shalimar add. storm sewer 2/4/1976February 4, 1976
Dean Boyer, City Engineer
City -County Building
300 West Ash
Salina, Kansas, 67401
Dear Dean,
ve `%, %KC.
2075 South Ohio - P. O. Box 554
SALINA, KANSAS 67401
(913) 827-9373
Re: Lots 1-6, Block 9; Lots 2 & 3, Block 13
Shalimar Plaza Addition
With reference to our conversation on January 30, 1976 concerning the Smoky Hill
River Channel directly east of the captioned property, I wish to thank you for your
immediate response in sending Mr. Don Bassett to the site to observe the filling of
the channel by the placement of earth by scraper on the haul road on the east bank
and the movement of the earth into the channel by the use of a motor grader.
I have photographed the operating machinery and the filling operation which was con-
ducted on January 30th and January 31st, 1976.
I would like to request that the city take the necessary action to have the earth
removed from the east bank of the Smoky Hill River channel in order that the
channel will occur in the location it was certified to exist on the 10th day of
December, 1958 when Mr. H. F. Harper, engineer, certified the plat of the Shalimar
Plaza Addition.
A study of the plat indicates that the center of the Smoky Hill River occurred
approximately 100' east of the Northwest corner of Lot 1, Block 9, Shalimar Plaza
Addition and in the development of Lots 1 through 6, Block 9, it will be necessary
for us to re-establish the center of the Smoky Hill River as it was certified to
exist when the plat was filed.
I would also like to request that the City Engineering Department be alert to the
height of the dike being constructed east of the river, in order that it not be
so high that it has the effect of reducing the impoundment area, which area is, as
I understand it, the subject of an agreement between the U. S. Army Corp of Engineers
and the city of Salina. Additionally the construction of the dike to so high a level
that it would have the effect of protecting the industrial area contained within the
loop of the river to the east, at the expense of that part of the Shalimar Plaza
Addition lying east of Ohio street (which might then be flooded as a result of the
reduced storage area), should be a matter of continuing concern to the City Engineering
Department, and I trust, will be.
(continued)
"Your Only Real Security — A Home of Your Oton"
Mr. Dean Boyer, City Engineer
Page 2
Erosion by natural forces has exposed a considerable amount of concrete drainage
pipe at the terminus of the drainage line in the storm sewer easement occurring
along the southerly line of Lot 6, Block 9, and along the northerly line of Lot 1,
Block 13, Shalimar Plaza Addition. Prior to the filling of the riparian land
west of the historic center of the channel, we request that the city repair the
storm sewer line as needeiin advance of the leveling of the riparian land.
Again, thank you for your prompt and efficient response to my telephone call of
January 30, 1976.
DGH:rc
cc: Norris Olson, City Manager
L. 0. Bengston, City Attorney
�.f
LETTER dated FEBRUARY 4, 1976 from D. V., INC. - DOUGLAS HILL
Paragraph 1
- Mr. Bassett did observe the construction
of a road
on the top of the east bank of the river
channel.
This earthen material was being used for
road building,
purposes and was not being placed in the
channel.
Paragraph 2 -
The machinery referred to was operating,
but no filling
operation was being conducted.
Paragraph 3
- As near as we can determine the east bank
of the Old
Smoky Hill River Channel, at the location
indicated,
is in its natrual state and we will take
the necessary
action to see that it stays that way.
Paragraph 4 -
Any action in regard to these claims would
have to be
conducted by Mr. Hill.
Paragraph 5 - Any damage to the flood protection capabilities of our
flood protection works would be a continuing concern
to this office and Mr. Hills trust is well founded.
Paragraph 6 - The storm sewer is in need of repair and it is the
City's responsibility to do this. This office still
has the same concerns expressed in paragraph 5 and
will still take necessary action to see that Mr. Hill
does not fill any of the defined channel as it exists
today.
Paragraph 7 - You are welcome ?