Loading...
6.2 Repair Water Treatment PumpCITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 08/23/2010 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: APPROVED FOR NO: 6 AGENDA: UTILITIES DEPARTMENT ITEM NO. 2 BY: BY: Martha Tasker Page 1 ITEM: Authorize the repair of High Service Pump No. 202 at the Water Treatment Plant, Project No. 10-2839. BACKGROUND: The Water Treatment Plant utilizes seven (7) hi gh service pumps to de liver water from two underground clear wells (storage tanks) to the water distribution syst em for consumer use. These clear wells allow the Water Treatment Plant to run at a constant rate, while the demands of the water distribution system vary. There are two (2) - 200 Horse Power (HP) pumps and five (5) - 250 HP pumps. High Service Pump No. 202 (250 HP) has been in service since 1992, and requires a rebuild due to normal wear. Quotations were solicited for t he removal, inspection, and reinstallation of the high service pump. Quotations are as follows: Company Removal/Inspection/Reinstallation Douglas Pump Service, Inc. 4719 Merriam Dr. $ 6,590.00 Overland Park, KS 66203 Layne Christensen Company 1011 W. Harry Street $15,570.00 Wichita, KS 67213 Douglas Pump Service, Inc. was selected to pull the pump and take the pump to their shop to disassemble, inspect, and provide a quote for materials and labor to rebuild the pump. The cost for the materials and labor to rebuild t he pump is $17,828.75. The total cost to pull, disassemble, inspect, rebuild and reinstall the pump is $24,418.75. FISCAL NOTE: A budget allocation of $117,000.00 for the Maintenance of Process Equipment is included in the 2010 Water Treatment Plant Operating Budget under line item 690-380-150-772.191, and currently has a balance of $60,100.42. Funds are available for the repair of High Service Pump No. 202. CONFORMANCE WITH THE STRATEGIC PLAN: Related Strategic Plan goals may include: GOAL: The City will provide the highest quality of services, consistent with governing body direction, available resources and staff commitment to quality. Action Item: The City Commission will maintain it s commitment to the municipal organization by providing direction and resources that will allow them to meet established expectation. COMMISSION ACTION: Authorize the repair of High Service Pump No. 202, by Douglas Pump Service, Inc., Overland Park, Kansas in an amount of $24,418.75.