Loading...
CIP 2010 - 2014 City of Salina 2010 through 2014 Capital Improvements Program Table of Contents Page Transmittal... ....................................................................................... ...1 2009 (Current) Projects........................................................................ .....2 2010 Projects............................................................ ........................... ...4 2011 Projects................................................ ....................................... ...6 2012 Projects....................................................................................... ...8 2013 Projects................................. ............... ....................................... ...9 2014 Projects....................................................................................... ...9 Identified but Unfunded Projects......... ................................................... .....10 Development Infrastructure............ ........................ ... ..............10 Transportation... ... ... ... ... ... ... ... ... ... ... ... ... .,. ... ... ... ... ... ... ... ... .., .11 Flood and Drainage... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...12 Water and Wastewater...... ... .................. ......... ............ ...... .... .13 Buildings and other facilities... .................. ... ............ ............ ... .14 2010 Sub-CIP.................................................................................... ...15 Annual Summary Tables.......................................... ........................... ....24 Long Term Fiscal Impacts... ............................................................... .....29 DEPARTMENT OF FINANCE AND ADMINISTRATION Rodney Franz, Director 300 West Ash, P.O. Box 736 Salina, Kansas 67402-0736 TELEPHONE (785) 309-5735 FAX (785) 309-5738 TOO (785) 309-5747 E-MAIL rod.franz@salina.org Website: www.salina-ks.gov Salina To: Salina City Commission Transmitted herewith is the proposed 2010 through 2014 Capital Improvements Program and Budget. This document aggregates all(0f our significant capital planning material in a cohesive and consistent way. It includes the CIP and Debt Management policies, major capital projects, our annual "sub-CIP's", and financial projections relating to those items. The plan incorporates $91,116,101 in projects over the five year period. Carryover projects (projects originally scheduled for 2009 that were not initiated) will be added at the close of the 2009 fiscal year. The multi-year schedules also include an allowance for each sub-CIP classification, although specific sub-CIP items have not been designated in future years. The sub-CIP includes capital purchases and projects that are normally done each year using various cash resources. These include: 1. CIP planning (concept and design studies) 2. Vehicles and Equipment 3. Major equipment (very large pieces of equipment that may be purchased through cash, lease-purchase, or bonds). 4. Buildings and Facilities maintenance. New buildings and major rehabilitation are not included here. 5. Computer Technology replacements 6. Park Improvements done with Special Alcohol Funds 7. Traffic control upgrades/maintenance 8. Minor Stormwater Improvements (Flood and Drainage Fund cash) 9. Water/Wastewater Enhancements 10. Annual Street Projects funded by Special Gas Tax 11. Special Sales Tax projects All Sub-CIP elements will repeat annually throughout the plan period, although amounts may change from year to year. Major capital projects and purchases are scheduled by the year in which construction is anticipated to begin. Projects for which funding is not available within the project period, or for which the project scope has not been sufficiently defined are shown in the;'identified but unfunded" section. Information for each project includes the project title and brief description or need, the contemplated funding source and timing, and the estimated cost of the project. . Project Summary by year: Year 2010 2011 2012 2013 2014 Total Sub-CIP $ 7,818,100 $ 7,157,000 $ 7,202,000 $ 7,827,000 $ 7,927,000 $37,931,100 Maior Proiects $ 24,645,001 $ 9,270,000 $ 8,860,000 $ 6,410,000 $ 4,000,000 $ 53,185,001 1 2009 Proiects (currentlv underway): South Ninth Street Belmont to Riffel Reconstruct South Ninth Street from a point just south of Belmont Boulevard to a point approximately at Riffel Drive, including reconstruction of the intersections and traffic control at Schilling Road. Reconstruction of this segment is necessary due to the age and deteriorating condition of this major arterial providing service to a primary shopping and employment district. Project Cost: $5,750,000. Bonds will be issued with a term of not to exceed 20 years, with the first payment in 2011. Annual debt service will be an estimated $401,213. Fire Headquarters Remodel Design and construction of updated administrative offices, restrooms, station kitchen, and installation of decontamination equipment for medical equipment. Current administrative offices are overcrowded and poorly arranged and lack ADA compliance in many areas. The offices also lack acceptable female restroom facilities. The upstairs kitchen is too small and needs to be redesigned and expanded. There are no facilities or areas specifically designed for the decontamination of medical equipment due to body fluids. Project Cost: $1,800,000. Bonds will be issued in 2010 for a term of 15 years, with the first payment in 2011. Annual debt service will be an estimated $160,000. Bicentennial Center Improvements Construction This is a multi-faceted project incorporating improvements to both the interior and exterior of the building. This project includes rebuilding the exterior parking, concession stand improvements, Arena Improvements, replacement of ceiling tiles in Heritage hall, sound systems, HV AC improvements/replacement, restrooms, floor coverings, and kitchen/catering improvements. Much of this facility is original construction, from the late 1970's. Phase I includes rehabilitation of the meeting rooms and Heritage Hall, including ceilings, floor coverings, wall treatments, HVAC improvements, and multi-media systems improvements Phase I project cost: $1,000,000. GO Bonds to be issued in 2010 for a term of 10 years, with the first payment in 2011. Annual debt service is estimated to be $125,000. Bonds issued for this project will be financed largely with one cent of the transient guest (approved in 2009). "Kenwood Cove" Aquatics Facility This is the construction of a modern aquatics facility to replace the 50 year old swimming pool serving Salina and the surrounding region. The facility will feature a zero depth entry, a wave generator, and assortment of water slides, a "lazy river," a diving and 25 yard competitive area, and a variety of other water features along with a modern bathhouse and concession area. Project Cost: $11,500,000. This is financed with 10 year GO Bonds, issued in 2009, to which the Special Sales Tax proceeds are pledged. The annual cost of debt service will be approximately $1,350,000. Construction of Landfill Cell 4 (GO Temporary Notes) The construction of the fourth Sub-title D cell, to be ready for use in 2010. Project Cost: $1,600,000. The project will probably be financed over a four year period with temporary notes to be re-paid with Landfill fees. No direct property tax impact. The annual cost of of debt service will be $440,000. 