Loading...
Change Order No. 4 DEPARTMENT OF PUBLIC WORKS 300 West Ash . P.O. Box 736 Salina, Kansas 67402-0736 ~ TELEPHONE: 785-309-5725 FAX: 785-309-5713 WEBSITE. www.salina-ks.Oo.." CHANGE ORDER PROJECT: landfill Cell 5 Construction PROJECT # : 09-2769 lOCATION: CHANGE ORDER No. : 4 CONTRACTOR: Larkin Excavating, Inc. THIS AGREEMENT, made and entered into this 21 st day of May , 2010 , by and between the City of Salina, Kansas, Owner, and the above named Contractor, modifies the existing contract dated 8/10/2009 , under the above subject and project number in the following particulars to wit: 1. The specifications and drawings for street improvements in the City of Salina, Kansas, dated 8/10/2009 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. DescrIption ProposolQ1.taottly CO-4a Prefabricate and install 2 ft. concrete ring on vault 1 I.s: CO-4b Form, pour, strip, and backfill front curb/footing 1 I.s. CO-4c Pipe welder on standby 2 weeks .. '1\ '.. ri " 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. Item. N~. I)_rlptl~n QTY U...it Price Total CO-4a Prefabricate and install 2 ft. concrete 1 L.S. $ 5,028.55 $ 5,028.55 ring on vault CO-4b Form, pour, strip, and backfill front 1 L.S. $ 1,324.20 $ 1,324.20 curb/footing CO-4c Pipe welder on standby 2 WEEKS $ 398.08 $ 796.16 TOTAL $ 7,148.91 3. The contract time for completion by reason of this change o days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS CONTRACTOR, SECOND PARTY LARKIN EXCAVATING, INC. \- J-f/Af?C: OFty City Engineer ~~ ATTEST: ~~-