Loading...
uprr crossings 1/26/1976W STATE HIGHWAY COM MSION OF KANSAS NOTICE OF ACCEPTANCE OF CONTRACT OF PORTION OF OONTRACr �{... „ Ed's••, „.�� � n ge o. Length of Project: Gn: 40"a. Miles 'MMs sriusF Previous Surface Type New Surface Type Date Contractor Completed Work contract You are hereby notified thati described as follows: �portron von 4MMOV is was accepted on t 9_ and you are hereby relieved of your responsibility for maintenance Of barricades, lights and watchmen, and will be required to perform no additional work or maintenance subject to the require - meat of the Standard Specifications and the following conditions: Recon Approved by: ��a`� _ Resident Engineer. Division Engineer. This is to affirm that I agree to the acceptance of the portion of the contract and to the conditions stated above. Signed Nona: Contractor's signature required only for acceptance of portion of contract. This form to be mailed to the Con- tractor and to the Engineer of Construction on the date of acceptance of the project. 11-* for S. R. C. Fomr Na 282 C OF CONTRACT )e�l 14 STATE IOGHWAY COhOMSION OF KANSAS NOTICE OF ACCEPTANCE OF PORTION OF CONTRACT Previous Surface Type New Surface Type Date Contractor Completed Wok 19 is contract You are hereby notified that described as follows: portion of contract 404W 06 VMS accepted o� 19— and you are hereby relieved of your responsibility for maintenance of barricades, lights and watchmen, and will be required to perform no additional work or maintenance subject to the require - went of the Standard Specifications and the following con A Reo=m Approved by: . Resident Engineer. Division Engineer. This is to affirm that I agree to the acceptance of the portion of the contract and to the conditions stated above. Signed NoTB: Contractor's signature required only for acceptance of portion of contract. This form to be mailed to the Con- tractor and to the Engineer of Construction on the date of acceptance of the project .r r for S. H. C. Fo Nu 232 it OF CONTRACT STATE HIGHWAY OF KANSAS NOTICE OF ACCEPTANCE ❑ OF PORTION OF CONTRACT 001110 4"M Previous Surface Type New Surface Type Date Contractor Completed Work -&04M19 contract YOU are hereby notified that the, described as was accepted onZNOAUV 05 V6 t9 and you are hereby relieved of your responsibility for maintenance of barricades, lights and watchmen, and will be required to perform no additional work or maintenance subject to the require- ment of the Standard Specifications and the following conditions: Item R . C�q, Y�A roved by: Resident Engineer. Dtofaion Engineer. This is to affirm that I agree to the acceptance of the portion of the contract and to the conditions stated above. Signed NoTz: Contractors signature required only for acceptance of portion of contract. This form to be mailed to the Con- tractor and to the Engineer of Construction on the date of acceptance of the project. sr.r for S. FL G Foar No. 282