2 Major Equipment: Replace Ladder Truck (GO Bonds) #402 is a 1983 Pierce L TI Ladder Truck. The unit has reached the end of it's service life according to fire service norms and unit serviceability. The aerial has no safety interlocks or overrides. Unit 402 does not meet NFPA standards for an enclosed cab for fire personnel. The vehicle is experiencing some maintenance issues, including hydraulic leaks, overheating, rusty and deteriorated tanks and plumbing, and electrical problems. The truck is subject to front-line service and according to the Fire Chiefs Handbook, "apparatus over 25 years old should not be used for front-line service." NFPA standards recommend a 20 year replacement cycle. Project Cost: $1,000,000. Bonds were issued in 2009 for a term of 10 years, with the first payment in 2011. Annual debt service will be an estimated $130,000 Manhole and Pump Station Rehabilitation Manhole Rehabilitation on on East Dry Creek interceptor gravity line and Discharge piping repair in pump stations. Project Cost: $1,000,000. Financed with Revenue bonds in 2010. First Payment is due in 2011. Annual Debt Service is projected to be approximately $80,000 per year for 20 years. 3 2010 Proiects: BiCentennial Center Improvements, Phase II: This is a multi-faceted project incorporating improvements to both the interior and exterior of the building. This project includes rebuilding the exterior parking, concession stand improvements, Arena Improvements, replacement of ceiling tiles in Heritage hall, sound systems, HVAC improvements/replacement, restrooms, floor coverings, and kitchen/catering improvements. Much of this facility is original construction, from the late 1970's. This project has been identified as appropriate for aesthetic enhancements under the City's Community Art and Design policy, which provides for up to 5% of the project cost to be allocated for that purpose. Specific scope of Phase II (as well as potential future improvements) will depend largely on the outcome of a feasibility and operations analysis to be conducted during early 2010. Phase II project cost: $1,500,000+. The Community Art and Design element could be a maximum of $75,000. Bonds are to be issued in 2011 for a term of 10 years, with the first payment in 2012. Annual debt service is estimated to be $195,000. Bonds issued for this project will be financed partially with one cent of the transient guest (approved in 2009), as well as some property tax supplementation. Marymount Reconstruction This project will involve conversion of Marymount road to a 2-lane urban section with a combination bicycle and Pedestrian path constructed along side from Iron Avenue to Crawford Street. This project will also incorporate significant drainage improvements at Marymount and Glen to address now inadequate drainage at that area. Project Cost: $1,100,000. Funding is to be provided by the Special Sales Tax Fund. Water Meter Replacement The accepted industry standard, promulgated by the American Water Works Association, is that meters should be replaced at about 15 years of service. The accuracy standard, again promulgated by the American Water Works Association, is that the acceptable accuracy range is 97% to 100%. While this sounds like a fairly high standard, a 3% loss to the City of Salina equates to about $400,000 to $600,000 per year in un-billed water and wastewater services. The City of Salina system consists of 20,411 meters. The bulk of these (about 19,400) are 1" or less in size. The remainder are larger, high flow meters, up to and including 1 0" in size. The age distribution of the installed base is now as follows: Over 30 years: 34 meters 20 to 30 years: 2,679 meters 15 to 20 years: 4,448 meters 10to 15 years: 7,711 meters 5 - 10 years: 3,452 meters o to 5 years: 2,687 meters This proposal would provide for a turnkey project to replace our entire meter inventory with current technology meters. This project is subject to the outcome of a detailed performance contract analysis to be done in early 2010. The project will be implemented only if it is "self supporting" in terms of revenue efficiency and/or cost reductions. Cost: $8,000,000. Financed with a 10 year revenue bond issue. Estimated annual debt service will be on the order of $1,000,000 per year, starting in 2011. The source of funds will be based on the existing rate schedule and increase water meter registration efficiency. 4 Levee Recertification One of the results of the Hurricane Katrina disaster was a requirement by FEMA that all flood control levee's in the United States undergo a "recertification" procedure. That procedure is a two step process: First, an engineering study to identify potential deficiencies in levee design, construction, or maintenance, and, second, remediation of those deficiencies. As a result, $450,000 in Special Sales Tax funding has been allocated in 2010 to conduct the initial recertification studies. Wastewater and Force Mains Rehabilitation Replace WW Pump Stations #10, #6; Upgrade WW Pump Stations #28 and Force Main, #29 and Force Main; Replace Force Main at WW Pump Station #44; Replace portion of Force Main at WW Pump Station #49; Abandon WW Pump Station #9 and Install Gravity Line to #49; Replace Force Main at WW Pump Station #34; Relocated Force Main for Station #30. Project cost: $2,000,000. Financed with Revenue bonds in 2011. Annual payments are projected to be approximately $160,000 per year for 20 years. The first payment will be due in 2012. Waterline Improvements The Water Distribution System engineering analysis identified a significant portion of the system in which proper functioning with regard to fire flow and consistently high water quality is in peril do to the aging