, we are requiring that the back- fill material placed on December 1, 1980, be removed and then re -compacted by your organization to the specified limit on or before April 1, 1981. Please notify our office prior to commencing any field operations in this area. Additional soil testing will be required to verify the compaction results. If you have any questions concerning this matter, please contact me. Sincerely, Don Hoff, P.E. % DH:MKP ` ENC: (1) MEMBER ... KANSAS LEAGUE OF MUNICIPALITIES - NATIONAL LEAGUE OF CITIES Date 19 December 1980 Job No. Lab No. D1148t�u 1I6 GEOTECHNICAL SERVICES OF KANSAS, INC- TEST NC TEST REPORT MMSV4= tai SCUM Fewd Strad sa m, Karon 04M Test Made for Mobil Pipeline Co. project Pipeline Repair Location Salina, Kansas Architect or Coecractoc Engineer Semple of Compacted Backfill Source 13, T Excavation Sec. 13, T15S, R3W Sampled at West Side Ohio Street Road Dace Received 18 December 1980 For Moisture-Oensity Curve see Lab Report A 079 TEST RESULTS FIELD DENSITY & COMPACTION TEST (3" O.D. Shelby Tubes) Test No. 1 2 3 Vent Pipe Measured from West West West Distance N or S 1.5' S 1:5' S 1.5' S Distance E or W 2' E 2' E 2' E Depth below top ground 0'-1.5' 1.5'-3.0' 3.0'-4.5' Depth below exist. fill 0'-1.5' 1.5'-3.0' 3.0'-4.5' Field Moisture, % 19.1 12.9 15.7 Field Ory Density, Lb./Cu.Ft. 87.2 91.0 78.8 Optimum Moisture, % 17.3 17.3 17.3 Maximum Dry Density, Lb./Cu.Ft. 103.2 103.2 103.2 Compaction, % 85 88 76 Specified Compaction = 90% of Maximum Dry Density. REMARKS: Excavation is just east of toe of dike. Respectfully submitted, ea 2 - Mobil Pipeline Co. GEOTECHNICAL SERVICES 1 - City Engineer OF KANSAS, INC. By File. 1