June 22, 1990
B.L.P. Memo 90-5
MEMORANDUM TO: COUNTY ENGINEERS/ROAD SUPERVISORS/HIGHWAY ADMINISTRATORS
CITY ENGINEERS (GREATER THAN 5,000)
CITY ENGINEERS (LESS THAN 5,000 WITH PROJECTS)
CONSULTING ENGINEERS
SUBJECT: Study Report
The purpose of this memorandum is to inform you that the Study Report used
to provi de i nformati on when requesting Locati on and Desi gn Approval has
been revi sed. Please use the attached Study Report form on all future
submittals.
. Pl ease note that i nformati on requested is essenti ally the same as on the
old form although it appears in a different format.
If you have any questions or need assistance, please contact Jerry Priem or
Carl Titsworth in'this office at (913) 296-3861.
.~a/?~;
LARRY W. EMIG, P.E.
Chief of Local Projects
LWE,: V LE: tdt
Attachment
.;\
"""'-"'. .,.
.
Sheet 1 of 2
STUDY REPORT
PROJECT NO.:
CITY OF
COUNTY
This study report is for location and design approval
enced project. The proposed improvement is on
road/street ____, an off-system road/street
of the refer-
an on-system
located
Additional right of way is____, is not
required.
The alignment of the existing section to be improved is straight
, curved , and the terrain is flat ____, rolling , or
hilly The route is posted for ____ MPH, is not posted ____.
The operating speed for the road is approximately MPH.
The route
such as:
waterfowl
enters,
parks
refuge
goes through, or is adjacent to publicly owned land
, recreation areas , wildlife refuge ,
, historic sites , others specify
The geometries for the proposed project are for a MPH minimum
design speed and a traffic volume of VPD. These geometries meet
or exceed the design guidelines contained in the "Combined Secondary
and Off-System Road Plan" for:
New or completely reconstructed
Secondary Roads/Streets
Off-System Roads/Streets on bridge approaches
Secondary/Off-System Roads/Streets
(curb and gutter)
Rehabilitation, Restoration and Resurfacing (3R)
An opportunity for a location and design public hearing was:
not offered because of insignificant R/W acquisition.
offered and no requests were received or requests
were withdrawn
offered and the public hearing which was requested
was held on
in at
p.m. or a.m. Replies made and action taken in
regards to items discussed at the hearing which
required additional consideration have been pre-
viously submitted to the Bureau of Local projects or
are attached to this study Report.
Revised 6.7.90
D.O.T. FORM 1305
'0 -" "
"
Sheet 2 of 2
The request for approval is for:
grading
roadway width ft
shoulder slopes :1
surfacing
light-type surfacing
bituminous surfacing
subgrade modification
other (explain)
seeding
bridges
~
Lenath
Rdwy
Width
Creek
Alternatives considered and the reasons for not using them are as fol-
lows:
The improvement will provide a safe and adequate road/street facility
for the affected area. It is in keeping with the county's/City's plan
of improving their local road/street system on a priority needs basis.
The social, economic and environmental effects of this project upon
the community and the traveling public have been considered and are
believed to be beneficial.
Signed:
Title:
Dated:
Revised 6-7-90
D.O.T. FORM 1305