condition and occlusion of water lines. Approximately 228 miles of line is of cast iron construction and more than 40 years old. This line is subject to occlusion from mineral deposits which reduces flow. While the product is disinfected and safe to consume, the water quality is undesirable water quality due to discoloration, and taste and odor issues. This project will replace approximately 40,000 feet (8 miles) of waterline per year. At this rate of replacement, it will take 28 years to replace the cast iron stocle with PVC line Project Cost: $4,000,000 annually, in 2009 dollars. This project will be financed through the issuance of 20 year revenue bonds each year. Southeast Salina Wastewater Extension: Construction of a collector system for South East Salina to serve the Magnolia and Markley Road Vicinity. Project Cost: $2,150,000. Financed with Revenue Bonds. Bonds issued in 2012, with first payments due in 2013. Annual Cost is about $172,POO per year City-County Health Department Parking Lot Renovate and resurface the joint City-County Health Department Parking lot. Project Cost: $70,000. The Source of funding will be the Special Sales Tax. Airport Industrial Area Utility Improvements Installation of water mains and ancillary improvements to serve the Airport Industrial Park. The project includes an 18" fire line with a 550,000 gallon fire storage tank, a 12" potable water line, and wastewater collection lines. Cost estimate is $5,300,000. If financed with a 20 year revenue bond, the annual cost will be $425,286 per year. 5 2011 Proiects Complete Cedar Ridge Drive to Markley Road This length of roadway (about 1,050 feet) would be upgraded to match the urban section of Cedar Ridge Drive to the west. This segment of roadway is actually the extension of Cloud Street. Project Cost: $358,000. To be financed from the Special Gas Tax. Salt Storage Building Construct a salt storage building to protect road treatment material from inclement weather, and to protect the environment from potential contamination from runoff from the storage location. Project Cost: $155,000. This is to be financed from the proceeds of the Special Sales Tax. Sunset Park Restrooms Replace the existing depression era restrooms in Sunset Park with modern, heated, handicapped accessible facilities. Project Cost: $225,000. This is to be financed from the proceeds of the Special Sales Tax. South Well field Design The Raw Water Supply Study identified a number of improvements to the South Wellfield and plant that will be necessary to insure a high quality reliable water supply through 2060. This project will incorporate a number of improvements to existing facilities, as well as new facilities that may be required. The design phase provides for a detailed engineering design of facilities necessary, and sound cost estimates. The construction phase of this project is currently located in the "Identified but unfunded" section of the Capital Improvements Program. Project cost: The design of the project is anticipated to cost $1,350,000. Financed with Revenue Bonds in 2012. Annual payments are projected to be approximately $108,000 per year for 20 years. The first payment will be due in 2013. Waterline Improvements The Water Distribution System engineering analysis identified a significant portion of the system in which proper functioning with regard to fire flow and consistently high water quality is in peril do to the aging condition and occlusion of water lines. Approximately 228 miles of line is of cast iron construction and more than 40 years old. This line is subject to occlusion from mineral deposits which reduces flow. While the product is disinfected and safe to consume, the water quality is undesirable water quality due to discoloration, and taste and odor issues. This project will replace approximately 40,000 feet (8 miles) of waterline per year. At this rate of replacement, it will take 28 years to replace the cast iron stock with PVC . line Project Cost: $4,000,000 annually, in 2009 dollars. This project will be financed through the issuance of 20 year revenue bonds each year. Downtown Well field improvements The Raw Water Supply Study identified a number of improvements to the Downtown Wellfield that will be necessary to insure a high quality reliable water supply through 2060. This project includes re-drilling 4 wells, upsizing of piping, and increasing the air stripper capacity. Project Cost: $2,990,000. Financed with Revenue Bonds in 2012. Annual payments are projected to be approximately $240,000 per year for 20 years. The first payment will be due in 2013. 6 Wayfinding Continuation of the Wayfinding project began in 2009. Project Cost: $100,000. This is to be provided by the Special Sales Tax proceeds. Fire Engine Pumper Replacement Replace a 1981 fire engine that is experiencing significant maintenance issues due to rust in the plumbing system and age. Project Cost: $450,000. This is to be provided by the Special Sales Tax proceeds. 7 2012 Proiects Greeley Avenue Bridge Replacement of the Greeley Avenue over the old Smoky Hill River Channel. This project is now scheduled for 2012 at a cost of $500,000 from General Obligation Bonds over a 10 year period. The estimated annual payment will be $62,000. This project has been identified as appropriate for aesthetic enhancements under the City's Community Art and Design policy, which provides for up to 5% of the project cost to be allocated for that purpose. The Community Art and Design Budget for this project has been set at $15,000. Note: The scope, cost, and timing of this project may change as a result of the Smoky Hill River Renewal Master Plan outcome. Wayfinding Continuation and completion of the Wayfinding project began in 2009. Project Cost: $150,000. This is to be provided by the Special Sales Tax proceeds. Oakdale Park Restrooms Replace the existing depression era restrooms in Oakdale Park with modern, heated, handicapped accessible facilities. Project Cost: $160,000. This is to be financed from the proceeds of the Special Sales Tax. landfill Cell 5 Construction The construction of the fifth Sub-title D cell, to be ready for use in 2013. Project Cost: $1,600,000. The project will probably be financed over a four year period with temporary notes to be re-paid with Landfill fees. No direct property tax impact. Annual cost of $440,000. Reconstruction and widening of East Magnolia Road from Ohio Street to the levee. This project will reconstruct, widen, and improve East Magnolia Road from Ohio Street to Smoky Hill River Bridge, and will incorporate a combination Bike/pedestrian path linking the existing Bike path along the Smoky Hill River to the Ohio Street Corridor. Development along East Magnolia coupled with the deteriorating condition of this old rural section mandate replacement and widening to meet projected traffic volumes. The strategic plan adopted by the City Commission includes a vision of alternate transportation methods, which this project will incorporate. Project Cost: $3,000,000. $1,400,000 is anticipated from the Kansas Department of Transportation, with $1,600,000 to be financed with GO Bonds. Bonds will be issued in 2013 for a term of 15 years, with the first payment in 2014. Annual Debt service will be an estimated $145,000. Waterline Improvements The Water Distribution System engineering analysis identified a significant portion of the system in which proper functioning with regard to fire flow and consistently high water quality is in peril do to the aging condition and occlusion of water lines. Approximately 228 miles of line is of cast iron construction and more than 40 years old. This line is subject to occlusion from mineral deposits which reduces flow. While the product is disinfected and safe to consume, the water quality is undesirable water quality due to discoloration, and taste and odor issues. This project will replace approximately 40,000 feet (8 miles) of waterline per year. At this rate of replacement, it will take 28 years to replace the cast iron stock with PVC line Project Cost: $4,000,000 annually, in 2009 dollars. This project will be financed through the issuance of 20 year revenue bonds each year. 8 2013 Proiects Closure, Landfill Cells 3 and 4 Final closure on Landfill Cells 3 and 4, pursuant to Subtitle D regulations. Project Cost: $1,600,000, to be financed over an 8 year period. Annual payments will be approximately $240,000 per year, payable from Solid Waste fees. Waterline Improvements The Water Distribution System engineering analysis identified a significant portion of the system in which proper functioning with regard to fire flow and consistently high water quality is in peril do to the aging condition and occlusion of water lines. Approximately 228 miles of line is of cast iron construction and more than 40 years old. This line is subject to occlusion from mineral deposits which reduces flow. While the product is disinfected and safe to consume, the water quality is undesirable water quality due to discoloration, and taste and odor issues. This project will replace approximately 40,000 feet (8 miles) of waterline per year. At this rate of replacement, it will take 28 years to replace the cast iron stock with PVC line Project Cost: $4,000,000 annually, in 2009 dollars. This project will be financed through the issuance of 20 year revenue bonds each year. Wastewater Plant Preliminary Design The Salina Wastewater Plant is due for an upgrade to meet EPA and KDHE permitting requirements. The project will convert anaerobic digestion to an aerobic treatment process utilizing biological nutrient removal. The existing primary and secondary treatment systems will be removed, and new facilities substituted. This provides for the preliminary design of the facility in preparation for construction in 2015. Project Cost: $810,000. The source of funding will be revenue bonds payable over 20 years. The annual payment will be about $65,000 per year. 2014 Proiects Waterline Improvements The Water Distribution System engineering analysis identified a significant portion of the system in which proper functioning with regard to fire flow and consistently high water quality is in peril do to the aging condition and occlusion of water lines. Approximately 228 miles of line is of cast iron construction and more than 40 years old. This line is subject to occlusion from mineral deposits which reduces flow. While the product is disinfected and safe to consume, the water quality is undesirable water quality due to discoloration, and taste and odor issues. This project will replace approximately 40,000 feet (8 miles) of waterline per year. At this rate of replacement, it will take 28 years to replace the cast iron stocl< with PVC line Project Cost: $4,000,000 annually, in 2009 dollars. This project will be financed through the issuance of 20 year revenue bonds each year. 9 Identified but Unfunded Proiects Identified but unfunded projects are those for which a need has been identified, but which have no funding mechanism or time frame assigned. DEVELOPMENT RELATED INFRASTRUCTURE: East Salina Master Plan Improvements This project would provide public facilities to serve the area North of Crawford Street to Country Club Road and east of the City Limits to Holmes Road. The estimated cost of the improvements is $5,500,000. These would be funded in part by Special Assessments to benefiting property, but there would also be significant agricultural deferrals, cost recoveries, and other at-large components to the project. West Magnolia 1-135 Infrastructure This consists of utility service improvements to the area immediately west of 1-135 at Magnolia Road. This would be ultimately funded largely through Special Assessments, however, it would include significant deferrals and these would place a demand on taxes for debt service, or utility system revenues. 10 TRANSPORTATION: Final Settlement, North Ohio Grade Separation KDOT has provided a preliminary finding of final costs on the Grade Separation project. We are anticipating that the final audited project will result in an additional amount due to KDOT of approximately $500,000. South Ninth Street, Riffel to Water Well Reconstruct South Ninth Street from a point just south of Riffel Drive to Waterwell Road, including reconstruction of the intersections and traffic control at Lowes Drive. Reconstruction of this segment is necessary due to the age and deteriorating condition of this major arterial providing service to a primary shopping and employment district. The project cost is estimated at $5,500,000 in 2009 dollars. Magnolia Improvements from the Smoky Hill River Bridge to Markley Road. Reconstruct Magnolia to a 3 Lane urban section from the Smoky Hill River Bridge to Markley Road. Estimated cost of $1,500,000. Smoky Hill Bridge on East Magnolia. Reconstruct Bridge to match road segments. Estimated Cost: $1,500,000 Holmes Road, Magnolia to Country Club This consists of improvements to Holmes Road from Magnolia to Country Club Road, complimenting the East Salina Master Plan improvements. Cost is estimated at approximately $2,500,000, to be funded through Special Assessments and General Obligations. Magnolia Road from Centennial to 1-135 Interchange This road improvement complements other infrastructure improvements in the area, and contemplates the improvement of this stretch of roadway to a three lane urban section. Estimated cost is approximately $3,000,000, and would be payable largely from General Obligation Bonds. Water Well Road from Centennial Road to Ohio Street. This project would improve Water Well Road to a three lane urban segment all along the Southern boundary of our Community, providing service to several critical Commercial and Industrial locations, as well as to potential future residential areas. The estimated cost is $4,000,000 Centennial Road from Schilling to Waterwell Road This provides for the completion of Centennial Road improvements through the full length of the Airport Industrial Park. No current cost estimate. North Ohio from North Street to Elm Street This segment of street is the last remaining section of Ohio that has not been widened and improved. Estimated cost is about $1,100,000, and would be funded with General Obligation Bonds. Rebuild Intersection at Cloud and Ninth Street This intersection is located at the Ninth Street Transition from a four lane segment to a three lane segment. No estimated cost. Markley Road from Old Airport to Magnolia Improve this segment of road to an urban standard. No estimated cost. 11 FLOOD AND DRAINAGE: Flood Control Levee Improvements for Certification One of the results of the Hurricane Katrina disaster was a requirement by FEMA that all flood control levy's in the United States undergo a "recertification" procedure. That procedure is a two step process: First, an engineering study to identify potential deficiencies in levy design, construction, or maintenance, and, second, remediation of those deficiencies. The Engineering study is funded in 2009-2010. However, the scope and cost of any improvements that might be required are unknown. Prescott Drainage: Potential drainage improvements to East Prescott Avenue from Santa Fe to the Rail Road tracks. Cost is currently unknown. 12 WAfER AND WASTEWATER FACILITIES: Wastewater Treatment Plant Improvements Improvements are needed to our Wastewater Treatment processes in order to comply with the Kansas Department of Health and Environment Surface Water Nutrient Reduction Plan by 2020. The project will convert anaerobic digestion to an aerobic treatment process utilizing biological nutrient removal. The existing primary and secondary treatment systems will be removed, and new facilities substituted. Preliminary Design is scheduled for 2013. Construction is anticipated to begin in 2015 or 2016, and will take several years to complete. The preliminary cost estimate for this project is on the order of $12,000,000 in 2009 dollars. South Wellfield Improvements The Raw Water Supply Study identified a number of improvements to the South Wellfield and plant that will be necessary to insure a high quality reliable water supply through 2060. This project will incorporate a number of improvements to existing facilities, as well as new facilities that may be required. The "survey" cost estimate for the improvements is $21,650,000 in 2009 dollars. 13 BUILDINGS, FACILITIES, and OTHER: Fire Headquarters Remodel, Phase II The second phase of this project is estimated at $1,200,000. This project will improve the living conditions of fire personnel, the efficiency of the administration, the movement of fire apparatus in and out of the station, and the safety of fire personnel in providing adequate facilities to decontaminate ambulances and medical equipment. Downtown Parking, Trash Corrals This project would expand and improve the public parking areas serving the downtown area, as well as provide ancillary improvements-new and expanded trash corrals. The cost of the project is unknown at this time. Downtown Lighting Replace the decorative lights throughout the downtown district. Cost estimates vary widely, depending on options and scope of work, but could easily exceed $2,000,000. Indian Rock Lodge Replacement . The existing Indian Rock Lodge was an open air shelter with brick columns that has been enclosed to allow it to be used year round. It is the second most used facility in the City, and due in part to it not having been designed as an enclosed structure, it is in deteriorating condition. It does not include a kitchen or restroom facilities. The replacement building would be a multi-use building with a kitchen, restrooms, and a large meeting area. The cost of the facility is estimated at $400,000. Smoky Hill River Trail Improvements Construction of a Concrete and agricultural lime surfaced hike-bike trail following the old Smoky Hill River Channel through the City, starting and ending at Bill Burke Park, plus one segment along the top of the levee from Magnolia Road to Schilling Road. The total length of all of the trail segments is approximately 10.3 miles. The Smoky Hill River Master Plan currently underway will likely identify other improvements for this area. The estimated cost for the trails construction is from $4,900,000 to $7,900,000, depending on the mix of surfacing material used. 14 City of Salina 2010 Sub-CIP 1/28/2010 BUILDINGS & FACILITIES Estimated YTDIB,d ~ o Fund DeptlDlv. Proj. # Description Cost Ifferen, ;:t Notes General General Pohce/admlnlstralion P&R/Bld maint Enlarge,remodel PD lab Golf Maint Bldg-coat & seal metal roof with liquid rubber $12,000 $24,000 $0 $10,705 Take from Perpetual Care Fund? $37,000 Training, Electrical, mandated by 0: General P&R/cemetery P&R/Bld maint General Perpetual Care Fund P&R/cemetery Tuck point, seal/patch walls & repair front steps, Hillcrest Mausoleum $34,000 TOTAL BUDGET: $ ESTIMATED COST TOTAL: YTD/BID COST TOTAL: REMAINING BUDGET: REMAINING FUNDS: $ 250,000 $250,705 $0 -$705 250,000 City of Salina, Kansas 2010 Capital Budget 15 1/28/2010 City of Salina 2010 Sub-CIP 1/27/2010 CIP PLANNING Estimated YTD/Bid Fund DeptlDiv. Project # Description Cost Cost Difference $0 BUDGET: TOTAL GENERAL: $0 $0 $0 TOTAL BUDGET: $ ESTIMATED COST TOTAL: $ YTD/BID COST TOTAL: $ REMAINING BUDGET: $ REMAINING FUNDS: $ 16 City of Salina 2010 Sub-CIP PARK IMPROVEMENTS 1/27/2010 Estimated Fund DeptlDiv. Proj. # Description Cost Spec. Parks Parks/Rec East Crawford Soccer Complex Bonds $30,000 Spec. Parks Parks/Rec Smoky Hill River Master Plan $100,000 Spec. Parks Parks/Rec Repair Tennis Courts, Sunset Park $18,000 Spec. Parks Parks/Rec Sunset Gardens Improvements $15,000 Spec. Parks Parks/Rec Roll Cap for ECRA Fields 1-4 $3,000 Spec. Parks Parks/Rec Foul Poles for 12 Game Fields $8,700 Spec. Parks Parks/Rec Wind Screen for ECRA Fields 1-4 $6,000 Spec. Parks Parks/Rec Dean Evans Stadium Backstop Padding $8,000 Spec. Parks Parks/Rec Wayfinding Park Signs $10,000 Spec. Parks Parks/Rec Concrete Tee Pads at Thomas Park Disc Golf $2,500 Spec. Parks Parks/Rec Lakewood/lndian Rock Trail Signs $2,000 Spec. Parks Parks/Rec Lakewood Native Gardens $2,500 Spec. Parks Parks/Rec Dean Evans Artificial Turf $36,000 BUDGET: $ 230,000 TOTAL SPECIAL PARKS: $241,700 TOTAL CITY BUDGET: PRIVATE DONATIONS: ESTIMATED COST TOTAL: YTD/BID COST TOTAL: REMAINING BUDGET: REMAINING FUNDS: $230,000 $11,700 $241,700 $0 $0 $230,000 17 City of Salina 2010 Sub-CIP 1/28/2010 STORMWA TER PROJECTS/PLANNING Estimated Fund DeptlDiv. Proj. # Description Cost Flood and Drainage PIW Engineering Ray Avenue/Linda Lane Design $ 50,000 Flood and Drainage PIW Engineering Highland Meadows Hamlet Bank Erosion $ 50,000 Flood and Drainage P/W Engineering Materials to repair Levee Scours $ 26,000 Flood and Drainage PIW Engineering Smoky Hill River Bank Erosion $ 50,000 Note: These Projects will deplete the fund entirely, including reserves. BUDGET: $ 176,000 TOTAL FLOOD & DRAINAGE: $ 176,000 TOTAL BUDGET: $ ESTIMATED COST TOTAL: $ TOTAL YTD/BID COST TOTAL: $ REMAINING BUDGET: $ REMAINING FUNDS: $ 176,000 176,000 176,000 18 City of Salina 2010 Sub-CIP 1/28/2010 STREET REPAIR Estimated Fund Dept/Div. Proj. # Description Cost Gas Tax Gas Tax Gas Tax Street Street Street Concrete Pavement Rehab Latex Modified Micro-Surfacing Asphalt Mill and Inlay $540,000 $900,000 $30,500 BUDGET: $ 1,487,000 TOTAL GAS TAX: $1,470,500 Sales Tax Sales Tax Street Street Marymount resurfaceing and drainage Crack and Joint Sealing (Various Locations) $1,100,000 $200,000 BUDGET: $ 1,300,000 TOTAL SALES TAX: $1,300,000 TOTAL BUDGET: $ ESTIMATED COST TOTAL: $ YTD/BID COST TOTAL: $ REMAINING BUDGET: $ REMAINING FUNDS: $ 2,787,000 2,770,500 16,500 2,787,000 19 City of Salina 2010 Sub-CIP 1/28/2010 SIDEWALK & RAMPS Estimated Fund DeptlDiv. Proj. # Description Cost Gas Tax Street Ramps $50,000 Gas Tax Street Arterial Sidewalks $100,000 BUDGET: $ 150,000 TOTAL GAS TAX: $ 150,000 TOTAL BUDGET: ESTIMATED COST TOTAL: YTD/BID COST TOTAL: REMAINING BUDGET: REMAINING FUNDS: $150,000 $150,000 $0 $0 $150,000 20 City of Salina 2010 Sub-CIP 1/28/2010 TRAFFIC SIGNALS I INTERSECTIONS Estimated Fund DeptlDiv. Project # Description Cost Gas Tax Street 2010 LED Lights Gas Tax Street High Intensity Traffic Signs Gas Tax Street Traffic Cameras, Ninth and Magnolia Gas Tax Street Traffic Cameras, Santa Fe and Ash $52,000 $51,000 $17,500 $17,500 BUDGET: $ 138,000.00 TOTAL GAS TAX: $138,000 TOTAL BUDGET: $ 138,000 ESTIMATED COST TOTAL: $ 138,000 YTD/BID COST TOTAL: $ REMAINING BUDGET: $ REMAINING FUNDS: $ 138,000 21 . . . Estimated YTD / BID . Fund DeptlDlv. Descnptlon Cost Cost Difference City of Salina 2010 Sub-CIP VEHICLES & EQUIPMENT General General General General Police/Operations Police/Operations Police/Operations Police/Administration General Fire/Operations General Fire/Operations General Fire/EMS General Fire/Operations Parks 1 ton, 4WD, extended cab pickup 1 ton, 4WD, crewcab pickup 2010 C4500 Chevy Medium Duty Chassis Medic UniUAmbulance, power cot, and equipment Water/WW Water/WW Water/WW Water/WW Water/WW Water/WW Water/WW Water/WW Water/WW Utilities/W Plant Utilities/W Plant Utilities/W Plant Utilities/WW Plant Utilities/Water Distribution TOTAL BUDGET: ESTIMATED COST TOTAL: 22 1/2712010 $30,000 $30,000 $30,000 $15,000 $35,000 $35,000 $168,000 $12,000 $13,000 $25,000 $25,000 $18,000 $52,000 $110,000 $36,000 $45,000 $70,000 $90,000 $18,000 $36,000 $1,846,000 $1,613,000 City of Salina 2009 Sub-CIP 1/28/2010 Estimated Fund DeptlDiv. Project # Description Cost System Enhancements Solid Waste Solid Waste Install Perimeter Fence per KDHE $32,000 BUDGET: $ 32,000 TOTAL Solid Waste SUBTOTAL: $32,000 UtIlities Utilities Utilities Utilities Utilities Utilities Utilities Utilities Utilities WTP WTP WTP WWC WWC WWC WWC WTPIWWTP Water tower pamtmg Wyatt tower Downtown wellfield improvement design South wellfield improvement feasibility study Sanitary sewer point repairs Sanitary sewer manhole rehabillitation (Carryover $100,000) Sanitary sewer replacement SCADA Upgrade, Collection System Car over, Re lace SCADA S stem, Water and Wastewater Plants $300,000 $180,000 $180,000 $65,000 $175,000 $450,000 $50,000 $475,000 TOTAL BUDGET: $ ESTIMATED COST TOTAL: $ YTD/BID COST TOTAL: $ REMAINING BUDGET: $ REMAINING FUNDS: $ 2,632,600 2,632,600 32,000 23 :I: '" "5 "tl '" .<: u 11\ c .. ii: .... c '" E '" ~ e =a~O lIl- ~ '00;0 i:' '5. N i3~ :;! C> N C> C; N C> a ~, 0 a a a a a a a C> a a a a a a a a 0 .... a a a a C> a <I> "'0 C> a C> a a a a C> a a a a a a a a C> a a <I> a C> a a a a a '" a a CD .... a a a a a a a a a C> a a a C> . ci ".; ci ci cD ci cD cD '" ~ ".; ci ci ci ci ci ci ci ci iii' ci ci ci 0 '" ~ '" '" I'- I'- '" '" '" I'- a a '" '" I'- a a a -.t '" '" '" '" . -.t N y; y; CD, y; "', CD co "', a ~, .... <I> '" a a U> CD "', CD U> <I> <I> <I> y; y; '" .-: y; cD ~ '" <I> ".; '" .f .f <I> y; <I> N <I> <I> <I> <I> <I> <I> <I> <I> N <A- <A- M N .... ~ ~ ~ a a a - a a a a - . a a a - a a a a - a a CD a a a a - ci .f ".; ci ci ci ci - a N N . a '" a a N <I> I'- a '" a . <I> <I> cD '" ".; '" <I> <I> <I> <I> ~ - a a a - a <I> !iii g~ - - a - Iii . ".; a . I'- a ~ "', a .. y; .f <I> - - . - . a a a a - - ". a a a a - . a a a a - ci ".; .f ".; a CD .... I'- .. . y; <I> I'- "', <I> . y; a a - - a a - - a a - ".; '" . . I'- '" - '" <I> <I> a - - . a - a - . ".; .... y; . I' I' . a - - a - a - I ci - '" M . <I> / ". : a - - a - - . a - . cD . . I'- . y; - a a a - - . a a a - - a '" a ci ci 00 .. '" I'- M . y; ...., <I> y; I a - - . a a - . ci - . M - . N <I> a gi; a - a a a - a a a a a - a a a - a a a a 0_:+ a - a a a - a a a - ci a, ci - ci ci ci - ci ci ci - . a a a - a '" I'- '" '" '" y; N y; ~ .... <I> CD "'. CD <I> <I> <I> <I> y; y; <:: a a - 0 - . a a - ,I ~ . - a a - 'I ci 00 .. :0 '" CD <I> M . '" <I> .<: '" 0:: 15 'ili <:: ...J "m ~I .~l; :2 iii ~ '" .l!l E -'" c: Iii 0 <:: ~' 0- 0..1 u.. '" g '" '" 0>' '" I "tl '" E e ie .l!l c .s <:: 0:: <:: 'e '" '" Q) ~ '" c 0 '" > 0- <:: Ii '" <:: <:: e E '" E $ '" '" u ~ '" 0 c '" E -e '" <:: E <:: ~ 0:: U 0. '" > '" :s: 0 '" g E I', .l!l . .s E e Q) 0. ~ Q) <:: :0 ~ O/S Q) . > 8::1 .. '" C <:: Q) 0. e '" -'" '" $ '" - '" '" ~ " $ Q) Q) $ u .s 0 Iii en :J~ "tl <:: en ~ (5 .l!l E "0 0. <:: <:: <:: <:: '" 0> ~' ,~ E . <:: '" I .s ,Q 0; I 0- 0. en 0 "m x "g ..c: '" a:: ,g1 e <:: Q) . '" -g.,iI "tl 13 m E . "tl CO :2 '" 'I g U E e 0- "'= 5. u () '" ~ Q) m :::l . c l- . ~ "tl '" C a:: 0 ~ $ Q; " u.. '" C 0- m '" m 0:: "" :I: 1ii D- o "tl 'e > '" ~ .~iii W ..c: Q; 1:: ~ co c "E :::' c O/S <:: e it ,~ c . 'e .... ~ :::l $ . Q) Q) :::l ~ $ O/S c Qi <:: 1ii i'.l <:: "tl . 0 9 '" $ 0. ~ Q) '" w $ :::l :::l C ~ '" E () () u.. . 0:: I 0:: en :2 0 '" & , ~ ~ .s m Q) E c Q) 0 ~ 0 I!,! u ~ <:: ~ E Qi u (3 E () "* ~ B ~ iE $ Q) $ ..c: $ ..c: 1il Q) E -'" Q) ~ E '" ~ c:- :; 5:", b . -e :::l ::J !Ii <:: 'S 0 Iii "tl .9 ~ ;' Q) . I '" '" 0 '" '" 0 0- 0- ' Q) Ui en i:ii :s: '" (} :s: :s: . co I, () () 0- en I- > en :2 en ...J Z <( <( <.9 " "0 "E c U) ,,=> "0 uw. ~ lD ro ~ CD ~ "E m ;:J 0 $ Q) C (j C a:: ~ (5 ~ ~ a:: (') iii w ...... N C') """ o o N U) S! ..- N U) '" U) c '" >:: of ,~ n; C/) '0 "" U J: CIJ "'5 " CIJ .c u VI c '" ii: .... c '" E '" ~ e :.:0- ~.5 ~ '0 Iii C) ~aN U~ '<t ~ C> N C> o N o o o '0 o . ~ o o . 0 o o N . .,. . . . . . . . . . . . . o o . 0 o o N .,. '" o o o o o N .,. o o o o '" * o o o o '" .,. -- o o o o 00 .,. '" W ~ '0 ., u.. 015 ~ c :Q 'S lXl .~ C ,'I C '" 0: a: <5 o o o on I'- '" .,. o o o o o ;';> o o o on I'- N .,. g ""5 c .c " w t: ~ w 'g E -'" o (ij () 0.. o o o o o ;';> o o o o '" ;';> o o o o '" ;';> o o o o o ~ .,. J'3 c w E w ,. 0' c.: .s ,'" o .,. g i' .~ '" 0: 9 ~ ~ 0 0:: .!g "0 e c 0.. ~ I Oi ,. ~ E ~ 0 Ui en o 0 o 0 o 0 0- a '" <0 1'--- W ;';> o 0 o 0 o 0 ci a- D <0 ::- ~ .,. o o o o '" I'- .,. '" c o ~ ~ .$ c '=: '" "00 to g. ,g 0:: en " lE l'1 I-- E ., 0, o c: Q) ~ en o o o N '" 00. ;';> o o o o o o N' .,. N o o o .: '" .,. o o o o o '<t .,. o o o o o o N .,. o o o o '" <0 .,. o o o on .... ;';> o o o o o ;';> o o o o o '" .,. c w ~ :~ UJ 015 '" w TI :c w > '" c w E w " c '" .c c UJ E "* en ID ) '" '" ~ .$ ~ C> C> C> ...: ~ ...: .,. o 0:;'0 t,O g glr;g~!g 1.C'i Lf'i~O-:, a ~ ~ ~ ~ :' g Efl,:f! ;;;;;i; ~ I' - - - l- g 8;:).g:t ~ 6-46i1( 1.0 0 "0>:: cn_" o_::,mp![ "'-'11, oor;:t,,;'bN ~ tR- :il! {FJ- !:\I (FJ- !~! - - - - - e- - - - - - - - - - - - - - - - - - o 0 o 0 o 0 on '" '" N E.9. ~ - - - L~ tfJ $. ~ E C C t; g' 0 ~ ~ :Q g .~ Q) "5 ~ ~ e ~lXlO::<iiO- ~~~Ew _ 0.. ~ ~ ~ J:: € c: '5 '* OJ S ~ Iii en g:': g g 0"1 a 0 oil 0- 0 8L:: 0 ~ N 'I fI7 yt "'" ,1'- _ C> C> C> o I'- N a; .,. - - o o o o o ;';> - - .... N .... J'3 C w" E' w, ~i!1 ci :: .s ~ C w E w " ., Q,!:'i' w, " 0:: = w ID gJ E .c :0 a. a.. I . c 0> ~ ~ ~ '9 o C C C ~. UJ ~ en Ii' ~ o ~ u:: " <ii' !E ~ - - - o o o o l.O '" o o o o o ;';> ~ .,. w c: w '" w C 0:: .2 ~ 1ii ~ ~ ~ ~ ~ C "ffi en S :2 ~ ~ ~ I-- .9:! !! "'0 C C C W W :0 () () u.. U ,2 "@ ~ ro m :0 :0 C :I :I (!l o o o o o .... .,. o o i5 S! '" N :;; C <D '-' '" " c: o ro Q) ~ "c Q) :s c: ::J 0 JB ai 0 c > <D Q) (5 (.) 0:: C) ijj ~ N " - - '" re c: ~ '" .S ro (J) o .2;> t5 J: QI :i '0 QI .c u VI c: '" ii: 1:: QI E QI ~ e ~~N II) - '"" '0 SO :?i"~N ()(,) ;! o N o .... o N a a a . ci a . ~ a a . a ci a N . iF> . . . .. . . . . . . . . . . '" a a a ci a N iF> . . . a a . a ci a N iF> a a a ci ex> iF> a a a ci ex> iF> en QI - '0 '" LL cIS g :g '5 en g 'c c: '" 0:: ~ cj a a a '" ..... '" iF> a a a ci a .... iF> a a a '" ..... N iF> 12> o o c .c u QI t:: ~ .l!l ~ E o () a a a ci a W a a a ci a W jg -i, C-:' QI E: ~!t, 0.< f -'" m a. a a a ci LO W a a a ci LO W a iF> a a a a a a ci 0- a CD ~ 6; iF> a a a r-: '" CD, .... iF> a a a ci a a N iF> N a a a r-: LO iF> a a a ci a '<t iF> a a a ci a a N iF> a a a '" '" N iF> a a a '" '<t W. a a a a a a 0- ci a CD ~ Z; a a a ci a ...., W a a a ci a '" iF> a a a ci a LO iF> ~ E '" 0:: '0 c '" en -'" 0; ~ Q) '0 U'i g 'c c '" 0:: o/S ~ .~ It (;; ~ E B (J) en C Q) E ~ c '" .c c en UJ 5 E 15 "* E CD "El ~ ~ Q) U) '" .l!l E o ~ 5 "* 'E .!!!. 'g ~ 'm,:; ro, W ~ g.J~PclS ~ 0::. (J) 13 ~ 10, :E :g $ ~-y~-grn 001- > ~ o o o N" o N ,..: ... o or~a;lla'ii' 0 g 8~:~ 8_ :~; 8_ :iii g~ c5 0,*0 0,1 a ~ ~'I::g-1]g:m g tI7 tI7 ~ c>? ~ t/7; Y7 W I- . - - - a a 0':0 0.+0 0;:1:0 0.0 CD CD ~J\;;;:,- il~~,:i-i~ a.' a 0-" a """-'I': Y; '; - - - - - - - - - - - - - - - - - - - - - a a a a a a 0- 0.:: o co'' W iF> - - .!!!. c Q) E Q) > c 0 en .2 g .!!!. @of C g~"O~ oUJcrnQ) .0>Q)00> 'e 0:: (,) 0:: 0 .. c.. ~ l.O .~ :c. O)~ o.s:2 ~ Q) ~ Ig ~ rti ~~!5~ID ~85&l~ . a a a ci a a .f iF> o o o o '" co as ... - - - - - - - - - - - - - - - ~ Q) ~.!Q '" Q) Q) ::,0 o o ~ ~ "' N :;; c " (,) <f) "0 C ~ Q) ~ ~ ~ as ijj 8 c > " Q) 0: (.) ~ <.9 iii ~ N '" - - a a a ci LO "'. .... iF> a a a ci a iF> a a a ci a '<t iF> ~ Q) en & 5 ~ ~ ~ ~ UJ .$ $ g .[6 ~ ~ ~ ~ .$ $ "0 c c c Q) Q) ::l () (,) LL o g ~ ~ (Q Q) ::i E}:i1r 53 ~ <(I~c> <f) III <f) C III >:: of .S l\i '" 'l5 ;,. i:3 :I: 0 0 0 0 0 0 0 ~ 0 0 0 0 ... 0 0 Ql 0 0 0 0 0 0 :; 0 .n 0 0 0 0 ~ "tl "" ..... 0 LO 0 CO ~ Ql ... "" ;;; ;;; "" ;;; .s::. ... c-J u ... VI c '" a: ..... c .. E .. ~ e ::c. ~.5~ 'l5]i~ .i::' '5. uJ :! o N o o o o o ;;; o o o .n ..... N ... o c; N 0 0 0 0 0 0 0 0 0 0 0 0 LO 0 CO ;;; 0, ;;; ;;; 0 0 0 0 0 ;;; 0 0 0 0 0 ~\ "", ;;; .... N " E " o U> "0 c: o m ~ ~ 'c ::J " c: c: 0 2 Ql 0 c: > " (J) '0 () 0:: <.9 iD ~ N '" U> ffi c: '" E ;1 " ~ ",- OLi .S m (j) a Q; "" 1il C3 ;: E Q) (; ~ U5 U5 ~ o N :I: '0 0 0 0 0 0 0 0 .,. ClI 0 0 0 0 "5 0.0 ci ci ~ -0 .... 0 II) S! ClI '" <;; <;; .s:: .,. u VI c '" ii: .... c CIl E CIl ~ e ~~-:t lIJ- ...... o J9 0 .a-"5. N t3~ :!: o N o o o ci o "', o o o 0.0 .... N .,. o o o ci LO <;; o o o ci o <;; ex> N 21 '" <: <)) "0 () <: 0 ro Q) ~ .C' CD <: :J 0 CD <: () C CD > CD CD '0 0 0: e> iii '" '" '" <: ~ .l!l E ro .S c '" ro w a:: if) E -0 '0 ~ c '" ~ "" ~:' In 2 U -'" '" E ~ ;;: ill -'" E 0; -0 Q ~ 0.. Vi lIJ, Ui o ..- o N - CO N - ..- c- O ,- t 19 0 Q)o.. 0- l/)19 '<t C '0.. ..- Q) ro ~.sS o'E ~ ..-EI- o 0 l/) N()Q) ......Qj ~(f.) 'O'Qj a: '(3 Q) 0. (f.) o o o o '<to ..-("') o N o o o o ("')0 ...... ("') o N o o o NO ..- 0 0("') N o o o ..- 0 ..-0 0...... N tit tit tit tit 0000 0000 0000 cicicici OOLOO LO_N ("')_..- ..- ..- tit tit tit tit 0000 0000 0000 cicicici OOLOO LO(",)("')"- ..- ...... tit tit tit tit 0000 0000 0000 - - - - 0000 OOLOO N_'<t ("')_..- ..- ..- 00 0 00 0 00 0 cici 0 LO CO CO ........- t- ("') tit tit tit tit tit tit 0000 0000 0000 cicicici OOLOO t- '<t ("')_ ..- ..- 0000 0000 0000 LO 0 LO- 0- NLOLOO N'<t..-..- tit tit tit tit tit tit tit tit 00000 00000 00000 ocicicicici ..-OLOOLOLO O..-CONCO("') N 000 000 000 cioo LOt-O "<;t ..- ...... C Q) E Q) Q.. ......0. C ::l iJj Q) l/) ......E-o c 0. c Q) .- 0 E 5-[0 :!::LUo.. E-oO g ~ ,Q ()l/)..c: ......Q)O ~O..c: '~:.c t:: e Q) 0 o..>Z ..- tit tit tit tit tit tit tit tit ......... ...... C Q) OlE ,S Q) -t:Q.. ro 0. Q) o..::l -0 ......(f.) 'w ffi ~ c 19 >.EI- '<t l/) g (f.)Q)-ot:: (/) l/)~ E ro ::lroro" ,_!::! l/)...;w o.CJ E=I1: 0 -oc Q).......-O,-Ol e :0 c 'co g 0 1:) e Q) .S ...... (f.)19S~P'iij Q)OO E~ ~ Q) '- '- ~ Q) '0' Q) ::l 0::: > -0 Q) Q) ,- I '- 0::: ~ [0 ~ pccc~ 0..~_Q) '- ro ::l Q) Q) '- >....... '- Q) Ol Olro Q)......croc""cO" :e u.. () () U S ::l 0.. .- ~ cQj u u Q) 0 0...... 0l0'6 Q) ...... '- p p 0::: () E Q) c ...... ,S Qj Q) Q) ro ro I '>.l/)LU(f.)--o Q) c ::l ::l 5:' >. L' c Q) ~ >. ~ b Q) 0'" 0'" Q) :!:: ro ::l .!::: ro g ro (f.)CJ<(<(-l()~(f.)u..(f.)>O o o o o LO '<t ("') LOOOLOOLO 000000 N ("')0 LOOLO ~aiciN'ciN' O)OLOLOOLO o)O"<;tLON("') ...,f ~ ..-- ..-- tit tit tit tit tit tit tit o o o o LO LO ("') OLOOLOOLO CONOOOO COLOONON ciN'ci~ci("')- LOO)LOO)OO) COCOLOO)Nt- ~~ tit tit tit tit tit tit tit 000000 ("')LOOCOOCO LO......OCOOCO ~aicicicici ("')t-COLOOLO COt-t-CON"<;t ~~ tit tit tit tit tit tit tit o o o o CO CO ~ ..-0)0000 CO '<t 0 ("')0("') '<tOOLOOLO <t5LOci~ci~ o OCO("') 0("') COt-COCON'<t ~("')- 0) N tit tit tit tit tit tit tit o o o o t- LO '<t 0......0..-0..- coOOCOOCO o'<to'<to"<;t ..,f'N'ci<t5ci<t5 oqo ("')t-o 00 Ill)COLOCON'<t ~ ~ '<t- tit tit tit tit tit tit tit l/) ...... u Q) 'Q' '- 0.. Qj ...... o I- ~ LO r-..: l/) CO 1:) Ol Q) .~ Q) 'e ::l ~o.. l/) ro - l/) l/) I- ~ <(C"-Q) 0 c 'Q;' EQ) ("') 2: :e o E a:;Q):g ~ SEE ~<( O..-cE Q)O::: 0 o..c~OU5:- ..c:ro,",,()Q)OQ) l/)....,2......Ou::o 8..c~ ~..c:-..c:~ ~ 'e 'e ~ ~ g! ()o..o..()()<( l/l e o e13 ro (J) a::'o cO: (J) (J) E .2 (J) ~ > (J) roe(/) ~ 0._ roE.o (/)_(J) ......roO 0......, s.... >- '0. 2 :!: ro ro 005: v2 ..- l/l o ro C\lS 0'0 ..- e o ro C\l Q) 1il S ro- c e o :J ~ ~ ~<{ 13'-- ugJ~~ '- . 2i2-2-0 '0 (J) '0 (J) ~tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- ..-t--..-cocnC\lCO ..-..-(")00 cn..-C\l. 66000 l/l X 0') e :.0 e .2 (J) ,~ '!: (J) - ro ~ 0.. o .- a.: Q) Sl"-~OOO~~~~ .0 C\lCOIOOOOOIO(")..-OOIO -0 COCOIO..-C\lC\l..-..-oo ro-~aici r--:-cri...tcxir--:-cxiai ~ ~~e~n::~~~~~~~ ro co tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- 5: (J)_ Z.o ro (J) _0 o I- 0.. o (J) :5 l/l IOU ..- (J) 0'0 C\l '- 0.. E o '- LL :E (J) o 5: (J) z l/l (")U ..- (J) 0'0 C\l '- 0.. coco coco cot--t--t--t-- OOOOIOIOC\lOt--v"- IC\lC\lC\lC\lC\l..-ooo cici~r--:-cxiNC"i...tu-i CO(")IO(") 10 v coco 0 ~CO-r-L{)CO~'Vf'--r- ~~NNN"<t...t...t1O tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- -r-~~~ 'oc:-~~ "'t"- cncncncn NC\lNN co co co co cncncncn tfi- tfi- tfi- tfi- 000000 (")(")(")(")(")(") 000000 u-iu-iu-iu-i101O coco coco coco tfi- tfi- tfi- tfi- tfi- tfi- l/l ..-U ..- (J) 0'0 C\l '- 0.. 00000000 (")(")(")(")(")(")(")(") 00000000 aiaiaiaiaiaiaiai "<tv"<t"<t "<tv "<tv (")(")(")(")(")(")(")(") tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- l/l oU ..- (J) ~.~ 0.. co co coco co co coco co ~~~-r-'r"'r"'r"~'r" (") (")-(")-(")-(") (")-(")-(")-(")- aicncncncncncncncn (")(")(")(")(")(")(")(")(") 000000000000000000 tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- o (") l/l c~ (J)(J)0 ,~ E C\l '!: (J) (J) U ro 1il~(J) S ~2 O:::~tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- '- (J) o e :; cLL;StS g ~'3 2 E~.oU5 <{ 'ffi (J) (J) >01il <{ 0::: o 0 0.0 0 0 0 0 0 t--"<t..-OOIOC\lcnCO(") 'cncncnOOOOOOt--t--t-- o - N C"i ...t u-i cD r--:- 00 C\l "<tCOOOOC\lv coco (")cocnC\lCOcnC\lIOOO ....-:~~C\I-NN (J):E :0 (J) ~o 'ffi 5: ~ (J) Z OcnlOcococococococo C\l..-(")t--t--t--t--cococo cocot--ocncncncncncn aiaicxi...tC"iC"iC"iu-i101O 010100(")(")(")101010 1.OI'-OO')-r--r-~"'-'T"'""''''- ..-~NNNNNN Q) '- z.Etfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- 0') e :;:; l/l_ 'x ~ UJo l/l l/l (J) ...J "<to..-ooooooo OIOCOC\lC\lC\lC\l(")(")(") co..-C\lcnoooooo "<ir--:-r--:-~NC\l-Ncicio IOIOCOC\lcncncnt--t--t-- t--_ t--_ t--_ cn co co co co co co ..- ..- ..- tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- vcncocococococococo C\lcocncncncncncncncn C\lt--cncncncncncncncn ...tcDu-iu-iu-iu-iu-iu-iu-i1O co..-C\lC\lC\lC\lC\lC\lC\lC\l C\l 10 0000 00 00 0000 0000 NC\lNNNNNNNN tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi-tfi- '-O..-C\l(")"<tIOCOt--OOcn co...-...-...-...-...-...-...-...-...-...- (J)oooooooooo >-C\lC\lC\lC\lC\lC\lC\lC\lC\lC\l Debt Service Projections Schedule J For Current and Future Projects 2010 2011 2012 2013 2014 Summary Uses of Funds: Total Existing Debt At-Large $ 4,836,296 $ 4,572,394 $ 4,498,365 $ 4,298,922 $ 3,984,724 Property Owner Share $ 1,574,628 $ 1,532,425 $ 1,492,408 $ 1,457,892 $ 1,427,615 Enterprise Share $ 314,012 $ 313,510 $ 312,434 $ 310,667 $ 78,053 Total All Existing Issues $ 6,724,936 $ 6,418,330 $ 6,303,207 $ 6,067,481 $ 5,490,392 Total CIP At-Large $ $ 285,185 $ 480,185 $ 480,185 $ 687,185 Property Owner Share $ $ $ $ $ Enterprise Share $ $ $ $ $ Total Future Projects $ $ 285,185 $ 480,185 $ 480,185 $ 687,185 Total, all At-Large $ 4,836,296 $ 4,857,579 $ 4,978,550 $ 4,779,107 $ 4,671,909 Property Owner Share $ 1,574,628 $ 1,532,425 $ 1,492,408 $ 1,457,892 $ 1,427,615 Enterprise Share $ 314,012 $ 313,510 $ 312,434 $ 310,667 $ 78,053 Total Issue/Project $ 6,724,936 $ 6,703,515 $ 6,783,392 $ 6,547,666 $ 6,177,577 Annual Change in At-Large Obligation $ 1,860,331 $ 21,284 $ 120,970 $ (199,443) $ (107,198) Sources of Funding Motor Vehicle Tax $ 193,368 $ 199,169 $ 205,144 $ 211,298 $ 217,637 Enterprise Funds $ 314,012 $ 313,510 $ 312,434 $ 310,667 $ 78,053 Special assessments (Per City Clerk on existing Debt less 5% delinquency) $ 1,328,308 $ 1 ,297,103 $ 1,286,576 $ 1,275,947 $ 1,156,232 Prepaid Assessments (Escrow) $ 5,000 $ 5,000 $ 5,000 $ 5,000 Delinquent Assessments Collected $ 46,491 $ 45,399 $ 45,030 $ 44,658 $ 40,468 Property Owner Share in CIP Projects (Less 5% delinquency) $ $ $ $ $ Transient Guest Tax (1%) $ $ 123,291 $ 308,228 $ 308,228 $ 308,228 Delinquent Taxes @ 1.75% of prior year. $ 34,201 $ 38,951 $ 48,116 $ 54,337 $ 52,356 Transfer from Solid Waste for 2004-8 $ 512,009 Transfer from Special Recreation-2005-A $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 Sales Tax for Aquatic Center $ 1,350,000 $ 1,350,000 $ 1,350,000 $ 1,350,000 $ 1,350,000 Tax Stabilization Transfer from Sales Tax $ 650,000 Investment Income @ $ 61,210 $ 63,246 $ 24,179 $ 19,083 $ 23,351 Subtotal, Non-Property Taxes $ 4,524,598 $ 3,465,669 $ 3,614,708 $ 3,609,218 $ 3,256,325 Property Taxes Required $ 2,200,337 $ 3,237,845 $ 3,168,684 $ 2,938,448 $ 2,921,252 Total Required: $ 6,724,936 $ 6,703,515 $ 6,783,392 $ 6,547,666 $ 6,177,577 At Large General Property Tax Produced $ 2,225,792 $ 2,749,508 $ 3,104,980 $ 2,991,798 $ 2,896,886 Projected Valuation 396,994,937 404,934,836 413,033,532 425,424,538 442,441,520 Projected Levy rate 5.78 7.00 7.75 7.25 6.75 31 City of Salina, Kansas 2010 - 2014 CIP 1/28/2010